Permit Application Status

PRRES20241801


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241801
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
04/12/2024
04/23/2024
10/14/2024
03/31/2025
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
JORDAN@JFECONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 04/23/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 04/23/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 04/23/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/23/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 04/23/2024
9110078-Valuation Fee New Single Family $1,641.83 $1,641.83 Paid 04/23/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/31/2024 7/31/2024 07/31/2024
Misc
Informational
07/31/2024
Approved by Al Hermans on 7/17/24
Erosion Control Inspection Residential Partial 7/31/2024 07/31/2024
Misc
Informational
07/31/2024
7/31/24 -In compliance at time of inspection
Sewer Service Inspection - R Passed 8/1/2024 08/01/2024
Water Service Inspection - R Passed 8/2/2024 08/02/2024
Underslab Electrical Inspection - Residential Passed 8/8/2024 8/8/2024 08/08/2024
Underslab Plumbing Inspection - Residential Passed 8/8/2024 8/8/2024 08/08/2024
Erosion Control Inspection Residential Failed 8/8/2024 08/08/2024
Misc
Resolved
08/08/2024
7/31/24 -In compliance at time of inspection
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/08/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/08/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN GRAVEL ENTRY -Maintain overgrown vegetation
All Rough Inspection - Residential Failed 11/7/2024 11/7/2024 11/07/2024
Misc
Corrective Action Required
11/07/2024
-secure gas line at fireplace -seal top plate penetration in primary closet -Add fireblock at bed 3 closet for vertical to horizontal fireblock ever 10’ -add blocking under return air in stud bay stairwell/garage entry wall -ensure siding secured to plans and code
Gas Service Inspection - Residential Failed 11/7/2024 11/7/2024 11/07/2024
Misc
Corrective Action Required
11/07/2024
No pressure at gauge
Electrical Service Inspection Passed 11/7/2024 11/7/2024 11/07/2024
Gas Service Inspection - Residential Failed 11/18/2024 11/18/2024 11/18/2024
Misc
Resolved
11/18/2024
No pressure at gauge
Miscellaneous Correction
Corrective Action Required
11/18/2024
Gas gauge is at 2 1/2 PSI at inspection Gas needs to be pressurized to at least 10 PSI for inspection
All Rough Inspection - Residential Failed 11/18/2024 11/18/2024 11/18/2024
Misc
Resolved
11/18/2024
-secure gas line at fireplace -seal top plate penetration in primary closet -Add fireblock at bed 3 closet for vertical to horizontal fireblock ever 10’ -add blocking under return air in stud bay stairwell/garage entry wall -ensure siding secured to plans and code
Miscellaneous Correction
Corrective Action Required
11/18/2024
Gas inspection must pass
Gas Service Inspection - Residential Passed 11/19/2024 11/19/2024 11/19/2024
Miscellaneous Correction
Resolved
11/19/2024
Gas gauge is at 2 1/2 PSI at inspection Gas needs to be pressurized to at least 10 PSI for inspection
All Rough Inspection - Residential Passed 11/19/2024 11/19/2024
Miscellaneous Correction
Resolved
11/19/2024
Gas inspection must pass
Driveway Inspection Partial 2/3/2025 2/3/2025 02/03/2025
Misc
Corrective Action Required
02/03/2025
2-3-25 Dustin A water is removed, Gravel compacted. Approved to pour
Sidewalk Inspection Partial 2/3/2025 2/3/2025 02/03/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A sw is for.ed and compacted and slopes are in compliance. Approved to pour
Driveway Inspection Passed 2/11/2025 2/11/2025 02/11/2025
Misc
Corrective Action Required
02/03/2025
2-3-25 Dustin A water is removed, Gravel compacted. Approved to pour 2-11-25 Dustin A, Dw is poured to city specs. Pass
Sidewalk Inspection Failed 2/11/2025 2/11/2025 02/11/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it
Piers/Caissons Inspection - Residential Passed 3/3/2025 03/03/2025
Occupancy Inspection - Codes Residential Failed 3/3/2025 3/3/2025 03/03/2025
Misc
Corrective Action Required
03/03/2025
-provide as graded plot plan -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -obtain issued lawn irrigation permit -paint gas line under deck
Sidewalk Inspection Partial 3/21/2025 03/21/2025
Misc
Informational
02/11/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it 3-21-25 Dustin A, SW that needed to be replaced has been formed and compacted. Slopes are in compliance at this time.
Plot Plan Inspection Passed 3/25/2025 03/25/2025
Occupancy Inspection - Codes Residential Failed 3/26/2025 3/26/2025 03/26/2025
Misc
Corrective Action Required
03/03/2025
Address pending sidewalk inspections inspection
Sidewalk Inspection Failed 3/28/2025 3/28/2025 03/26/2025
Misc
Informational
03/21/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it 3-21-25 Dustin A, SW that needed to be replaced has been formed and compacted. Slopes are in compliance at this time. 3-26-25 DP. SW on the west side of the DW has cross slopes that are out of compliance.
Sidewalk Inspection Partial 3/28/2025 3/28/2025 03/27/2025
Misc
Informational
03/26/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it 3-21-25 Dustin A, SW that needed to be replaced has been formed and compacted. Slopes are in compliance at this time. 3-26-25 DP. SW on the west side of the DW has cross slopes that are out of compliance. 3-27-25 Dustin A, Met with contractor to show which panels are out .
Sidewalk Inspection Partial 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
03/27/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it 3-21-25 Dustin A, SW that needed to be replaced has been formed and compacted. Slopes are in compliance at this time. 3-26-25 DP. SW on the west side of the DW has cross slopes that are out of compliance. 3-27-25 Dustin A, Met with contractor to show which panels are out . 3-28-25 ,Dustin A, panels are removed, section is recompacted and formed. Approved to pour
Sidewalk Inspection Passed 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/28/2025
2-3-25 Dustin A sw is formed and compacted and slopes are in compliance. Approved to pour 2-11-25 Dustin A, Some of sidewalk is poured. there is a section that is out of ADA compliance at 2.4% and a section missing. The panel out has some pink paint splatter on it 3-21-25 Dustin A, SW that needed to be replaced has been formed and compacted. Slopes are in compliance at this time. 3-26-25 DP. SW on the west side of the DW has cross slopes that are out of compliance. 3-27-25 Dustin A, Met with contractor to show which panels are out . 3-28-25 ,Dustin A, panels are removed, section is recompacted and formed. Approved to pour 3-31-25 DP. SW has been poured, cross slopes are now in compliance forms have been removed. Passed
Erosion Control Inspection Residential Passed 03/31/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/31/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
03/31/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN GRAVEL ENTRY -Maintain overgrown vegetation
Occupancy Inspection - Codes Residential Full C of O 3/31/2025 3/31/2025 03/31/2025
Misc
Resolved
03/31/2025
Address pending sidewalk inspections inspection
Documents & Images
Date Uploaded File Type Document Name
04/12/2024 HF111 - Premit App
04/12/2024 HF111 - Tax App
04/12/2024 HF-111 - 2203 SW HOOK FARM DR_PERMIT_1-24-24
04/12/2024 LOT 111 FINAL 2-20-24
04/17/2024 Permit Codes Residential Plan Review
04/18/2024 HF-111 - 2203 SW HOOK FARM DR_PERMIT_1-24-24
04/18/2024 Approved Plans APPROVED PLANS
04/23/2024 LOT 111 CITY
04/23/2024 Plot Plan APPROVED PLOT PLAN
04/23/2024 Permit Codes Residential Plan Review
04/23/2024 Permit DS Building Permit
04/23/2024 Receipt Receipt for transaction:2024-002586
07/26/2024 2203 SW HOOK FARMS DR FTG INSP
07/31/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
09/05/2024 3RD Party Insp Report THIRD PARTY PIER INSPECTION
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter Field Certificate of Occupancy
03/31/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home