Permit Application Status

PRRES20244225


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20244225
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED DECK. ENGINEERED FLOOR SYSTEM.
08/12/2024
08/19/2024
02/11/2025
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
JORDAN@JFECONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/19/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/19/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/19/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/19/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 08/19/2024
9110078-Valuation Fee New Single Family $1,650.79 $1,650.79 Paid 08/19/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Occupancy Inspection - Codes Residential Pending
Plot Plan Inspection Pending
Misc
Corrective Action Required
03/25/2025
House is not completely final graded
Sidewalk Inspection Pending
Misc
Informational
03/28/2025
2-6-25 Dustin A, SW is formed and compacted. Slopes are in compliance. White cure needs to be applied to Sidewalk. Approved to pour. There is a section on west side that is not formed. Pouring at a later day 2-13-25 Jamie S, SW slope is in compliance with city standards. The section on the west side as mentioned in the previous note is still missing due so I am only giving a partial until completed. 2/21/25 Dustin A, sw has been formed and compacted. Approved to pour 3-28-25 Dustin A, Sw has been poured and meets city specs. Cannot pass until forms are pulled
Footing Inspection - Residential Passed 9/18/2024 9/18/2024 09/18/2024
Underslab Plumbing Inspection - Residential Passed 9/18/2024 9/18/2024 09/18/2024
Water Service Inspection - R Partial 9/24/2024 9/24/2024 09/24/2024
Misc
Informational
09/24/2024
Per ran from foundation
Sewer Service Inspection - R Passed 9/24/2024 9/24/2024 09/24/2024
Water Service Inspection - R Passed 9/25/2024 9/25/2024 09/25/2024
Misc
Informational
09/24/2024
Per ran from foundation
All Rough Inspection - Residential Partial 10/11/2024 10/11/2024 10/11/2024
Misc
Informational
10/11/2024
Garage portal frame and CSPF inspection only Okay to cover
Electrical Service Inspection Passed 1/9/2025 1/9/2025 01/09/2025
Gas Service Inspection - Residential Passed 1/9/2025 1/9/2025 01/09/2025
All Rough Inspection - Residential Failed 1/9/2025 1/9/2025 01/09/2025
Misc
Resolved
01/09/2025
Garage portal frame and CSPF inspection only Okay to cover
Misc
Corrective Action Required
01/09/2025
-address valley rafter at dining room/living room rear corner (no bearing) -fireblock furr outs/downs at wet bar -seal penetrations in return air joist space -anchor bolts to be in the middle 1/4 of sill plate and -fire block basement bath dead space, and walls I-joists to still be inspected (Provide I joist plans on site for inspection. )
All Rough Inspection - Residential Passed 1/16/2025 1/16/2025 01/16/2025
Misc
Resolved
01/16/2025
-address valley rafter at dining room/living room rear corner (no bearing) -fireblock furr outs/downs at wet bar -seal penetrations in return air joist space -anchor bolts to be in the middle 1/4 of sill plate and -fire block basement bath dead space, and walls I-joists to still be inspected (Provide I joist plans on site for inspection. )
Sidewalk Inspection Partial 2/7/2025 2/7/2025 02/07/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, SW is formed and compacted. Slopes are in compliance. White cure needs to be applied to Sidewalk. Approved to pour. There is a section on west side that is not formed. Pouring at a later day
Driveway Inspection Partial 2/7/2025 2/7/2025 02/07/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, DW formed and compacted. Slopes are in compliance . Approved to pour
Driveway Inspection Passed 2/14/2025 2/14/2025 02/13/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, DW formed and compacted. Slopes are in compliance . Approved to pour 2-13-25 Jamie S, DW slope is in compliance with city standards.
Sidewalk Inspection Partial 2/14/2025 2/14/2025 02/13/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, SW is formed and compacted. Slopes are in compliance. White cure needs to be applied to Sidewalk. Approved to pour. There is a section on west side that is not formed. Pouring at a later day 2-13-25 Jamie S, SW slope is in compliance with city standards. The section on the west side as mentioned in the previous note is still missing due so I am only giving a partial until completed.
Driveway Inspection Passed 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
03/21/2025
3/21/25 Dustin A, dw is formed and compacted . Approved to pour
Sidewalk Inspection Partial 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
02/13/2025
2-6-25 Dustin A, SW is formed and compacted. Slopes are in compliance. White cure needs to be applied to Sidewalk. Approved to pour. There is a section on west side that is not formed. Pouring at a later day 2-13-25 Jamie S, SW slope is in compliance with city standards. The section on the west side as mentioned in the previous note is still missing due so I am only giving a partial until completed. 2/21/25 Dustin A, sw has been formed and compacted. Approved to pour
Plot Plan Inspection Failed 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
House is not completely final graded
Sidewalk Inspection Partial 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
03/21/2025
2-6-25 Dustin A, SW is formed and compacted. Slopes are in compliance. White cure needs to be applied to Sidewalk. Approved to pour. There is a section on west side that is not formed. Pouring at a later day 2-13-25 Jamie S, SW slope is in compliance with city standards. The section on the west side as mentioned in the previous note is still missing due so I am only giving a partial until completed. 2/21/25 Dustin A, sw has been formed and compacted. Approved to pour 3-28-25 Dustin A, Sw has been poured and meets city specs. Cannot pass until forms are pulled
Documents & Images
Date Uploaded File Type Document Name
08/12/2024 HF102 - Permit App
08/12/2024 HF102 - Tax App
08/15/2024 Approved Plans APPROVED PLANS
08/15/2024 Approved Plans APPROVED JOIST DRAWING
08/15/2024 Permit Codes Residential Plan Review
08/19/2024 Plot Plan APPROVED PLOT PLAN
08/19/2024 Permit Codes Residential Plan Review
08/19/2024 Permit DS Building Permit
08/19/2024 Receipt Receipt for transaction:2024-006980
09/18/2024 2115 SW HOOK FARM DR FTG INSP
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/24/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/01/2024 3RD Party Insp Report THIRD PARTY SLAB INSPECTION
10/11/2024 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
03/25/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents