Permit Application Status

PRRES20231252


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20231252
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES
03/27/2023
05/30/2023
09/26/2023
06/25/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
JASONH@CLOVERANDHIVE.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 05/30/2023
Right of Way Permit Fee $85.00 $85.00 Paid 05/30/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/30/2023
Water Tap Fee $3,730.00 $3,730.00 Paid 05/30/2023
Water Meter Fee $550.50 $550.50 Paid 05/30/2023
Valuation Fee New Single Family $1,241.73 $1,241.73 Paid 05/30/2023
Not Ready Inspection Fee $75.00 $75.00 Paid 06/14/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 06/14/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Passed 10/19/2023 10/19/2023
Miscellaneous Correction
Informational
10/19/2023
Builder sent in a extension form to extend this permit
Footing Inspection - Residential Passed 2/15/2024 02/15/2024
Miscellaneous Correction
Informational
02/15/2024
Footing was field verified and passed by a third party. Piers were not mentioned in the footing inspection
Sewer Service Inspection - R Passed 2/27/2024 2/27/2024 02/27/2024
Water Service Inspection - R Passed 2/27/2024 2/27/2024 02/27/2024
Erosion Control Inspection Residential Failed 2/29/2024 02/29/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/29/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR SILT FENCE AT FRONT OF LOT.
Underslab Plumbing Inspection - Residential Passed 2/29/2024 2/29/2024 02/29/2024
All Rough Inspection - Residential Not Ready 3/19/2024 3/19/2024 03/19/2024
Miscellaneous Correction
Corrective Action Required
03/19/2024
Portal inspection only - garage interior tie down straps not installed - exterior garage tie down straps not nailed off - back exterior wall is not nailed off - back interior wall straps are not installed Walk your property before scheduling an inspection Not ready for inspection
All Rough Inspection - Residential Partial 3/22/2024 03/22/2024
Miscellaneous Correction
Resolved
03/22/2024
Portal inspection only - garage interior tie down straps not installed - exterior garage tie down straps not nailed off - back exterior wall is not nailed off - back interior wall straps are not installed Walk your property before scheduling an inspection Not ready for inspection
Miscellaneous Correction
Informational
03/22/2024
Portal framing inspection passed. Okay to cover This is a partial all rough pass only.
Erosion Control Inspection Residential Failed 4/1/2024 04/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/29/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR SILT FENCE AT FRONT OF LOT.
Miscellaneous Correction
Corrective Action Required
04/01/2024
Repair silt fence at the front of the lot and reinstall silt fence along the east side of the property
All Rough Inspection - Residential Not Ready 4/9/2024 4/9/2024 04/09/2024
Miscellaneous Correction
Informational
03/22/2024
Portal framing inspection passed. Okay to cover This is a partial all rough pass only.
R602.8 Fireblocking required
Corrective Action Required
04/09/2024
INSPECTION DENIED, NOT READY, NO FIRE BLOCKING WOOD WALL FRAMING. Fireblocking shall be provided to cut off all concealed draft openings (both vertical and horizontal) and to form an effective fire barrier between stories, and between a top story and the roof space. Fireblocking shall be provided in wood-frame construction in the following locations. 1. In concealed spaces of stud walls and partitions, including furred spaces and parallel rows of studs or staggered studs; as follows: 1.1. Vertically at the ceiling and floor levels. 1.2. Horizontally at intervals not exceeding 10 feet (3048 mm). 2. At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings. 3. In concealed spaces between stair stringers at the top and bottom of the run. Enclosed spaces under stairs shall comply with Section R311.2.2. 4. At openings around vents, pipes, ducts, cables and wires at ceiling and floor level, with an approved material to resist the free passage of flame and products of combustion. 5. For the fireblocking of chimneys and fireplaces, see Section R1003.19. 6. Fireblocking of cornices of a two-family dwelling is required at the line of dwelling unit separation.
All Rough Inspection - Residential Failed 4/12/2024 4/12/2024 04/12/2024
Miscellaneous Correction
Informational
04/09/2024
Portal framing inspection passed. Okay to cover This is a partial all rough pass only.
R602.8 Fireblocking required
Resolved
04/12/2024
INSPECTION DENIED, NOT READY, NO FIRE BLOCKING WOOD WALL FRAMING. Fireblocking shall be provided to cut off all concealed draft openings (both vertical and horizontal) and to form an effective fire barrier between stories, and between a top story and the roof space. Fireblocking shall be provided in wood-frame construction in the following locations. 1. In concealed spaces of stud walls and partitions, including furred spaces and parallel rows of studs or staggered studs; as follows: 1.1. Vertically at the ceiling and floor levels. 1.2. Horizontally at intervals not exceeding 10 feet (3048 mm). 2. At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings. 3. In concealed spaces between stair stringers at the top and bottom of the run. Enclosed spaces under stairs shall comply with Section R311.2.2. 4. At openings around vents, pipes, ducts, cables and wires at ceiling and floor level, with an approved material to resist the free passage of flame and products of combustion. 5. For the fireblocking of chimneys and fireplaces, see Section R1003.19. 6. Fireblocking of cornices of a two-family dwelling is required at the line of dwelling unit separation.
Miscellaneous Correction
Corrective Action Required
04/12/2024
2126 SW Rutherford. All rough -One LIB in garage is not nailed to bottom sole plate -Top of HVAC chase needs to be fire blocked -Nail corners to code -Primary and great room missing nailing pattern for CS-PF -LIB in bathroom 2 missing -Add stud at dining room exterior wall for header support -Attic access is missing and is not on city approved plans -Provide garage Simpson hold down strap specs.
Electrical Service Inspection Passed 4/12/2024 4/12/2024 04/12/2024
Gas Service Inspection - Residential Passed 4/12/2024 4/12/2024 04/12/2024
Erosion Control Inspection Residential Partial 4/12/2024 04/12/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/12/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR SILT FENCE AT FRONT OF LOT.
Miscellaneous Correction
Resolved
04/12/2024
Repair silt fence at the front of the lot and reinstall silt fence along the east side of the property
Miscellaneous Correction
Informational
04/12/2024
Full erosion control is in place and must be maintained until CofO
All Rough Inspection - Residential Passed 4/16/2024 4/16/2024 04/16/2024
Miscellaneous Correction
Informational
04/12/2024
Portal framing inspection passed. Okay to cover This is a partial all rough pass only.
Miscellaneous Correction
Resolved
04/16/2024
2126 SW Rutherford. All rough -One LIB in garage is not nailed to bottom sole plate -Top of HVAC chase needs to be fire blocked -Nail corners to code -Primary and great room missing nailing pattern for CS-PF -LIB in bathroom 2 missing -Add stud at dining room exterior wall for header support -Attic access is missing and is not on city approved plans -Provide garage Simpson hold down strap specs.
Sidewalk Inspection Partial 4/16/2024 4/16/2024 04/16/2024
Misc
Informational
04/16/2024
4-16-24 PS Sidewalk pre pour, forms in place and aggregate has been compacted, approved to pour
Driveway Inspection Partial 4/16/2024 4/16/2024 04/16/2024
Misc
Informational
04/16/2024
4-16-24 PS Driveway approach pre pour, forms in place and aggregate compacted, approved to pour
Plot Plan Inspection Passed 6/11/2024 06/11/2024
Erosion Control Inspection Residential Failed 6/11/2024 06/11/2024
Miscellaneous Correction
Resolved
06/11/2024
Full erosion control is in place and must be maintained until CofO
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/11/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED Remove mud from the sidewalks
Sidewalk Inspection Passed 6/14/2024 6/14/2024 06/14/2024
Misc
Informational
04/16/2024
4-16-24 PS Sidewalk pre pour, forms in place and aggregate has been compacted, approved to pour 6-14-24 PS Sidewalk meets ADA and LS specs
Driveway Inspection Passed 6/14/2024 6/14/2024 06/14/2024
Misc
Informational
04/16/2024
4-16-24 PS Driveway approach pre pour, forms in place and aggregate compacted, approved to pour 6-14-24 PS Driveway approach meets ADA and LS specs
Erosion Control Inspection Residential Failed 6/14/2024 06/14/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/11/2024
- MAINTAIN EROSION CONTROL UNTIL SOD IS DOWN.
Occupancy Inspection - Codes Residential Failed 6/14/2024 6/14/2024 06/14/2024
Misc
Corrective Action Required
06/14/2024
NOT READY, INSPECTION DENIED - NO ADDRESS, NO EROSION CONTROL AT FRONT OF LOT.
Erosion Control Inspection Residential Passed 6/18/2024 06/18/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/18/2024
- MAINTAIN EROSION CONTROL UNTIL SOD IS DOWN.
Occupancy Inspection - Codes Residential Failed 6/18/2024 6/18/2024 06/18/2024
Misc
Resolved
06/18/2024
NOT READY, INSPECTION DENIED - NO ADDRESS, NO EROSION CONTROL AT FRONT OF LOT.
Miscellaneous Correction
Corrective Action Required
06/18/2024
2126 SW Rutherford. Occupancy -Fire block all holes or penetrations in the garage sheet rock -Hot water tank needs a lock out installed at the electrical panel -Splash blocks need to be installed
Driveway Inspection Failed 6/19/2024 6/19/2024 06/19/2024
Misc
Corrective Action Required
06/19/2024
6-19-24 PS Driveway approach damaged post inspection, approach will need to be replaced meeting LS and ADA requirements
Driveway Inspection Passed 6/25/2024 6/25/2024 06/25/2024
Misc
Corrective Action Required
06/19/2024
6-19-24 PS Driveway approach damaged post inspection, approach will need to be replaced meeting LS and ADA requirements 6-25-24 Dustin A. DW has been repoured to city specs. Forms still need to be pulled. Passed.
Occupancy Inspection - Codes Residential Full C of O 6/25/2024 6/25/2024 06/25/2024
Miscellaneous Correction
Resolved
06/25/2024
2126 SW Rutherford. Occupancy -Fire block all holes or penetrations in the garage sheet rock -Hot water tank needs a lock out installed at the electrical panel -Splash blocks need to be installed
Documents & Images
Date Uploaded File Type Document Name
03/27/2023 OS #73 - Wildflower - Farmhouse 2 - Complete Set
03/27/2023 OS #73 - Wildflower - Farmhouse 2 - Trusses
03/27/2023 P220320 - Clover and Hive - Lot 73 Osage - Drawings
03/27/2023 OS #73 - PERMIT APP
03/27/2023 LOT 73 CON 3-15-23
03/30/2023 Permit Codes Residential Plan Review
04/05/2023 LOT 73 FINAL
04/06/2023 Approved Plans APPROVED PLANS
04/06/2023 Approved Plans APPROVED TRUSS LAYOUT
04/06/2023 Approved Plans APPROVED TRUSS PACKAGE
04/06/2023 Permit Codes Residential Plan Review
05/30/2023 Permit DS Building Permit
05/30/2023 Receipt Receipt for transaction:2023-003737
05/30/2023 LOT 73 FINAL
05/30/2023 Approved Plans approved plot plan
10/17/2023 Letter Codes 140 Day Letter
10/18/2023 OS #73 - Permit Extension App
02/15/2024 Engineer Report/Study 3rd Party Footing Inspection Report 2-14-24
02/15/2024 Letter INSPECTION SUMMARY
02/15/2024 Letter INSPECTION SUMMARY
02/15/2024 Letter Codes 140 Day Letter
02/27/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
04/01/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/12/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
06/10/2024 LOT 73 ASBUILT
06/10/2024 Plot Plan approved as graded plot plan
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/14/2024 Receipt Receipt for transaction:2024-004758
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/14/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter Codes Final Certificate of Occupancy
06/25/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home