Summary
PRRES20231910
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
05/01/2023
05/12/2023
11/05/2023
05/16/2024
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
CBRUNING@NEWMARKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,730.00 $3,730.00 Paid 05/12/2023
8350015-Water Meter Fee $550.50 $550.50 Paid 05/12/2023
8331507-Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 05/12/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/12/2023
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/12/2023
9110078-Valuation Fee New Single Family $1,519.79 $1,519.79 Paid 05/12/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/08/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/08/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/24/2023 (1:00) 5/24/2023 05/24/2023
MISC
Informational
06/14/2023
Piers poured with foundation
Piers/Caissons Inspection - Residential Passed 3/12/2024 05/24/2023
Misc
Informational
05/24/2023
Deck piers poured with footing
Underslab Plumbing Inspection - Residential Passed 6/14/2023 6/14/2023 06/14/2023
Sewer Service Inspection - R Passed 6/19/2023 (1:30) 6/19/2023 06/19/2023
Water Service Inspection - R Passed 6/22/2023 (1:30) 6/22/2023 06/22/2023
All Rough Inspection - Residential Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Corrective Action Required
07/12/2023
Garage portal frame only okay to cover
Gas Service Inspection - Residential Passed 9/11/2023 9/11/2023 09/11/2023
All Rough Inspection - Residential Failed 9/11/2023 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
Garage portal frame only okay to cover
Misc
Corrective Action Required
09/11/2023
-fire block owners bath tub floor -fire block owners shower/owner’s closet wall to ceiling space -fire block beam ends throughout basement -fire block dead space right of wet bar in basement -provide support for furr down ceiling joist to floor joist above Okay to insulate
Electrical Service Inspection Passed 9/11/2023 9/11/2023 09/11/2023
All Rough Inspection - Residential Passed 9/12/2023 9/12/2023 09/12/2023
Misc
Corrective Action Required
09/11/2023
Driveway Inspection Partial 9/25/2023 9/25/2023 09/25/2023
Misc
Informational
09/25/2023
9-25-23 A.A, DW is formed. Aggregate is compacted. Will need to maintain 2% through approach. Approved to pour
Sidewalk Inspection Partial 9/25/2023 9/25/2023 09/25/2023
Misc
Informational
09/25/2023
9-25-23 A.A, SW is formed and aggregate is compacted. Slopes are in compliance. Conditions can change . Approved to pour
Driveway Inspection Partial 10/2/2023 10/2/2023 10/02/2023
Misc
Informational
09/25/2023
9-25-23 A.A, DW is formed. Aggregate is compacted. Will need to maintain 2% through approach. Approved to pour 10-2-23 Dustin A, DW is poured. Slopes are in compliance . Cannot pass until forms are pulled
Sidewalk Inspection Partial 10/2/2023 10/2/2023 10/02/2023
Misc
Informational
09/25/2023
9-25-23 A.A, SW is formed and aggregate is compacted. Slopes are in compliance. Conditions can change . Approved to pour 10-2-23 Dustin A, SW is poured. Slopes are in compliance. Cannot pass until forms are pulled.
Driveway Inspection Partial 10/10/2023 10/10/2023 10/10/2023
Misc
Informational
10/02/2023
9-25-23 A.A, DW is formed. Aggregate is compacted. Will need to maintain 2% through approach. Approved to pour 10-2-23 Dustin A, DW is poured. Slopes are in compliance . Cannot pass until forms are pulled 10-10-23 Dustin A, Conditions have not changed
Driveway Inspection Partial 10/10/2023 10/10/2023 10/10/2023
Misc
Informational
10/10/2023
9-25-23 A.A, DW is formed. Aggregate is compacted. Will need to maintain 2% through approach. Approved to pour 10-2-23 Dustin A, DW is poured. Slopes are in compliance . Cannot pass until forms are pulled 10-10-23 Dustin A, Conditions have not changed
Driveway Inspection Passed 10/17/2023 10/17/2023 10/16/2023
Misc
Informational
10/10/2023
9-25-23 A.A, DW is formed. Aggregate is compacted. Will need to maintain 2% through approach. Approved to pour 10-2-23 Dustin A, DW is poured. Slopes are in compliance . Cannot pass until forms are pulled 10-10-23 Dustin A, Conditions have not changed 10-16-23 Dustin A, Forms pulled, Passed
Sidewalk Inspection Passed 10/10/2023 10/10/2023 10/16/2023
Misc
Informational
10/02/2023
9-25-23 A.A, SW is formed and aggregate is compacted. Slopes are in compliance. Conditions can change . Approved to pour 10-2-23 Dustin A, SW is poured. Slopes are in compliance. Cannot pass until forms are pulled. 10-10-23 Dustin A, Conditions have not changed 10-13-23 Dustin A, Forms Pulled. Passed
Sidewalk Inspection Passed 10/17/2023 10/17/2023 10/16/2023
Misc
Informational
10/10/2023
9-25-23 A.A, SW is formed and aggregate is compacted. Slopes are in compliance. Conditions can change . Approved to pour 10-2-23 Dustin A, SW is poured. Slopes are in compliance. Cannot pass until forms are pulled. 10-10-23 Dustin A, Conditions have not changed 10-16-23 Dustin A, Forms Pulled. Passed
Plot Plan Inspection Passed 12/22/2023 12/22/2023
Occupancy Inspection - Codes Residential Failed 12/22/2023 12/22/2023 12/22/2023
Misc
Corrective Action Required
12/22/2023
-obtain issued lawn irrigation permit -sod -slash blocks and sump pump discharge -will check water meter at time of sod -whirlpool bathtub pump access opening to be 12”x12” or 18”x18” if more that 24” from opening -spark rings where as required in basement wet bar area -(2) 1/2” through bolts at deck post to beam connections
Occupancy Inspection - Codes Residential Ready for Temp CO 1/9/2024 1/9/2024 01/09/2024
Misc
Corrective Action Required
12/22/2023
-obtain issued lawn irrigation permit -sod -slash blocks and sump pump discharge -will check water meter at time of sod
Occupancy Inspection - Codes Residential Ready for Temp CO 2/8/2024 02/08/2024
Misc
Corrective Action Required
01/09/2024
-obtain issued lawn irrigation permit -sod -slash blocks and sump pump discharge -will check water meter at time of sod
Occupancy Inspection - Codes Residential Failed 3/21/2024 3/21/2024 03/21/2024
Misc
Corrective Action Required
02/08/2024
Pay all fees -obtain issued lawn irrigation permit -vegetation required for disturbed land at Swale
Occupancy Inspection - Codes Residential Ready for Temp CO 4/8/2024 04/08/2024
Misc
Corrective Action Required
03/21/2024
Pay all fees -obtain issued lawn irrigation permit -vegetation required for disturbed land at Swale
Occupancy Inspection - Codes Residential Failed 4/16/2024 4/16/2024 04/16/2024
Misc
Corrective Action Required
04/08/2024
-vegetation required for disturbed land at Swale
Erosion Control Inspection Residential Passed 05/16/2024
Occupancy Inspection - Codes Residential Full C of O 5/16/2024 05/16/2024
Misc
Resolved
05/16/2024
-vegetation required for disturbed land at Swale
Documents & Images
Date Uploaded File Type Document Name
05/01/2023 Lees Summit Builidng Permit Application Signed
05/03/2023 Permit Codes Residential Plan Review
05/08/2023 Permit Codes Residential Plan Review
05/09/2023 Plot Plan APPROVED PLOT PLAN
05/09/2023 Permit Codes Residential Plan Review
05/11/2023 Approved Plans APPROVED PLANS
05/11/2023 Permit Codes Residential Plan Review
05/12/2023 Permit DS Building Permit
05/12/2023 Receipt Receipt for transaction:2023-003183
05/24/2023 Letter INSPECTION SUMMARY
05/24/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/19/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/12/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
10/02/2023 Letter INSPECTION SUMMARY
10/02/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
11/29/2023 Plot Plan APPROVED AS BUILT PLOT PLAN
12/22/2023 Letter INSPECTION SUMMARY
12/22/2023 Letter INSPECTION SUMMARY
01/09/2024 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2024 Receipt Receipt for transaction:2024-000159
02/08/2024 TCO extension Form - Lees Summit
03/21/2024 Letter INSPECTION SUMMARY
04/08/2024 Certificate/License Codes Temporary Certificate of Occupancy
04/08/2024 Certificate/License Codes Temporary Certificate of Occupancy
04/08/2024 Receipt Receipt for transaction:2024-002227
04/08/2024 TCOExtension Request Form - Lees Summit
04/16/2024 Certificate/License Codes Temporary Certificate of Occupancy
04/16/2024 Receipt Receipt for transaction:2024-002419
04/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter Field Certificate of Occupancy
05/16/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home