Permit Application Status

PRRES20243851


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243851
Building Permit - Residential
Issued
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
07/24/2024
08/02/2024
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
ASHLEY@NEWMARKHOMESKC.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ELECTRICAL INVESTMENTS, Address:8014 REEDER ST, Phone:(816) 210-1597  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/02/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/02/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 08/02/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/02/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/02/2024
9110078-Valuation Fee New Single Family $2,227.05 $2,227.05 Paid 08/02/2024
9110078-Additional Permit Fee $179.12 $179.12 Paid 10/10/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/31/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
01/29/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Re establish control methods at perimeter and maintain gravel filter
Footing Inspection - Residential Passed 9/6/2024 09/06/2024
Erosion Control Inspection Residential Partial 09/06/2024
Misc
Informational
09/06/2024
In compliance at time of inspection
Erosion Control Inspection Residential Partial 09/30/2024
Misc
Informational
09/06/2024
In compliance at time of inspection
Underslab Plumbing Inspection - Residential Failed 9/30/2024 9/30/2024 09/30/2024
Misc
Corrective Action Required
09/30/2024
Not ready -Inspections not ready by 7 am need to be scheduled for the next day
Erosion Control Inspection Residential Failed 10/1/2024 10/01/2024
Misc
Resolved
10/01/2024
In compliance at time of inspection
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE AND CLEAN GRAVEL FROM STREETS
Underslab Plumbing Inspection - Residential Passed 10/1/2024 10/1/2024 10/01/2024
Misc
Resolved
10/01/2024
Not ready -Inspections not ready by 7 am need to be scheduled for the next day
Erosion Control Inspection Residential Failed 10/10/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE
Erosion Control Inspection Residential Failed 10/24/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/10/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/24/2024
10/24/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 11/1/2024 11/1/2024 11/01/2024
Misc
Corrective Action Required
11/01/2024
11/1/24 Portal frame inspection only: -All horizontal joints are to be in middle 24" of portal leg
Erosion Control Inspection Residential Partial 11/1/2024 11/1/2024 11/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
11/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE
DCM3 ESC REQUIRED 2 DAY
Resolved
11/01/2024
10/24/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Not Ready 11/4/2024 11/4/2024 11/04/2024
Misc
Resolved
11/04/2024
11/1/24 Portal frame inspection only: -All horizontal joints are to be in middle 24" of portal leg
Miscellaneous Correction
Corrective Action Required
11/04/2024
- All horizontal joints are to be in middle 24" of portal leg - Horizontal joints can not be at the header to portal leg Not ready for inspection This is a Garage PFH sheeting inspection only
All Rough Inspection - Residential Failed 11/7/2024 11/7/2024 11/07/2024
Miscellaneous Correction
Resolved
11/07/2024
- All horizontal joints are to be in middle 24" of portal leg - Horizontal joints can not be at the header to portal leg Not ready for inspection This is a Garage PFH sheeting inspection only
Miscellaneous Correction
Corrective Action Required
11/07/2024
Garage PFH, front and back porch above ceiling and CS-PF around the breakfast nook all passed and are ok to cover This is a partial pass only
Erosion Control Inspection Residential Partial 12/03/2024
Sewer Service Inspection - R Passed 12/10/2024
Water Service Inspection - R Passed 12/11/2024 12/11/2024 12/11/2024
Electrical Service Inspection Passed 1/24/2025 1/24/2025 01/24/2025
Gas Service Inspection - Residential Passed 1/24/2025 1/24/2025 01/24/2025
Erosion Control Inspection Residential Partial 1/24/2025 1/24/2025 01/24/2025
All Rough Inspection - Residential Failed 1/24/2025 1/24/2025 01/24/2025
Miscellaneous Correction
Corrective Action Required
11/07/2024
-Provide anchor bolts at plate breaks in garage -Anchor bolts to be in middle third of plate at garage -Install tension straps at PFH header to jack studs per detail -Solid block joists above all beams and load bearing walls throughout -Hip joist over notched at 2 car bay exterior corner -Strap top plates lapped less than 24" at 1 car bay -Seal joist space return air penetrations at owners entry -Missing (2) 2x4 at owners entry -Missing LIB throughout -Missing (2) 2x4 at utility closet window -Missing (2) 2x6 at utility closet corner -Install all missing roof boots -Missing (2) 2x4 at deck doorway -Properly support hip above deck -Seal bottom plate at bed 2 -Provide receptacle at entry -Nail all exterior corners max min 12" oc -Add stud under beam in bed 2 -Protect electrical at master bed return air space -Missing EC 2 800 lb hold down device at bed 4 -Missing (2) 2x4 at bed 4 windows -Missing (2) 2x4 bed 4 closet -Provide lateral restraint at all joists above load bearing walls -Strap at over bored top plate shared bath must extend min 6" each side of bored hole -Missing double 2x4s throughout bed 5 and shared bath -Support vent above laundry -Protect dryer duct 2” below plate line at laundry -Fireblock top of duct chase -Provide lateral restraint at beam above living room window -FB dead space at stairs -Missing EC 2 800lb hold down device at basement corner -Missing (2) 2x4 at mechanical -Missing double studs at exterior basement window wall -Solid block joists above beams in basement -Install blocking between joists 48" oc under island -FB top of dead space at basement bath -Tighten anchor bolts in basement
Erosion Control Inspection Residential Failed 01/29/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
01/29/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Re establish control methods at perimeter and maintain gravel filter
All Rough Inspection - Residential Failed 1/29/2025 1/29/2025 01/29/2025
Miscellaneous Correction
Corrective Action Required
01/24/2025
-Missing (2) 2x4 at owners entry -LIB IN PANTRY TO BE 5’ 9”, -LIB IN UTILITY TO BE 5’ 2” -Missing (2) 2x4 at utility closet window -Missing (2) 2x6 at utility closet corner -Missing (2) 2x4 at deck doorway -Protect electrical at master bed return air space-PAN OFF BOX -Missing (2) 2x4 at bed 4 windows -Missing (2) 2x4 bed 4 closet -Missing double 2x4s throughout bed 5 and shared bath
All Rough Inspection - Residential Passed 1/31/2025 1/31/2025 01/31/2025
Miscellaneous Correction
Resolved
01/31/2025
-Missing (2) 2x4 at owners entry -Missing (2) 2x4 at utility closet window -Missing (2) 2x6 at utility closet corner -Missing (2) 2x4 at deck doorway -Missing (2) 2x4 at bed 4 windows -Missing (2) 2x4 bed 4 closet -Missing double 2x4s throughout bed 5 and shared bath
Driveway Inspection Partial 3/3/2025 3/3/2025 03/03/2025
Misc
Informational
03/03/2025
03/03/25 Monday Pre-inspection of forms and materials for driveway passed inspection.
Sidewalk Inspection Partial 3/3/2025 3/3/2025 03/03/2025
Misc
Informational
03/03/2025
03/03/25 Monday JMJ Pre-inspection of sidewalk forms and materials passed inspection.
Driveway Inspection Passed 3/7/2025 3/7/2025 03/07/2025
Misc
Informational
03/03/2025
03/03/25 Monday Pre-inspection of forms and materials for driveway passed inspection.
Misc
Informational
03/07/2025
Driveway passed final inspection.
Sidewalk Inspection Passed 3/7/2025 3/7/2025 03/07/2025
Misc
Informational
03/03/2025
03/03/25 Monday JMJ Pre-inspection of sidewalk forms and materials passed inspection.
Misc
Informational
03/07/2025
03/07/25 Friday JMJ Sidewalk passed final inspection.
Documents & Images
Date Uploaded File Type Document Name
07/25/2024 Approved Plans APPROVED PLANS
07/25/2024 Plot Plan APPROVED PLOT PLAN
08/02/2024 Updated - WR131 - Lee's Summit Permit Application Packet
08/02/2024 Permit Codes Residential Plan Review
08/02/2024 Permit DS Building Permit
08/02/2024 Receipt Receipt for transaction:2024-006507
09/05/2024 2139 NW Killarney Ln_PIER INSP_2024-09-03
09/06/2024 Letter INSPECTION SUMMARY
09/06/2024 Letter INSPECTION SUMMARY
09/09/2024 WR131 - Lee's Summit Basement Finish Application -Scope_of_Work_Statement_Fillable (1)
09/11/2024 Coverletter
09/11/2024 24-342 BASEMENT FINISH2
09/12/2024 Approved Plans APPROVED BASEMENT FINISH
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 INSPECTION SUMMARY
10/10/2024 Receipt Receipt for transaction:2024-008252
10/24/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
01/31/2025 2025_01_30_Lot 131 Woodside Ridge_Apex_Plan Review Comments_Response
01/31/2025 Receipt Receipt for transaction:2025-000635
01/31/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/28/2025 2139 NW Killarney Lane_Framing Evaluation Report_3-28-25
03/31/2025 2139 NW Killarney Lane_Framing Evaluation Report_3-28-25
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home