Summary
PRRES20244348
Building Permit - Residential
Certificate of Occupancy
WALKER CUSTOM HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINIHSED BASEMENT - COVERED DECK STOP WORK ORDER generated on 09/16/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 09/16/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 11/04/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 11/04/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER generated on 12/12/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 12/13/2024 12:00 AM by username 'Dustin Agcopra'.
08/19/2024
08/20/2024
05/07/2025
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
WALKERCUSTOMHOMESKC@GMAIL.COM  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
WALKER CUSTOM HOMES LLC, Address:PO BOX 247  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/20/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/20/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/20/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/20/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/20/2024
9110078-Valuation Fee New Single Family $1,736.05 $1,736.05 Paid 08/20/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Failed 9/16/2024 09/16/2024
Misc
Corrective Action Required
09/16/2024
Clean out required every 100’ Okay to cover where not installing clean out.
Sewer Service Inspection - R Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Resolved
09/16/2024
Clean out required every 100’ Okay to cover where not installing clean out.
Footing Inspection - Residential Failed - Stop Work 9/16/2024 9/16/2024 09/16/2024
Misc
Corrective Action Required
09/16/2024
Footing poured without inspection
Footing Inspection - Residential Passed 9/16/2024 9/16/2024 09/16/2024
Misc
Resolved
09/16/2024
Footing poured without inspection
Underslab Plumbing Inspection - Residential Passed 9/17/2024 9/17/2024 09/17/2024
Water Service Inspection - R Passed 9/17/2024 9/17/2024 09/17/2024
Erosion Control Inspection Residential Failed 10/14/2024 10/14/2024 10/14/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down
Erosion Control Inspection Residential Partial 10/17/2024 10/17/2024 10/17/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
Erosion Control Inspection Residential Failed 10/30/2024 10/30/2024 10/30/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/17/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/30/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 11/4/2024 11/4/2024 11/04/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/30/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/30/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-4-24 Dustin A, silt fence is still down,
Erosion Control Inspection Residential Partial 11/4/2024 11/4/2024 11/04/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/04/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/04/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-4-24 Dustin A, silt fence is still down, 11-4-24 Dustin A, Silt fence repaired
All Rough Inspection - Residential Failed 12/3/2024 12/3/2024 12/03/2024
Misc
Corrective Action Required
12/03/2024
-plans call for 7 studs under beam in garage -seal top plate penetration rear garage wall -address overnotched lvl hip at bearing point above bed 2 -address multiple top plates in bed 2 -address top plates not tied together at exterior wall corner bed 2 -seal bottom plate penetration in pantry/entry -address top plate penetration at prep kitchen -seal top plate penetration at dining/deck -secure gas line and install at fire place -seal wall space to ceiling space at entry (missing in 1 stud bay) -seal top plate penetration master walk in closet -seal penetrations in vertical to horizontal fire blocking in basement -place call for (3) 2x12 above windows rear basement wall rec room -plans call for (3) 2x12 lvl above basement slider -connect ufer ground to middle grounded bus bar -all “B” columns to be 3 1/2” to plans
Electrical Service Inspection Failed 12/3/2024 12/3/2024 12/03/2024
Misc
Corrective Action Required
12/03/2024
Connect ufer ground to middle grounded bus bar
Gas Service Inspection - Residential Failed 12/3/2024 12/3/2024 12/03/2024
Misc
Corrective Action Required
12/03/2024
Complete fireplace install
Erosion Control Inspection Residential Failed 12/9/2024 12/9/2024 12/09/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/04/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/04/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-4-24 Dustin A, silt fence is still down, 11-4-24 Dustin A, Silt fence repaired
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/09/2024
12-9-24 Dustin A, Silt fence is down in spots. Needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 12/12/2024 12/12/2024 12/12/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/09/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/09/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-4-24 Dustin A, silt fence is still down, 11-4-24 Dustin A, Silt fence repaired
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/09/2024
12-9-24 Dustin A, Silt fence is down in spots. Needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 12-12-24 Dustin A, Silt fence is down in front of site. Fail.
Erosion Control Inspection Residential Failed 12/13/2024 12/13/2024 12/13/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
12/13/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, corrected
DCM3 ESC REQUIRED 2 DAY
Resolved
12/13/2024
10-30-24 Dustin A, silt fence down. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-4-24 Dustin A, silt fence is still down, 11-4-24 Dustin A, Silt fence repaired
DCM3 ESC REQUIRED 2 DAY
Resolved
12/13/2024
12-9-24 Dustin A, Silt fence is down in spots. Needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 12-12-24 Dustin A, Silt fence is down in front of site. Fail.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/13/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. REPAIR DOWN SILT FENCE AT SW CORNER
Erosion Control Inspection Residential Partial 12/13/2024 12/13/2024 12/13/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/13/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. REPAIR DOWN SILT FENCE AT SW CORNER 12-13-24 Dustin A, Silt fence has been corrected. Will need to maintain erosion control until sod is down.
Gas Service Inspection - Residential Passed 12/17/2024 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
Complete fireplace install
All Rough Inspection - Residential Passed 12/17/2024 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
-plans call for 7 studs under beam in garage -seal top plate penetration rear garage wall -address overnotched lvl hip at bearing point above bed 2 -address multiple top plates in bed 2 -address top plates not tied together at exterior wall corner bed 2 -seal bottom plate penetration in pantry/entry -address top plate penetration at prep kitchen -seal top plate penetration at dining/deck -secure gas line and install at fire place -seal wall space to ceiling space at entry (missing in 1 stud bay) -seal top plate penetration master walk in closet -seal penetrations in vertical to horizontal fire blocking in basement -place call for (3) 2x12 above windows rear basement wall rec room -plans call for (3) 2x12 lvl above basement slider -connect ufer ground to middle grounded bus bar -all “B” columns to be 3 1/2” to plans
Electrical Service Inspection Passed 12/17/2024 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
Connect ufer ground to middle grounded bus bar
Driveway Inspection Partial 3/20/2025 3/20/2025 03/20/2025
Miscellaneous Correction
Informational
03/20/2025
03-20-25 Jamie S, DW gravel is compacted. Approved to pour.
Driveway Inspection Passed 3/27/2025 3/27/2025 03/27/2025
Miscellaneous Correction
Informational
03/20/2025
03-20-25 Jamie S, DW gravel is compacted. Approved to pour. 3-27-25 Dustin A, Dw is poured to city specs. Pass
Sidewalk Inspection Failed 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/20/2025
03-20-25 Jamie S, SW gravel is compacted, and slopes are within city standards. I did make them move a porta-john off of a storm box before inspection. Approved to pour.
Plot Plan Inspection Failed 4/15/2025 04/15/2025
Misc
Corrective Action Required
04/15/2025
Uncover covered manhole
Erosion Control Inspection Residential Partial 4/29/2025 04/29/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/13/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. REPAIR DOWN SILT FENCE AT SW CORNER 12-13-24 Dustin A, Silt fence has been corrected. Will need to maintain erosion control until sod is down.
Plot Plan Inspection Failed 4/29/2025 04/29/2025
Misc
Corrective Action Required
04/15/2025
Uncover covered manhole
Misc
Corrective Action Required
04/29/2025
uncover manhole for water
Occupancy Inspection - Codes Residential Failed 4/29/2025 4/29/2025 04/29/2025
Misc
Corrective Action Required
04/29/2025
2317 SW Morris • Door to garage must self close and latch Deck rail • Remove dust covers from smoke detectors • Fill gaps above garage doors Door, where boards meet the ceiling • Water spigot on main line in basement must be equipped with backflow prevention type spigot • Deck posts to beam connections must meet code R507.5.2, 2. 1/2” thru-bolts per post or post cap or other approved bracket • Driveway and sidewalk inspections must be completed
Sidewalk Inspection Passed 3/20/2025 3/20/2025 05/05/2025
Misc
Informational
03/20/2025
03-20-25 Jamie S, SW gravel is compacted, and slopes are within city standards. I did make them move a porta-john off of a storm box before inspection. Approved to pour. 3-27-25 Dustin A, SW is poured, Section of sidewalk that attaches to existing ada ramp does not have an expansion joint. Fail 5-5-25 Dustin A, sw has been corrected
Driveway Inspection Passed 05/05/2025
Miscellaneous Correction
Informational
03/27/2025
03-20-25 Jamie S, DW gravel is compacted. Approved to pour. 3-27-25 Dustin A, SW is poured, Section of sidewalk that attaches to existing ada ramp does not have an expansion joint. Fail
Sidewalk Inspection Passed 5/5/2025 5/5/2025 05/05/2025
Misc
Informational
03/27/2025
03-20-25 Jamie S, SW gravel is compacted, and slopes are within city standards. I did make them move a porta-john off of a storm box before inspection. Approved to pour.
Plot Plan Inspection Passed 5/7/2025 05/07/2025
Misc
Resolved
05/07/2025
Misc
Resolved
05/07/2025
Occupancy Inspection - Codes Residential Full C of O 5/7/2025 5/7/2025 05/07/2025
Misc
Resolved
05/07/2025
Documents & Images
Date Uploaded File Type Document Name
08/19/2024 Application Form APPLICATION
08/19/2024 Approved Plans APPROVED PLANS
08/19/2024 Plot Plan APPROVED PLOT PLAN
08/20/2024 Permit Codes Residential Plan Review
08/20/2024 Permit DS Building Permit
08/20/2024 Receipt Receipt for transaction:2024-007057
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter Stop Work Order
09/16/2024 Letter Stop Work Order
09/16/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
09/16/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter Stop Work Order
11/04/2024 Letter Stop Work Order
11/04/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/04/2024 Engineer Report/Study Schedule 40 column letter
12/05/2024 2024_11_25_SWF_Dpiers_KCC_R_Sealed
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter Stop Work Order
12/12/2024 Letter Stop Work Order
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 2317 SW Morris Drive - Structural Letter (December 12, 2024)
12/13/2024 Schedule 40 column letter
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
04/11/2025 LOT 92 ASBUILT
04/14/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/15/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter Codes Final Certificate of Occupancy
05/07/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home