Permit Application Status

PRRES20242123


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20242123
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ENG FLOOR SYSTEM ( DEF ) COVERED DECK
04/29/2024
05/07/2024
10/27/2024
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
PERMITTING@JFECONSTRUCTION.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/07/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/07/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/07/2024
9110078-Valuation Fee New Single Family $1,917.97 $1,917.97 Paid 05/07/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Water Service Inspection - R Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Informational
01/21/2025
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
Driveway Inspection Pending
Misc
Informational
04/10/2025
4-10-25 NS Site visited for a pre-pour inspection and it appears driveway meets city standards. No sidewalk I will come back when all-rough inspection is requested to do my final inspection.
Footing Inspection - Residential Passed 07/15/2024
Informational
07/15/2024
Footing approved by engineer
Erosion Control Inspection Residential Partial 7/15/2024 07/15/2024
Misc
Informational
07/15/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Erosion Control Inspection Residential Partial 7/29/2024 07/29/2024
Misc
Informational
07/15/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Sewer Service Inspection - R Passed 7/29/2024 07/29/2024
Erosion Control Inspection Residential Partial 9/10/2024 09/10/2024
Misc
Informational
07/29/2024
EROSION CONTROL IN COMPLIANCE. MAINTAIN EROSION CONTROL THROUGHOUT CONSTRUCTION
Underslab Plumbing Inspection - Residential Passed 9/10/2024 9/10/2024 09/10/2024
Erosion Control Inspection Residential Partial 10/3/2024 10/03/2024
Misc
Informational
09/10/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 10/3/2024 10/3/2024 10/03/2024
Misc
Corrective Action Required
10/03/2024
Garage PFH and rear CSPF walls nailing-OK
Electrical Service Inspection Passed 1/9/2025 1/9/2025 01/09/2025
Gas Service Inspection - Residential Passed 1/9/2025 1/9/2025 01/09/2025
Erosion Control Inspection Residential Partial 1/9/2025 01/09/2025
Misc
Informational
10/03/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
Erosion Control Inspection Residential Partial 1/21/2025 01/21/2025
Misc
Informational
01/09/2025
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 1/21/2025 1/21/2025 01/21/2025
Misc
Resolved
01/21/2025
Garage PFH and rear CSPF walls nailing-OK
Misc
Corrective Action Required
01/21/2025
-Nail front ZIP sheathing -Bearing wall top plates cut above cooktop -Strap loft area exterior wall top plates notched more than 50% -Engineer address support for ridge and hips above loft -Provide min 100 square inches clear area for each combustion air opening -Insulation shield must have min 1” air space around b-vent -Install ductings for all bathroom fans -Fb floor penetrations in fireplace space -Move front bedroom smoke alarm up -Provide full width support for I beam at rear dining -Install hangers near basement stair -Missing lvl beam under kitchen **OK TO INSULATE
All Rough Inspection - Residential Failed 1/27/2025 1/27/2025 01/27/2025
Misc
Corrective Action Required
01/21/2025
-Nail front ZIP sheathing **The ZIP board outside the front office is not nailed properly (8d@12" in field) -Engineer address support for ridge and hips above loft **The plan does not show the vault connection detail that it refers to on the same sheet -Missing lvl beam under kitchen **Is there an LVL beam under the bearing wall? Verify **OK TO INSULATE
All Rough Inspection - Residential Failed 1/28/2025 1/28/2025 01/28/2025
Misc
Corrective Action Required
01/27/2025
-Nail front ZIP sheathing **The ZIP board outside the front office is not nailed properly (8d@12" in field) -Engineer address support for ridge and hips above loft **The plan does not show the vault connection detail that it refers to on the same sheet -Missing lvl beam under kitchen **Is there an LVL beam under the bearing wall? Verify **OK TO INSULATE
All Rough Inspection - Residential Passed 1/29/2025 1/29/2025 01/29/2025
Misc
Resolved
01/29/2025
-Nail front ZIP sheathing **The ZIP board outside the front office is not nailed properly (8d@12" in field) -Engineer address support for ridge and hips above loft **The plan does not show the vault connection detail that it refers to on the same sheet -Missing lvl beam under kitchen **Is there an LVL beam under the bearing wall? Verify **OK TO INSULATE
Driveway Inspection Partial 4/10/2025 04/10/2025
Misc
Informational
04/10/2025
4-10-25 NS Site visited for a pre-pour inspection and it appears driveway meets city standards. No sidewalk I will come back when all-rough inspection is requested to do my final inspection.
Documents & Images
Date Uploaded File Type Document Name
04/29/2024 LOT 15 FINAL
04/29/2024 WO-15 - 2508 NE WOODLAND OAK CIR_PERMIT_4-23-24
04/29/2024 WO15 - Permit App
04/29/2024 WO15 - Tax App
04/30/2024 Permit Codes Residential Plan Review
05/02/2024 LOT 15 CITY
05/02/2024 WO-15 - 2508 NE WOODLAND OAK CIR_PERMIT_5-1-24
05/07/2024 Approved Plans APPROVED PLANS
05/07/2024 Plot Plan APPROVED PLOT PLAN
05/07/2024 Permit Codes Residential Plan Review
05/07/2024 Permit DS Building Permit
05/07/2024 Receipt Receipt for transaction:2024-003072
07/15/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/19/2024 Approved Plans APPROVED FLOOR JOIST LAYOUT
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/13/2024 3RD Party Insp Report THIRD PARTY SLAB INSPECTION
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/27/2025 2115 SW HOOK FARM DR FTG INSP
01/27/2025 2508 NE Woodland Oak Cir_ALL SLAB INSP_2024-09-12
01/27/2025 2508 NE Woodland Oak Cir_Framing Evaluation Report_1-24-25
01/27/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 2508 NE Woodland Oak Cir_Framing Evaluation Report_1-28-25
01/29/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home