Permit Application Status

PRRES20222881


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20222881
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. ENGINEERED FLOOR SYSTEM -DEFERRED.
06/23/2022
07/12/2022
08/14/2023
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Erin Skinner, Address:1314 SW Market Street  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
PERMITTING@JFECONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 07/12/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 07/12/2022
Water Meter Fee $479.24 $479.24 Paid 07/12/2022
Right of Way Permit Fee $85.00 $85.00 Paid 07/12/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/12/2022
Valuation Fee New Single Family $1,872.35 $1,872.35 Paid 07/12/2022
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 8/25/2022 8/25/2022 08/25/2022
Footing Inspection - Residential Passed 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
FOOTING APPROVED BY DAVID AINSWORTH ON 8/8/22
Sewer Service Inspection - R Passed 9/13/2022 (8:30) 9/13/2022 09/13/2022
Water Service Inspection - R Failed 9/22/2022 (9:30) 9/22/2022 09/22/2022
Miscellaneous Correction
Corrective Action Required
09/22/2022
PROVIDE 10' COPPER LINE FROM METER TO PEX CONNECTION AT FOUNDATION
Water Service Inspection - R Passed 9/23/2022 (10:45) 9/23/2022 09/23/2022
Miscellaneous Correction
Corrective Action Required
09/22/2022
PROVIDE 10' COPPER LINE FROM METER TO PEX CONNECTION AT FOUNDATION
Piers/Caissons Inspection - Residential Passed 10/7/2022 10/07/2022
Misc
Informational
10/07/2022
3RD PARTY DECK PIERS BY BOB ROWE @ VAN DEURZEN AND ASSOCIATES (3) 24" PIERS, BASEMENT & GARAGE SLABS SEE ATTACHED LETTER
All Rough Inspection - Residential Failed 2/3/2023 2/3/2023 02/03/2023
Misc
Corrective Action Required
02/03/2023
- Provide anchor bolt garage sill plate near entry closet - Address valley rafter in mud room over notched - Fb seal gaps vertical to horizontal at top of offset dining room exterior wall - Bathroom vent ductwork to be 4” , 3” not allowed - Missing office window - Fb top of chase, wedge near stairs main floor - Security blocking basement door
Electrical Service Inspection Passed 2/3/2023 2/3/2023 02/03/2023
Gas Service Inspection - Residential Passed 2/3/2023 2/3/2023 02/03/2023
All Rough Inspection - Residential Failed 2/9/2023 2/9/2023 02/09/2023
Misc
Corrective Action Required
02/03/2023
- Address valley rafter in mud room over notched reschedule when engineers letter is uploaded. OK to insulate
All Rough Inspection - Residential Passed 2/23/2023 2/23/2023 02/23/2023
Misc
Resolved
02/23/2023
- Address valley rafter in mud room over notched reschedule when engineers letter is uploaded. OK to insulate
Driveway Inspection Failed 3/22/2023 3/22/2023 03/22/2023
Misc
Corrective Action Required
03/22/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out.
Sidewalk Inspection Failed 3/22/2023 3/22/2023 03/22/2023
Misc
Corrective Action Required
03/22/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out.
Sidewalk Inspection Failed 3/24/2023 3/24/2023 03/24/2023
Misc
Corrective Action Required
03/22/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS Adjust forms to ensure required 4" depth concrete on sidewalk. 4" clean aggregate required. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin.
Driveway Inspection Failed 3/24/2023 3/24/2023 03/24/2023
Misc
Corrective Action Required
03/22/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS 4" clean aggregate required on driveway. Make sure all aggregate compacted, clean and dry. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin.
Sidewalk Inspection Partial 3/28/2023 3/28/2023 03/28/2023
Misc
Corrective Action Required
03/24/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS Adjust forms to ensure required 4" depth concrete on sidewalk. 4" clean aggregate required. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DP SW Not formed all of the way. fail
Driveway Inspection Failed 3/28/2023 3/28/2023 03/28/2023
Misc
Corrective Action Required
03/24/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS 4" clean aggregate required on driveway. Make sure all aggregate compacted, clean and dry. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DW has standing water and over half of the DW has less than 1" of rock before mud. We need it to dry out and subgrade needs to be cut down to allow 4" of rock and 6" of concrete.
Driveway Inspection Partial 3/29/2023 3/29/2023 03/29/2023
Misc
Corrective Action Required
03/28/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS 4" clean aggregate required on driveway. Make sure all aggregate compacted, clean and dry. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DW has standing water and over half of the DW has less than 1" of rock before mud. We need it to dry out and subgrade needs to be cut down to allow 4" of rock and 6" of concrete.
Misc
Informational
03/29/2023
3-29-23 DP. DW is formed, aggregate is compacted, need to maintain 2% ADA requirement throughout driveway. Approved to pour
Sidewalk Inspection Partial 3/29/2023 3/29/2023 03/29/2023
Misc
Corrective Action Required
03/28/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS Adjust forms to ensure required 4" depth concrete on sidewalk. 4" clean aggregate required. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DP SW Not formed all of the way. fail
Misc
Informational
03/29/2023
3-29-23 DP. SW is formed, aggregate is compacted, cross slope is in compliance but conditions can change. Approved to pour
Sidewalk Inspection Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Corrective Action Required
03/29/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS Adjust forms to ensure required 4" depth concrete on sidewalk. 4" clean aggregate required. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DP SW Not formed all of the way. fail
Misc
Informational
03/29/2023
3-29-23 DP. SW is formed, aggregate is compacted, cross slope is in compliance but conditions can change. Approved to pour 4-4-23 DP. Sw was poured, cross slopes are in compliance and forms were removed. passed.
Driveway Inspection Failed 4/4/2023 4/4/2023 04/04/2023
Misc
Corrective Action Required
03/29/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS 4" clean aggregate required on driveway. Make sure all aggregate compacted, clean and dry. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DW has standing water and over half of the DW has less than 1" of rock before mud. We need it to dry out and subgrade needs to be cut down to allow 4" of rock and 6" of concrete.
Misc
Informational
03/29/2023
3-29-23 DP. DW is formed, aggregate is compacted, need to maintain 2% ADA requirement throughout driveway. Approved to pour
Miscellaneous Correction
Corrective Action Required
04/04/2023
4-4-23 DP. DW was 2 long cracks in a section. That section needs to be replaced and re-poured. Failed.
Driveway Inspection Passed 4/26/2023 4/26/2023 04/26/2023
Misc
Corrective Action Required
04/04/2023
3-22-23 DP. SW and DW was formed and aggregate was placed, there wasn't enough aggregate in DW and both DW and SW had saturated areas, please call back in for reinspection when it dries out. 3-24-23 PS 4" clean aggregate required on driveway. Make sure all aggregate compacted, clean and dry. Correct issues and schedule reinspection before pouring. Have all coverings removed at reinspection. Remaining issues discussed with Kevin. 3-28-23 DW has standing water and over half of the DW has less than 1" of rock before mud. We need it to dry out and subgrade needs to be cut down to allow 4" of rock and 6" of concrete.
Misc
Informational
04/04/2023
3-29-23 DP. DW is formed, aggregate is compacted, need to maintain 2% ADA requirement throughout driveway. Approved to pour
Miscellaneous Correction
Corrective Action Required
04/04/2023
4-4-23 DP. DW was 2 long cracks in a section. That section needs to be replaced and re-poured. Failed.
Misc
Informational
04/26/2023
4-26-23 DP. Driveway section was repoured and is in compliance with no cracks. Passed.
Plot Plan Inspection Passed 7/26/2023 7/26/2023 07/26/2023
Occupancy Inspection - Codes Residential Failed 7/26/2023 7/26/2023 07/26/2023
Misc
Corrective Action Required
07/26/2023
-sod -address broken water meter lid -water meter well ring and lid to be to grade Ensure 14”-18” from top of meter to well lid ring -spark rings as required at kitchen outlets. -security screws at basement patio door 2per hinge and strike plate.
Occupancy Inspection - Codes Residential Failed 7/26/2023 7/26/2023 07/26/2023
Misc
Corrective Action Required
07/26/2023
-sod -address broken water meter lid -water meter well ring and lid to be to grade Ensure 14”-18” from top of meter to well lid ring -spark rings as required at kitchen outlets. -security screws at basement patio door 2per hinge and strike plate. -provide issued lawn irrigation permit.
Erosion Control Inspection Residential Passed 08/14/2023
Occupancy Inspection - Codes Residential Full C of O 8/14/2023 8/14/2023 08/14/2023
Misc
Resolved
08/14/2023
-sod -address broken water meter lid -water meter well ring and lid to be to grade Ensure 14”-18” from top of meter to well lid ring -spark rings as required at kitchen outlets. -security screws at basement patio door 2per hinge and strike plate. -provide issued lawn irrigation permit.
Documents & Images
Date Uploaded File Type Document Name
06/23/2022 WR161 Permit Ap
06/23/2022 WR161 Tax App
06/23/2022 WR161 Tax Permit
06/28/2022 Permit Codes Residential Plan Review
07/01/2022 Plot Plan APPROVED PLOT PLAN
07/01/2022 Approved Plans APPROVED PLANS
07/12/2022 Permit DS Building Permit
07/12/2022 Receipt Receipt for transaction:2022-005670
08/09/2022 Wilmoth 370 NW Patch Ct LSMO Lot 161 Woodside Rdige JFE 3rd Party Subgrade and Footing Inspection Report 8-8-22
08/25/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/22/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
10/06/2022 370 NW Patch Ct_ALL SLAB & DECK PIER INSP_2022-10-05
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
01/17/2023 Approved Plans APPROVED JOIST DRAWINGS
02/03/2023 Letter INSPECTION SUMMARY
02/03/2023 Letter INSPECTION SUMMARY
02/03/2023 Letter INSPECTION SUMMARY
02/09/2023 Letter INSPECTION SUMMARY
02/22/2023 370 NW Patch_Framing Evaluation Report_2-22-23
02/23/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
03/28/2023 Letter INSPECTION SUMMARY
03/28/2023 Letter INSPECTION SUMMARY
03/29/2023 Letter INSPECTION SUMMARY
03/29/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter Codes Final Certificate of Occupancy
08/14/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home