Summary
PRRES20246287
Building Permit - Residential
Issued
NEW DUPLEX
NEW DUPLEX. FINISHED/UNFINISHED BASEMENT. SUSPENDED SLAB. COVERED PORCH. STOP WORK ORDER generated on 05/14/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 05/19/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 07/21/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 08/04/2025 12:00 AM by username 'Dustin Agcopra'.
12/06/2024
12/27/2024
06/09/2025
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
KEVIN@ROCKCREEKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Duplex $2,555.61 $2,555.61 Paid 12/27/2024
Water Tap Fee $7,946.00 $7,946.00 Paid 12/27/2024
Water Meter Fee $1,496.06 $1,496.06 Paid 12/27/2024
Sanitary Sewer Development Fee $4,570.00 $4,570.00 Paid 12/27/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/27/2024
Residential Excise Tax Fee $1,240.32 $1,240.32 Paid 12/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Foundation Inspection - Commercial Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2025
7-17-25 Dustin A, Silt fence is down curb line and street needs cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence is still down 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Sidewalk Inspection Pending
Footing Inspection - Residential Passed 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
THIRD PARTY FOOTIN INSPECTION N FILE
Erosion Control Inspection Residential Failed 4/18/2025 04/18/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
04/18/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Underslab Electrical Inspection - Residential Passed 5/12/2025 5/12/2025 05/12/2025
Erosion Control Inspection Residential Failed 5/12/2025 5/12/2025 05/12/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
05/12/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/12/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair downed silt fence -spread gravel filter -maintain overgrown vegetation
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/12/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed - Stop Work 5/14/2025 5/14/2025 05/14/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/12/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair downed silt fence -spread gravel filter -maintain overgrown vegetation
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/12/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Partial 5/19/2025 5/19/2025 05/19/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
05/19/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair downed silt fence -spread gravel filter -maintain overgrown vegetation
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/19/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 5/19/2025 5/19/2025 05/19/2025
Water Service Inspection - R Partial 5/19/2025 5/19/2025 05/19/2025
Misc
Corrective Action Required
05/19/2025
Pex stubbed from foundation
Water Service Inspection - R Passed 5/21/2025 5/21/2025 05/21/2025
Misc
Resolved
05/21/2025
Pex stubbed from foundation
Underslab Plumbing Inspection - Residential Passed 6/3/2025 6/3/2025 06/03/2025
Erosion Control Inspection Residential Failed 7/17/2025 7/17/2025 07/17/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down curb line and street needs cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 7/21/2025 7/21/2025 07/21/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down curb line and street needs cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence is still down
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/21/2025
7-17-25 Dustin A, Silt fence is down curb line and street needs cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence is still down 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
All Rough Inspection - Residential Failed 8/5/2025 8/5/2025 08/05/2025
Miscellaneous Correction
Corrective Action Required
08/05/2025
-electric wire cannot support vent duct in master bedroom -fire block above all windows in the basement -all soffit in basement over 4’wide needs support to floor joist
Electrical Service Inspection Passed 8/5/2025 8/5/2025 08/05/2025
Gas Service Inspection - Residential Passed 8/5/2025 8/5/2025 08/05/2025
Rated Assembly Inspection Passed 8/5/2025 8/5/2025 08/05/2025
All Rough Inspection - Residential Failed 8/11/2025 8/11/2025 08/11/2025
Miscellaneous Correction
Corrective Action Required
08/05/2025
-fire block above all windows in the basement NORTH most window
All Rough Inspection - Residential Passed 8/12/2025 8/12/2025 08/12/2025
Miscellaneous Correction
Resolved
08/12/2025
-fire block above all windows in the basement NORTH most window
Suspended Slab Inspection Passed 8/12/2025 8/12/2025 08/12/2025
Rated Assembly Inspection Passed 8/25/2025 08/25/2025
Documents & Images
Date Uploaded File Type Document Name
12/06/2024 Application - Lot 45
12/06/2024 Tax Form - Lot 45
12/11/2024 Permit Codes Residential Plan Review
12/13/2024 Approved Plans APPROVED PLANS
12/13/2024 Plot Plan APPROVED PLOT PLAN
12/13/2024 Permit Codes Residential Plan Review
12/27/2024 Permit DS Building Permit
12/27/2024 Receipt Receipt for transaction: 2024-009673
04/18/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter Stop Work Order
05/19/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
07/16/2025 2025_06_10_1342-44 SW Winthrop Ter_GSlab_R_Sealed
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter Stop Work Order
07/21/2025 Letter Stop Work Order
07/25/2025 2025_06_10_1342-44 SW Winthrop Ter_GSlab_R_Sealed
08/04/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Lot 45 Suspended Slab Inspection
08/11/2025 Letter INSPECTION SUMMARY
08/12/2025 Letter INSPECTION SUMMARY
08/12/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home