Permit Application Status

PRRES20236672


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20236672
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK.
12/26/2023
01/04/2024
06/26/2024
10/25/2024
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
WALKERCUSTOMHOMESKC@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 01/04/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 01/04/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 01/04/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/04/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 01/04/2024
9110078-Valuation Fee New Single Family $2,382.29 $2,382.29 Paid 01/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 2/16/2024 2/16/2024 02/16/2024
Sewer Service Inspection - R Passed 2/22/2024 2/22/2024 02/22/2024
Water Service Inspection - R Partial 2/22/2024 2/22/2024 02/22/2024
Misc
Informational
02/22/2024
Pex ran roughly 20’ from foundation
Water Service Inspection - R Passed 2/23/2024 2/23/2024 02/23/2024
Misc
Resolved
02/23/2024
Pex ran roughly 20’ from foundation
Underslab Plumbing Inspection - Residential Passed 3/12/2024 3/12/2024 03/12/2024
All Rough Inspection - Residential Failed 6/6/2024 6/6/2024 06/06/2024
Misc
Corrective Action Required
06/06/2024
-missing 2x10 joist above garage -block in between ceiling joist landing on rear garage wall -fireblock hvac chase to ceiling space. (If using Unfaced insulation, it must be packed tightly and securely -address cut floor joist above hvac chase -top plate penetration S master bath wall -4 studs under lvl either end above wall in closet master -tighten all anchor bolts in basement -sister all over notched exterior wall studs in basement -fire block vertically to horizontally every 10’ in basement -
Electrical Service Inspection Passed 6/6/2024 6/6/2024 06/06/2024
Gas Service Inspection - Residential Passed 6/6/2024 6/6/2024 06/06/2024
All Rough Inspection - Residential Failed 6/11/2024 6/11/2024 06/11/2024
Misc
Corrective Action Required
06/06/2024
-top plate penetration S master bath wall -4 studs under lvl either end above wall in closet master
All Rough Inspection - Residential Passed 6/13/2024 6/13/2024 06/13/2024
Misc
Resolved
06/13/2024
-top plate penetration S master bath wall -4 studs under lvl either end above wall in closet master
Sidewalk Inspection Partial 7/2/2024 7/2/2024 07/02/2024
Misc
Informational
07/02/2024
7-2-24 Dustin A,Sw is formed and compacted to city specs and slopes are in compliance, Approved to pour
Sidewalk Inspection Passed 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
07/02/2024
7-2-24 Dustin A,Sw is formed and compacted to city specs and slopes are in compliance, Approved to pour 7-9-24 Dustin A, SW is poured to city specs and slopes are in compliance. Passed
Driveway Inspection Passed 7/2/2024 7/2/2024 07/09/2024
Misc
Informational
07/02/2024
7-2-24 Dustin A, DW is formed and compacted to city specs. Approved to pour 7-9-24 Dustin A, Dw is poured to city specs and slopes are in compliance. Passed
Driveway Inspection Passed 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
07/02/2024
7-2-24 Dustin A, DW is formed and compacted to city specs. Approved to pour 7-9-24 Dustin A, DW is poured to city specs
Erosion Control Inspection Residential Failed 7/11/2024 07/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION
Plot Plan Inspection Passed 8/19/2024 08/19/2024
Occupancy Inspection - Codes Residential Failed 10/15/2024 10/15/2024 10/15/2024
Misc
Corrective Action Required
10/15/2024
-sod -splash blocks and sump pump discharge to extend 36” from foundation -set screw fire water anti siphon device in basement -addressed electrical deck post to beam connections -paint gas lines at deck
Erosion Control Inspection Residential Passed 10/25/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
10/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION
Occupancy Inspection - Codes Residential Full C of O 10/25/2024 10/25/2024 10/25/2024
Misc
Resolved
10/25/2024
-sod -splash blocks and sump pump discharge to extend 36” from foundation -set screw fire water anti siphon device in basement -addressed electrical deck post to beam connections -paint gas lines at deck
Documents & Images
Date Uploaded File Type Document Name
12/26/2023 2759 SW Heartland Signed City Documents
12/26/2023 RHF186 Spellerberg - Sealed Plans (December 11, 2023)
12/29/2023 Approved Plans APPROVED PLANS
12/29/2023 Permit Codes Residential Plan Review
01/04/2024 Plot Plan APPROVED PLOT PLAN
01/04/2024 Permit Codes Residential Plan Review
01/04/2024 Permit DS Building Permit
01/04/2024 Receipt Receipt for transaction:2024-000075
02/16/2024 Wilmoth 2759 SW Heartland Rd LSMO Hook Farms Lot 186 Footing Inspection Report 2-15-24
02/16/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/23/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
08/16/2024 Plot Plan APPROVED AS BUILT PLOT PLAN
08/19/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter Field Certificate of Occupancy
10/25/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home