Summary
PRRES20245644
Building Permit - Residential
Certificate of Occupancy
NEW DUPLEX
NEW DUPLEX. FINISHED/UNFINISHED BASEMENT. COVERED PORCH. SUSPENDED SLAB STOP WORK ORDER generated on 07/21/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 07/31/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER generated on 07/31/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 08/04/2025 12:00 AM by username 'Dustin Agcopra'.
10/23/2024
11/04/2024
08/05/2025
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
KEVIN@ROCKCREEKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Duplex $2,556.64 $2,556.64 Paid 11/04/2024
Right of Way Permit Fee $85.00 $85.00 Paid 11/04/2024
Residential Excise Tax Fee $1,240.32 $1,240.32 Paid 11/04/2024
Water Tap Fee $7,946.00 $7,946.00 Paid 11/04/2024
Water Meter Fee $1,496.06 $1,496.06 Paid 11/04/2024
Sanitary Sewer Development Fee $4,570.00 $4,570.00 Paid 11/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Partial 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/26/2024
3rd party pier letter uploaded only
Footing Inspection - Residential Passed 12/6/2024 12/06/2024
Misc
Resolved
12/06/2024
3rd party pier letter uploaded only
Miscellaneous Correction
Informational
12/06/2024
Footing inspection was completed by a third party
Underslab Electrical Inspection - Residential Passed 12/16/2024 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/16/2024
- 1401 & 1403
Sewer Service Inspection - R Partial 12/23/2024 12/23/2024 12/23/2024
Misc
Corrective Action Required
12/23/2024
1401 approved only
Sewer Service Inspection - R Passed 12/24/2024 12/24/2024 12/24/2024
Misc
Informational
12/24/2024
1401 and 1403 approved
Water Service Inspection - R Passed 12/27/2024 12/27/2024 12/27/2024
Erosion Control Inspection Residential Failed 12/27/2024 12/27/2024 12/27/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/27/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/27/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
12/27/2024
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Erosion Control Inspection Residential Failed 1/30/2025 01/30/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
01/30/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
01/30/2025
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Miscellaneous Correction
Corrective Action Required
01/30/2025
Replace or repair silt fence that has been damaged along the front south side, NW corner and along the north side of the lot Full erosion control measures must be in place and properly maintained until CofO
Underslab Plumbing Inspection - Residential Passed 1/30/2025 1/30/2025 01/30/2025
Suspended Slab Inspection Passed 2/26/2025 02/26/2025
Informational
02/26/2025
Garage suspended slab passed by a third party
Erosion Control Inspection Residential Failed 2/26/2025 02/26/2025
Miscellaneous Correction
Corrective Action Required
01/30/2025
Replace or repair silt fence that has been damaged along the front south side, NW corner and along the north side of the lot Full erosion control measures must be in place and properly maintained until CofO
Rated Assembly Inspection Partial 4/23/2025 4/23/2025 04/23/2025
Misc
Informational
04/23/2025
Attic space and floor joist space-okay
Gas Service Inspection - Residential Passed 4/23/2025 4/23/2025 04/23/2025
Electrical Service Inspection Passed 4/23/2025 4/23/2025 04/23/2025
All Rough Inspection - Residential Failed 4/23/2025 4/23/2025 04/23/2025
Misc
Corrective Action Required
04/23/2025
Both sides -Address ridge beam not contentious -missing rafter to ceiling joist connection at N AND S exterior walls where rafters landing on multiple blocks 1401 -strap top plate where lapped less than 24” inches front bedroom closet -fireblock wall space to ceiling space at rear kitchen wall (1/2” osb not approved for fire blocking) -seal top plate penetration right of rear slider -fireblock into furr down bed 4 closet --(2) full height studs each side of rear basement wall header 1403 -fire block wall space to ceiling space at kitchen pantry -anchor bolts to be in the middle 1/3 of sill plate SW corner garage
All Rough Inspection - Residential Failed 5/1/2025 5/1/2025 05/01/2025
Misc
Corrective Action Required
04/23/2025
Both sides -Address ridge beam not contentious
All Rough Inspection - Residential Passed 5/22/2025 5/22/2025 05/22/2025
Misc
Resolved
05/22/2025
Both sides -Address ridge beam not contentious
Rated Assembly Inspection Passed 5/28/2025 5/28/2025 05/28/2025
Misc
Resolved
05/28/2025
Attic space and floor joist space-okay
Driveway Inspection Partial 6/24/2025 6/24/2025 06/24/2025
Misc
Informational
06/24/2025
06/24/25 Jamie S, DW is formed and compacted. Approved to Pour.
Driveway Inspection Partial 7/1/2025 7/1/2025 07/01/2025
Misc
Informational
06/24/2025
06/24/25 Jamie S, DW is formed and compacted. Approved to Pour. 07/01/25 Jamie S, Curb on driveway needs to be grouted. Call in for reinspection once it has been completed.
Erosion Control Inspection Residential Failed 7/1/2025 07/01/2025
Miscellaneous Correction
Corrective Action Required
02/26/2025
Please clean up the silt that has come off the property at 1401 Winthrop and has ran down the road into the storm and street.
Miscellaneous Correction
Corrective Action Required
07/01/2025
Please clean up the silt that has come off the property at 1401 Winthrop and has ran down the road into the storm and street.
Erosion Control Inspection Residential Passed 7/3/2025 7/3/2025 07/03/2025
Sidewalk Inspection Partial 7/11/2025 7/11/2025 07/11/2025
Misc
Informational
07/11/2025
07/11/25 Jamie S, SW is formed, gravel compacted, and slopes are in compliance with city standards.
Driveway Inspection Passed 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
07/01/2025
06/24/25 Jamie S, DW is formed and compacted. Approved to Pour. 07/01/25 Jamie S, Curb on driveway needs to be grouted. Call in for reinspection once it has been completed. 07/16/25 Jamie S, DW is in compliance with city standards.
Erosion Control Inspection Residential Failed 7/17/2025 7/17/2025 07/17/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down along 14th st, silt has washed down street onto water tower property. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 7/21/2025 7/21/2025 07/21/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down along 14th st, silt has washed down street onto water tower property. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been taken down, mud tracked out on street , siltation has built up at bottom of hill.
Erosion Control Inspection Residential Failed - Stop Work 7/31/2025 7/31/2025 07/31/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/21/2025
7-17-25 Dustin A, Silt fence is down along 14th st, silt has washed down street onto water tower property. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been taken down, mud tracked out on street , siltation has built up at bottom of hill. 7-30-25 Dustin A, Sod is laid down and contractors are cleaning up silt on water dept property, Will need to get verification from water that the cleanup is sufficient 7-31-25 Dustin A, Stop work ordered applied to whole street due to non compliance of other lots. 7-31-25 Dustin A, All properties on Winthrop are STOP WORKED due to non compliance . 1. Concrete washout area is over flowing onto street. All concrete debris needs to be removed from street, washout needs to be maintained. 2. All silt needs to be cleaned from street and proper erosion control needs to be in place to keep this from happening. 3. Storm drains need to be protected, silt socks need to be replaced if they are compacted with mud or debris . Should not have grass growing out of them . After installed they need to be maintained . 4. All properties need to have erosion control in place and in working order. Must be maintained throughout 5. Before any work can be done on site an erosion control inspection will need to be scheduled. 6. NO WORK is allowed on site until these issues have been corrected.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/31/2025
7-17-25 Dustin A, Silt fence is down along 14th st, silt has washed down street onto water tower property. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been taken down, mud tracked out on street , siltation has built up at bottom of hill. 7-30-25 Dustin A, Sod is laid down and contractors are cleaning up silt on water dept property 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Sidewalk Inspection Passed 7/18/2025 7/18/2025 08/05/2025
Misc
Informational
07/11/2025
07/11/25 Jamie S, SW is formed, gravel compacted, and slopes are in compliance with city standards. 07/17/25 Jamie S, SW slopes are compliant with city standards. ADA landing connecting 1401 and 1407 sidewalk is cracked. Builder is aware of it and is going to replace it. 8-5-25 Dustin A, SW is poured to city specs. Slopes are in compliance .
Sidewalk Inspection Passed 8/5/2025 8/5/2025 08/05/2025
Occupancy Inspection - Codes Residential Full C of O 8/5/2025 8/5/2025 08/05/2025
Documents & Images
Date Uploaded File Type Document Name
10/23/2024 Application - Lot 41
10/23/2024 Tax Form - Lot 41
10/30/2024 Plot Plan APPROVED PLOT PLAN
10/30/2024 Approved Plans APPROVED PLANS
10/30/2024 Permit Codes Residential Plan Review
11/04/2024 Permit DS Building Permit
11/04/2024 Receipt Receipt for transaction: 2024-008743
11/25/2024 3RD Party Insp Report 1401-03 SW Winthrop Ter_PIER INSP_2024-11-22
11/26/2024 Letter INSPECTION SUMMARY
12/05/2024 1401-03 Winthrop Ter_FTG INSP_2024-12-02
12/06/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
02/25/2025 2025_02_10_1401-03 SW Winthrop Terrace_Gslab_Report_Sealed
02/26/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter INSPECTION SUMMARY
05/21/2025 Engineer Report/Study ENGINEERING LETTER
05/22/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
06/24/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter Stop Work Order
07/21/2025 Letter Stop Work Order
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter Stop Work Order
07/31/2025 Letter Stop Work Order
08/04/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter Codes Final Certificate of Occupancy
08/05/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home