PRRES20242858
Building Permit - Residential
Issued
NEW DUPLEX
NEW DUPLEX. FINISHED/UNFINISHED BASEMENT. SUSPENDED SLAB. COVERED PATIO. STOP WORK ORDER generated on 09/19/2024 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 10/08/2024 12:00 AM by username 'Kyle Beard'.
06/04/2024
07/11/2024
12/08/2024
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
KEVIN@ROCKCREEKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Duplex $2,586.73 $2,586.73 Paid 07/11/2024
8331401-Water Tap Fee $7,946.00 $7,946.00 Paid 07/11/2024
8350015-Water Meter Fee $1,496.06 $1,496.06 Paid 07/11/2024
8331507-Sanitary Sewer Development Fee $4,570.00 $4,570.00 Paid 07/11/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/11/2024
7232302-Residential License Tax Fee $1,240.32 $1,240.32 Paid 07/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Foundation Inspection - Commercial Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/13/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - REMOVE GRAVEL AND DEBRIS FROM STREET - REMOVE TRASH, ANY MATERIAL PRONE TO BLOW OFF LOT.
Sidewalk Inspection Pending
Misc
Informational
05/06/2025
5-6-25 RH. Sidewalk need poured on both side of Driveway. One side formed up other side is not graded yet.
Erosion Control Inspection Residential Failed - Stop Work 9/19/2024 09/19/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/19/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - POST ADDRESS - PROVIDE GRAVEL FILTER - PROVIDE SILT FENCE - PROTECT SPOILS PILE - REMOVE TRASH AND DEBRIS FROM LOT
Underslab Electrical Inspection - Residential Passed 10/8/2024 10/8/2024 10/08/2024
Erosion Control Inspection Residential Partial 10/8/2024 10/8/2024 10/08/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/19/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - POST ADDRESS - PROVIDE GRAVEL FILTER - PROVIDE SILT FENCE - PROTECT SPOILS PILE - REMOVE TRASH AND DEBRIS FROM LOT
Miscellaneous Correction
Corrective Action Required
10/08/2024
Full erosion control measures are in place and must be properly maintained until CofO
Footing Inspection - Residential Passed 10/15/2024 10/15/2024
Misc
Informational
10/15/2024
INSPECTION BY THIRD PARTY
Underslab Plumbing Inspection - Residential Passed 10/15/2024 10/15/2024 10/15/2024
Sewer Service Inspection - R Passed 10/22/2024 10/22/2024
Water Service Inspection - R Passed 10/23/2024 10/23/2024 10/23/2024
Suspended Slab Inspection Passed 10/24/2024 10/24/2024
Miscellaneous Correction
Informational
10/24/2024
Garage suspended slab passed by a third party
Gas Service Inspection - Residential Passed 1/16/2025 1/16/2025 01/16/2025
Rated Assembly Inspection Partial 1/16/2025 1/16/2025 01/16/2025
MISC
Informational
01/16/2025
Attic fire separation wall and basement floor joist-OK **Make sure to firecaulk wall membrane penetration at ridge
All Rough Inspection - Residential Failed 1/16/2025 1/16/2025 01/16/2025
Misc
Corrective Action Required
01/16/2025
1426: -Garage wall anchors must be located within middle 1/3 of sill plates -Install BOCA plate at refrigerator water line -Provide (4)2x4 stud support for 16” lvl beam at kitchen wall -The 9.25” lvl beam below is not aligned with the 16” lvl roof beam -Support hip lvl to exterior dining wall -Protect fireplace csst gas line at wall sole plate for min 5” with proper strike plate per Wardflex instructions -Complete air supply duct to front bathroom -Seal penetrations of basement ceiling return air space -Protect water lines at basement bedroom/bathroom wall top plates with BOCA plates; protect DVW pipe at bathroom bottom wall plate with BOCA plate -Split joist at bedroom 3 near foundation wall -Isolate the equipment grounding conductors from neutral conductors at sub-panel; bond panel enclosure 824: -Garage wall anchors must be located within middle 1/3 of sill plates -Install BOCA plate at refrigerator water line -Provide (4)2x4 stud support for 16” lvl beam at kitchen wall -The 9.25” lvl beam below is not aligned with the 16” lvl roof beam -Support hip lvl to exterior dining wall -Protect fireplace csst gas line at wall sole plate for min 5” with proper strike plate per Wardflex instructions. Do not secure csst gas line within 3” of nailing surface -Protect water lines at basement bedroom/bathroom wall top plates with BOCA plates -Secure csst gas line min 3” above joist bottom (bedroom 4) -Support duct above bedroom 4 WIC and Game room -Bond gas piping **OK TO INSULATE FOR BOTH UNITS
Electrical Service Inspection Passed 1/16/2025 1/16/2025 01/16/2025
Erosion Control Inspection Residential Partial 2/24/2025 02/24/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/24/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - POST ADDRESS - PROVIDE GRAVEL FILTER - PROVIDE SILT FENCE - PROTECT SPOILS PILE - REMOVE TRASH AND DEBRIS FROM LOT
Miscellaneous Correction
Corrective Action Required
10/08/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Failed 2/24/2025 2/24/2025 02/24/2025
Misc
Corrective Action Required
01/16/2025
1426: -The 9.25” lvl beam below is not aligned with the 16” lvl roof beam -Protect fireplace csst gas line at wall sole plate for min 5” with proper strike plate per Wardflex instructions **Need the close the gap between the nail plates -Move the parallel NM cable out of the return air space above basement rec rm and seal return air space -Protect DVW pipe at bathroom bottom wall plate with BOCA plate -Split joist at bedroom 3 near foundation wall **Secure NM cable per code -Bond panel enclosure to the EGC bus bar. Install the missing bonding screw 824-OK TO ROCK
All Rough Inspection - Residential Passed 2/26/2025 2/26/2025 02/26/2025
Misc
Resolved
02/26/2025
Rated Assembly Inspection Partial 3/10/2025 3/10/2025 03/10/2025
MISC
Informational
01/16/2025
-Attic fire separation wall and basement floor joist-OK -separation walls okay to cover - firecaulk wall membrane penetration at ridge
Rated Assembly Inspection Passed 3/11/2025 3/11/2025 03/11/2025
MISC
Informational
03/10/2025
-Attic fire separation wall and basement floor joist-OK -separation walls okay to cover
Erosion Control Inspection Residential Failed 3/13/2025 03/13/2025
Miscellaneous Correction
Resolved
03/13/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/13/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - REMOVE GRAVEL AND DEBRIS FROM STREET - REMOVE TRASH, ANY MATERIAL PRONE TO BLOW OFF LOT.
Driveway Inspection Partial 4/29/2025 4/29/2025 04/29/2025
Misc
Informational
04/29/2025
4/29/25 RH. Driveway is formed up and approved to pour, contractor was told to replace straw waddles and clean up street.
Sidewalk Inspection Partial 04/29/2025
Misc
Informational
04/29/2025
4/29/25 RH. North Sidewalk is formed up and approved to pour, contractor was told to replace straw waddles and clean up street.
Driveway Inspection Passed 5/6/2025 5/6/2025 05/06/2025
Misc
Informational
04/29/2025
4/29/25 RH. Driveway is formed up and approved to pour, contractor was told to replace straw waddles and clean up street. 5-6-25 RH. Driveway Passed.
Sidewalk Inspection Partial 5/6/2025 5/6/2025 05/06/2025
Misc
Informational
05/06/2025
5-6-25 RH. Sidewalk need poured on both side of Driveway. One side formed up other side is not graded yet.
Documents & Images
Date Uploaded File Type Document Name
06/04/2024 Application - Lot 50
06/04/2024 Tax Form - Lot 50
06/11/2024 Permit Codes Residential Plan Review
06/27/2024 Approved Plans APPROVED PLOT PLAN
06/27/2024 Approved Plans APPROVED PLANS
06/27/2024 Permit Codes Residential Plan Review
07/11/2024 Permit DS Building Permit
07/11/2024 Receipt Receipt for transaction: 2024-005740
09/19/2024 1424-26 SW Winthrop Ter_FTG INSP_2024-09-17
09/19/2024 Letter Stop Work Order
09/26/2024 Approved Plans 9-26-24 APPROVED PLAN
10/08/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/23/2024 2024_10_22_1424-26 SW Winthrop Terrace_Gslab_Report_Sealed
10/23/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/06/2025 Letter INSPECTION SUMMARY
05/06/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home