Permit Application Status

PRRES20242691


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20242691
Building Permit - Residential
Certificate of Occupancy
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. UNCOVERED PATIO. ROOF TRUSSES. STOP WORK ORDER generated on 10/17/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 11/15/2024 12:00 AM by username 'Shawn Hoffman'.
05/28/2024
06/04/2024
11/30/2024
12/27/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TYLER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/04/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/04/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/04/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/04/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/04/2024
9110078-Valuation Fee New Single Family $1,241.44 $1,241.44 Paid 06/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/21/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 11/25/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/25/2024 06/25/2024
Sewer Service Inspection - R Passed 7/16/2024 07/16/2024
Water Service Inspection - R Passed 7/17/2024 7/17/2024 07/17/2024
Underslab Plumbing Inspection - Residential Passed 7/25/2024 7/25/2024 07/25/2024
All Rough Inspection - Residential Not Ready 9/16/2024 9/16/2024 09/16/2024
Misc
Informational
09/16/2024
Home not ready for inspection
All Rough Inspection - Residential Failed 9/23/2024 9/23/2024 09/23/2024
Misc
Resolved
09/23/2024
Home not ready for inspection
Misc
Corrective Action Required
09/23/2024
-missing lib throughout -anchor bolts to be in the middle 1/3 of sill plate -sold block sheathing breaks in garage -address broken sheathing at garage E wall -nail all girder trusses together to plans -nail plate under header to header at PFH -protect all wiring within 6’ of attic access -nail girder trusses together to plans -missing stud packs under girder trusses -provide hold down device per plans at girder trusses -address “extra?” Bath vents in primary bath and bath 2 -fire block hvac chase to ceiling space near bath2 -address front entry top plate not tied to adjoining walls top plates -nail all exterior wall corner studs together to plans and code -smoke/co outside of bed 2 shall comply with 314.3 (Smoke alarms shall be installed not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a bathtub or shower unless this would prevent placement of a smoke alarm required by this section.) -not lateral bracing installed -fire block under primary bathtub at dwv -address holes drilled closer than 2” to one another for pex under primary bath -provide blocking 48”. Oc between floor joists under kitchen island -address electrical drilled through top of floor joist near ufer -anchor bolts in basement to be in the middle 1/3 of sill plate -receptacle required within 25’ of A/C condenser
Erosion Control Inspection Residential Failed 9/27/2024 09/27/2024
Misc
Corrective Action Required
09/27/2024
- REMOVE TRASH AND DEBRIS FROM LOT
All Rough Inspection - Residential Failed 9/27/2024 9/27/2024 09/27/2024
Misc
Corrective Action Required
09/23/2024
-provide hold down device per plans at girder trusses -fire block hvac chase to ceiling space near bath2 -address front entry top plate not tied to adjoining walls top plates -address holes drilled closer than 2” to one another for pex under primary bath -address electrical drilled through top of floor joist near ufer -anchor bolts in basement to be in the middle 1/3 of sill plate
All Rough Inspection - Residential Failed 10/3/2024 10/3/2024 10/03/2024
Misc
Corrective Action Required
09/27/2024
-provide hold down device per plans at girder trusses -fire block hvac chase to ceiling space near bath2 -address front entry top plate not tied to adjoining walls top plates -address holes drilled closer than 2” to one another for pex under primary bath -address electrical drilled through top of floor joist near ufer -anchor bolts in basement to be in the middle 1/3 of sill plate
Miscellaneous Correction
Corrective Action Required
10/03/2024
Neutral in electrical panel is loose at the lug
Gas Service Inspection - Residential Passed 10/3/2024 10/3/2024 10/03/2024
All Rough Inspection - Residential Failed 10/3/2024 10/03/2024
Misc
Corrective Action Required
10/03/2024
-provide hold down device per plans at girder trusses -fire block hvac chase to ceiling space near bath2 -address front entry top plate not tied to adjoining walls top plates -address holes drilled closer than 2” to one another for pex under primary bath -address electrical drilled through top of floor joist near ufer -anchor bolts in basement to be in the middle 1/3 of sill plate
Miscellaneous Correction
Corrective Action Required
10/03/2024
-Neutral in electrical panel is loose at the lug -fire block hvac chase to ceiling space near bath2 (better seal for fire blocking)
Electrical Service Inspection Failed 10/3/2024 10/3/2024 10/03/2024
Miscellaneous Correction
Corrective Action Required
10/03/2024
Neutral in the electrical panel at the lug is loose
Electrical Service Inspection Passed 10/3/2024 10/03/2024
Miscellaneous Correction
Resolved
10/03/2024
Neutral in the electrical panel at the lug is loose
All Rough Inspection - Residential Passed 10/3/2024 10/03/2024
Misc
Resolved
10/03/2024
-provide hold down device per plans at girder trusses -fire block hvac chase to ceiling space near bath2 -address front entry top plate not tied to adjoining walls top plates -address holes drilled closer than 2” to one another for pex under primary bath -address electrical drilled through top of floor joist near ufer -anchor bolts in basement to be in the middle 1/3 of sill plate
Miscellaneous Correction
Resolved
10/03/2024
-Neutral in electrical panel is loose at the lug -fire block hvac chase to ceiling space near bath2 (better seal for fire blocking)
Driveway Inspection Partial 10/10/2024 10/10/2024 10/10/2024
Misc
Informational
10/10/2024
10-10-24 Dustin A, dw is formed and compacted, slopes are in compliance . Approved to pour
Erosion Control Inspection Residential Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Corrective Action Required
09/27/2024
- REMOVE TRASH AND DEBRIS FROM LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, Straw waddle has been damaged or removed in spots and needs to be fixed .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 10/17/2024 10/17/2024 10/17/2024
Misc
Corrective Action Required
10/14/2024
- REMOVE TRASH AND DEBRIS FROM LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, Straw waddle has been damaged or removed in spots and needs to be fixed .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 10-17-24 Dustin A, not corrected
Erosion Control Inspection Residential Partial 11/15/2024 11/15/2024 11/15/2024
Misc
Resolved
11/15/2024
- REMOVE TRASH AND DEBRIS FROM LOT
DCM3 ESC REQUIRED 2 DAY
Resolved
11/15/2024
10-14-24 Dustin A, Straw waddle has been damaged or removed in spots and needs to be fixed .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 10-17-24 Dustin A, not corrected
Misc
Corrective Action Required
11/15/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Erosion Control Inspection Residential Partial 11/19/2024 11/19/2024
Misc
Corrective Action Required
11/15/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Plot Plan Inspection Passed 11/19/2024 11/19/2024
Occupancy Inspection - Codes Residential Failed 11/19/2024 11/19/2024 11/19/2024
Misc
Corrective Action Required
11/19/2024
- pay all fees - Driveway inspection pending - Provide gutters and downspouts - Provide splash pads - Final grading and sod - Provide security screws at front door hinges and strike plate - Complete outlets at kitchen counter - Garage door track to be secured at bottom no more than 18” from the bottom - Garage entry door must be self closing and latch - Reattach supports for ductwork in basement
Occupancy Inspection - Codes Residential Failed 11/21/2024 11/21/2024 11/21/2024
Misc
Corrective Action Required
11/19/2024
- pay all fees - Driveway inspection pending - Provide gutters and downspouts - Provide splash pads - Final grading and sod - Provide security screws at front door hinges and strike plate - Complete outlets at kitchen counter - Garage door track to be secured at bottom no more than 18” from the bottom - Garage entry door must be self closing and latch - Reattach supports for ductwork in basement
Miscellaneous Correction
Corrective Action Required
11/21/2024
•Oven anti tip over bracket is not working or not installed as per manufacturer specifications •Fire block all openings in sheet rock above garage overhead door Reattach duct work support bracket in basement •Sod, sump pump extension and splash pads are not installed •Driveway inspection final is not completed
Occupancy Inspection - Codes Residential Failed 11/22/2024 11/22/2024 11/22/2024
Misc
Corrective Action Required
11/21/2024
- Driveway inspection pending - Final grading and sod - Garage door track to be secured at bottom no more than 18” from the bottom
Miscellaneous Correction
Resolved
11/22/2024
•Oven anti tip over bracket is not working or not installed as per manufacturer specifications •Fire block all openings in sheet rock above garage overhead door Reattach duct work support bracket in basement •Sod, sump pump extension and splash pads are not installed •Driveway inspection final is not completed
Occupancy Inspection - Codes Residential Ready for Temp CO 11/25/2024 11/25/2024 11/25/2024
Misc
Resolved
11/25/2024
- Driveway inspection pending - Final grading and sod - Garage door track to be secured at bottom no more than 18” from the bottom
Miscellaneous Correction
Corrective Action Required
11/25/2024
- Driveway final inspection needs to be completed - Sod, splash pads and sump pump extension needs to be installed Passed for TCO only
Erosion Control Inspection Residential Partial 11/25/2024 11/25/2024
Misc
Corrective Action Required
11/19/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Erosion Control Inspection Residential Passed 11/26/2024 11/26/2024 11/26/2024
Misc
Resolved
11/26/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Driveway Inspection Passed 11/26/2024 11/26/2024 11/26/2024
Misc
Informational
10/10/2024
10-10-24 Dustin A, dw is formed and compacted, slopes are in compliance . Approved to pour 11-26-24 Dustin A, DW is poured to city specs. Passed
Occupancy Inspection - Codes Residential Full C of O 12/27/2024 12/27/2024 12/27/2024
Miscellaneous Correction
Resolved
12/27/2024
- Driveway final inspection needs to be completed - Sod, splash pads and sump pump extension needs to be installed Passed for TCO only
Documents & Images
Date Uploaded File Type Document Name
05/28/2024 HT #181 - PERMIT APP
05/31/2024 Permit Codes Residential Plan Review
05/31/2024 Plot Plan APPROVED PLOT PLAN
06/03/2024 Permit Codes Residential Plan Review
06/03/2024 Approved Plans APPROVED TRUSS PACKAGE
06/03/2024 Approved Plans APPROVED TRUSS LAYOUT
06/04/2024 Approved Plans APPROVED PLANS
06/04/2024 Permit Codes Residential Plan Review
06/04/2024 Permit DS Building Permit
06/04/2024 Receipt Receipt for transaction:2024-004378
06/22/2024 3RD Party Insp Report M L Crose 1621 SW Arborway Terr LSMO Hawthorne Ridge Lot 181 Clayton P 2024-2691 3rd Party Footing Inspection Report 6-21-24
06/25/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/23/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter Stop Work Order
10/17/2024 Letter Stop Work Order
11/15/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Receipt Receipt for transaction:2024-009104
11/22/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Certificate/License Codes Temporary Certificate of Occupancy
11/25/2024 Receipt Receipt for transaction:2024-009154
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter Codes Final Certificate of Occupancy
12/27/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: