Permit Application Status

PRRES20243955


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243955
Building Permit - Residential
Issued
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. COVERED DECK. STOP WORK ORDER generated on 10/17/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 10/18/2024 12:00 AM by username 'Dustin Agcopra'.
07/29/2024
08/12/2024
02/03/2025
Locations
Contacts
BILL KENNEY & ASSOCIATES, Address:P O BOX 291, Phone:(816) 838-0552  
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
Bill Kenney, Address:PO Box 291, Phone:(816) 838-0552  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
BILLKENNEY9@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/12/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/12/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/12/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/12/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/12/2024
9110078-Valuation Fee New Single Family $1,543.98 $1,543.98 Paid 08/12/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/16/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. NO ADDRESS POSTED REMOVE ALL TRASH AND DEBRIS FROM LOT
Underslab Plumbing Inspection - Residential Failed 8/30/2024 8/30/2024 08/30/2024
Misc
Corrective Action Required
08/30/2024
No address posted inspection denied
Underslab Plumbing Inspection - Residential Passed 9/5/2024 9/5/2024 09/05/2024
Misc
Resolved
09/05/2024
No address posted inspection denied
Footing Inspection - Residential Passed 9/11/2024 9/11/2024 09/11/2024
Erosion Control Inspection Residential Failed 10/14/2024 10/14/2024 10/14/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down
Sewer Service Inspection - R Passed 10/15/2024 10/15/2024 10/15/2024
Water Service Inspection - R Passed 10/15/2024 10/15/2024 10/15/2024
Erosion Control Inspection Residential Failed - Stop Work 10/17/2024 10/17/2024 10/17/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, not corrected and there is gravel out in rd
Erosion Control Inspection Residential Partial 10/18/2024 10/18/2024 10/18/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/17/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, not corrected and there is gravel out in rd 10-17-24 Dustin A, Gravel has been swept off of street and emailed Mr. Kenney on keeping ESC up to standards during build. Corrected
All Rough Inspection - Residential Partial 10/25/2024 10/25/2024 10/25/2024
Misc
Informational
10/25/2024
Covered rear patio roof framing inspected only and okay to cover
All Rough Inspection - Residential Failed 12/16/2024 12/16/2024 12/16/2024
Misc
Informational
10/25/2024
Covered rear patio roof framing inspected only and okay to cover
Misc
Corrective Action Required
12/16/2024
Inspection denied -erosion control not in compliance
Gas Service Inspection - Residential Failed 12/16/2024 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/16/2024
Inspection denied -erosion control not in compliance
Electrical Service Inspection Failed 12/16/2024 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/16/2024
Inspection denied -erosion control not in compliance
Erosion Control Inspection Residential Failed 12/16/2024 12/16/2024 12/16/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
12/16/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down 10-17-24 Dustin A, not corrected and there is gravel out in rd 10-17-24 Dustin A, Gravel has been swept off of street and emailed Mr. Kenney on keeping ESC up to standards during build. Corrected
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/16/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. NO ADDRESS POSTED REMOVE ALL TRASH AND DEBRIS FROM LOT
All Rough Inspection - Residential Failed 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
12/16/2024
Covered rear patio roof framing inspected only and okay to cover
Misc
Resolved
12/23/2024
Inspection denied -erosion control not in compliance
Misc
Corrective Action Required
12/23/2024
Inspection denied. Provide city stamped plans on site
Electrical Service Inspection Failed 12/23/2024 12/23/2024 12/23/2024
Misc
Resolved
12/23/2024
Inspection denied -erosion control not in compliance
Misc
Corrective Action Required
12/23/2024
Identify ufer connections at each end
Gas Service Inspection - Residential Failed 12/23/2024 12/23/2024 12/23/2024
Misc
Resolved
12/23/2024
Inspection denied -erosion control not in compliance
Misc
Corrective Action Required
12/23/2024
G2417.4.1 Test Pressure
Corrective Action Required
12/23/2024
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
All Rough Inspection - Residential Failed 12/24/2024 12/24/2024 12/24/2024
Misc
Resolved
12/24/2024
Covered rear patio roof framing inspected only and okay to cover
Misc
Resolved
12/24/2024
Inspection denied. Provide city stamped plans on site
Misc
Corrective Action Required
12/24/2024
-install all doors missing -missing triple lvl above owners entry -furr out for insulation of return air joist space and stud space in garage -fire blocking hvac chase at owners entry into furr down and ceiling space -strap top plate lapped less than 24” above home office window -seal top of dead space at owners entry bath -missing nails in hangers above great room -bolts not tightened at Ibeam -seal penetrations in R/a joist space -address over bored exterior wall stud for dwv at dining room -fireblock front entry into wall into furr down -provide future vent for basement bath -provide full bearing for beam in basement at beam pick center rear garage -fire blocking every basement stairwell walls ever 10’ from floor to ceiling
Electrical Service Inspection Passed 12/24/2024 12/24/2024 12/24/2024
Misc
Resolved
12/24/2024
Identify ufer connections at each end
Gas Service Inspection - Residential Passed 12/27/2024 12/27/2024 12/27/2024
Misc
Resolved
12/27/2024
G2417.4.1 Test Pressure
Resolved
12/27/2024
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
All Rough Inspection - Residential Failed 1/3/2025 1/3/2025 01/03/2025
Misc
Corrective Action Required
12/24/2024
-strap top plate lapped less than 24” above home office window (strap shall extend 6” past plate break) -provide full bearing for beam in basement at beam pick center rear garage(lumber being used in contact with concrete shall be treated and secure) OKAY TO INSULATE
All Rough Inspection - Residential Passed 1/15/2025 1/15/2025 01/15/2025
Misc
Resolved
01/15/2025
Piers/Caissons Inspection - Residential Passed 1/27/2025 1/27/2025 01/27/2025
Driveway Inspection Failed 3/14/2025 3/14/2025 03/14/2025
Misc
Informational
03/14/2025
3-14-25 Dustin A, DW is formed and compacted. Aggregate is not deep enough along curb and there is bare dirt showing. Must have min 3 inch of aggregate. Fail
Driveway Inspection Partial 03/14/2025
Misc
Informational
03/14/2025
3-14-25 Dustin A, DW is formed and compacted. Aggregate is not deep enough along curb and there is bare dirt showing. Must have min 3 inch of aggregate. Fail 3-14-25 Dustin A, DW recalled in. It has been dug out where aggregate is deep enough. Approved to pour
Driveway Inspection Passed 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
03/14/2025
3-14-25 Dustin A, DW is formed and compacted. Aggregate is not deep enough along curb and there is bare dirt showing. Must have min 3 inch of aggregate. Fail 3-14-25 Dustin A, DW recalled in. It has been dug out where aggregate is deep enough. Approved to pour 3-21-25 Dustin A, Dw has been poured to city specs. Pass
Sidewalk Inspection Partial 04/18/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, sw needs a pre pour inspection before pouring. Please call for pre pour before pouring
Documents & Images
Date Uploaded File Type Document Name
07/29/2024 SVF 85 Permit Ap LSMO07292024
08/01/2024 Application Form EXCISE TAX FORM
08/07/2024 Permit Codes Residential Plan Review
08/09/2024 Plot Plan APPROVED PLOT PLAN
08/12/2024 Approved Plans APPROVED PLANS
08/12/2024 Permit Codes Residential Plan Review
08/12/2024 Permit DS Building Permit
08/12/2024 Receipt Receipt for transaction:2024-006804
08/30/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/11/2024 M L Crose 3141 SW Summit View Trl LSMO Footing Inspection Report 8-14-24
09/11/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter Stop Work Order
10/17/2024 Letter Stop Work Order
10/18/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home