Permit Application Status

PRRES20243548


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243548
Building Permit - Residential
Certificate of Occupancy
TRUMARK HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED porch
07/11/2024
07/29/2024
01/18/2025
03/31/2025
Locations
Contacts
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
TRUMARK HOMES LLC, Address:2924 NW THOREAU DR  
MARK A YANCIK, Address:508 nw manor dr  
TRUMARKHOMES.MARK@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 07/29/2024
Right of Way Permit Fee $85.00 $85.00 Paid 07/29/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 07/29/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 07/29/2024
Water Meter Fee $748.03 $748.03 Paid 07/29/2024
Valuation Fee New Single Family $1,856.10 $1,856.10 Paid 07/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/31/2024 07/31/2024
Informational
07/31/2024
Footing approved by engineer
Underslab Plumbing Inspection - Residential Passed 8/22/2024 08/22/2024
Erosion Control Inspection Residential Partial 8/22/2024 08/22/2024
Misc
Informational
08/22/2024
Erosion control is in compliance. Maintain EC throughout construction
Sewer Service Inspection - R Passed 10/8/2024 10/08/2024
Erosion Control Inspection Residential Failed 10/8/2024 10/08/2024
Misc
Corrective Action Required
10/08/2024
Restore erosion control after sewer and water service completion
Erosion Control Inspection Residential Failed 10/10/2024 10/10/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/08/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Water Service Inspection - R Passed 10/10/2024 10/10/2024
Erosion Control Inspection Residential Partial 10/29/2024 10/29/2024 10/29/2024
DCM2 ESC DEFICIENT INSTALLATION
Informational
10/29/2024
Erosion control in compliance at time of inspection
Electrical Service Inspection Passed 10/29/2024 10/29/2024
Gas Service Inspection - Residential Passed 10/29/2024 10/29/2024
Piers/Caissons Inspection - Residential Passed 10/29/2024 10/29/2024
All Rough Inspection - Residential Failed 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/29/2024
-Support hip rafters above garage -Protect garage I beam; provide column support -Solid block ends of joists above bearing wall -Fb duct chase from joist space -Nail stud shoe at kitchen wall -Install hangers to double joist above fireplace -Provide double 9.25” lvl beam at opening between foyer and living room -Provide solid blocking underneath all lvl point load to I beam in basement -Brace ends of lvl roof beam from rotation -Nail wall studs at intersections -Provide 3 face nails at ceiling joist-rafter connections -Protect dryer duct at top plate with BOCA plate -Support hip rafters above master closet -Engineer to address notched (2)2x12 beam above master closet; rafter bearing on top of ceiling joists instead of plate -Support long hip rafter above master bathroom at mid span -Brace ceiling joists above master bathroom -Nail window king studs to headers -Move hip rafter load from non-bearing wall (bedroom 3) to bearing wall/beam -Provide purlin support every 4 ft -Fasten together the 3x and 4x beam at stair -The (3)2x10 beam at stair is notched. Have engineer address this -Install joist hangers at connections to (3)2x10 beam above -The (3)2x10 beam above must be connected to the (4)2x10 beam with hanger; support the 4x joist at I beam -Engineer address support of cantilevered (2)2x10 above basement window -Nail together the 2x joists per code. Nail together all multiple plies joists -Solid block ends of joists above basement I beam -Toe nail joists to sill plates **DO NOT INSULATE
Erosion Control Inspection Residential Failed 11/1/2024 11/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/01/2024
Restore erosion control along street and clean mud off the street. No further inspection if erosion control is not in compliance
Erosion Control Inspection Residential Failed 11/6/2024 11/06/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/01/2024
Restore erosion control along street at south side of lot entrance
All Rough Inspection - Residential Failed 11/6/2024 11/6/2024 11/06/2024
Misc
Corrective Action Required
10/29/2024
-Fb duct chase from joist space -Engineer to address notched (2)2x12 beam above master closet -Nail window king studs to headers ** near master bedroom corner; at kitchen sink -The (3)2x10 beam at stair is notched. Have engineer address this **There’s no footing under the wall. Your engineer must address this **OK TO INSULATE
All Rough Inspection - Residential Failed 11/12/2024 11/12/2024 11/12/2024
Misc
Corrective Action Required
11/06/2024
-Fb duct chase from joist space **The electrical wiring must be protected. Use insulation to fire block -The (3)2x10 beam at stair is notched. Have engineer address this **There’s no footing under the wall. Your engineer must address this
All Rough Inspection - Residential Passed 11/13/2024
Misc
Resolved
11/13/2024
-The (3)2x10 beam at stair is notched. Have engineer address this **There’s no footing under the wall. Your engineer must address this
Driveway Inspection Partial 1/29/2025 1/29/2025 01/29/2025
Misc
Informational
01/29/2025
1-29-25 NS site visited and it appears that driveway meets city standards for pre-pour
Driveway Inspection Partial 1/30/2025 1/30/2025 01/30/2025
Misc
Informational
01/29/2025
1-29-25 NS site visited and it appears that driveway meets city standards for pre-pour 1-30-25 NS site visited, crews have poured driveway and I talked to the Forman and they are closing on the house on Friday and asked if I could pass it as long as they get the forms removed on Monday 1-3-25
Erosion Control Inspection Residential Failed 3/27/2025 03/27/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/06/2024
Restore erosion control along street. Wattle shall be staked down into soil. No further inspection if erosion control is not in compliance
Occupancy Inspection - Codes Residential Failed 3/27/2025 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/27/2025
**CORRECT EROSION CONTROL AND CLEAN UP THE STREET -Driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Provide guardrail at open side of stoop more than 30” above grade, as measured from 36” out from edge down to grade -Fasten ladder to window well -Seal exterior wall gas pipe penetration, seal exterior lights -Provide handrail for garage stair -Complete electrical to water heater
Driveway Inspection Passed 3/27/2025 3/27/2025 03/28/2025
Misc
Informational
01/30/2025
1-29-25 NS site visited and it appears that driveway meets city standards for pre-pour 1-30-25 NS site visited, crews have poured driveway and I talked to the Forman and they are closing on the house on Friday and asked if I could pass it as long as they get the forms removed on Monday 1-3-25 3-27-25 NS Driveway passed no sidewalk
Erosion Control Inspection Residential Passed 03/31/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
03/31/2025
Restore erosion control along street. Wattle shall be staked down into soil. No further inspection if erosion control is not in compliance
Plot Plan Inspection Passed 03/31/2025
Occupancy Inspection - Codes Residential Full C of O 3/31/2025 03/31/2025
Misc
Resolved
03/31/2025
**CORRECT EROSION CONTROL AND CLEAN UP THE STREET -Driveway not approved on record -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Provide guardrail at open side of stoop more than 30” above grade, as measured from 36” out from edge down to grade -Fasten ladder to window well -Seal exterior wall gas pipe penetration, seal exterior lights -Provide handrail for garage stair -Complete electrical to water heater
Documents & Images
Date Uploaded File Type Document Name
07/11/2024 MONTICELLO LOT 71 PERMIT APPLICATION
07/15/2024 Permit Codes Residential Plan Review
07/16/2024 Permit Codes Residential Plan Review
07/22/2024 Approved Plans APPROVED PLANS
07/22/2024 Permit Codes Residential Plan Review
07/22/2024 Plot Plan APPROVED PLOT PLAN
07/22/2024 Permit Codes Residential Plan Review
07/29/2024 Permit DS Building Permit
07/29/2024 Receipt Receipt for transaction:2024-006296
07/31/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/06/2024 Yancik 1233 NE Goshen Dr LSMO Support for Cantilevered 2x10's avove bsement window Report 11-4-24
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Photograph email with pictures
11/12/2024 Letter INSPECTION SUMMARY
11/13/2024 Engineer Report/Study 71 Monticello - Overnotched joist field issue
11/13/2024 Permit insulation for fire blocking
11/13/2024 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 71 Monticello As Graded Plot plan
03/28/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter Codes Final Certificate of Occupancy
03/31/2025 Letter Field Certificate of Occupancy
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home