Summary
PRRES20221353
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 04/21/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 05/19/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 05/27/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 09/09/2022 12:00 AM by username 'Ryan Heckman'. STOP WORK ORDER generated on 08/23/2023 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 09/05/2023 12:00 AM by username 'Mitchell Schwarz'.
04/07/2022
04/18/2022
10/04/2022
06/18/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Nick Zvacek, Address:1009 Industrial Drive, Phone:(816) 325-3440  
LEAH@ZVACEKCONSTRUCTION.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 04/18/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/18/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 04/18/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 04/18/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 04/18/2022
9110078-Valuation Fee New Single Family $1,375.49 $1,375.49 Paid 04/18/2022
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/20/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/20/2023
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 12/20/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/20/2023
Outstanding Fees Amount Paid Owing Date Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 4/21/2022 04/21/2022
Misc
Corrective Action Required
04/21/2022
third party footing inspection denied no erosion control in place. stop work order issued Mitchell Schwarz 04/21/2022 2:35 PM
Footing Inspection - Residential Failed 4/22/2022 (8:15) 4/22/2022 04/22/2022
Misc
Resolved
04/22/2022
third party footing inspection denied no erosion control in place. stop work order issued Mitchell Schwarz 04/21/2022 2:35 PM
Misc
Corrective Action Required
04/22/2022
third party inspection denied ufer ground rod not located where stated in report erosion control now in compliance Mitchell Schwarz 04/22/2022 9:26 AM
Underslab Plumbing Inspection - Residential Failed 5/13/2022 5/13/2022 05/13/2022
Miscellaneous Correction
Corrective Action Required
05/13/2022
No site location posted
Water Service Inspection - R Partial 5/19/2022 (9:00) 5/19/2022 05/19/2022
Misc
Informational
05/19/2022
pex ran roughly 20' from foundation
Footing Inspection - Residential Passed 5/19/2022 05/19/2022
Misc
Resolved
05/19/2022
third party inspection denied ufer ground rod not located where stated in report erosion control now in compliance Mitchell Schwarz 04/22/2022 9:26 AM
Sewer Service Inspection - R Passed 5/19/2022 (9:00) 5/19/2022 05/19/2022
Water Service Inspection - R Passed 5/20/2022 05/20/2022
Misc
Resolved
05/20/2022
pex ran roughly 20' from foundation
Erosion Control Inspection Residential Failed 5/24/2022 05/24/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/24/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 5/24/22
Underslab Plumbing Inspection - Residential Passed 5/24/2022 5/24/2022 05/24/2022
Miscellaneous Correction
Resolved
05/24/2022
No site location posted
Erosion Control Inspection Residential Failed - Stop Work 5/27/2022 5/27/2022 05/27/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/24/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 5/24/22
Misc
Corrective Action Required
05/27/2022
Erosion control not in compliance
Driveway Inspection Not Ready 9/7/2022 9/7/2022 09/07/2022
Misc
Informational
09/07/2022
9-7-22 RH. Driveway was not ready when first arrived on site.
Driveway Inspection Partial 9/9/2022 9/9/2022 09/09/2022
Misc
Informational
09/07/2022
9-7-22 RH. Driveway was not ready when first arrived on site. 9-9-22 RH. Driveway is formed up and aggregate was placed and compacted.
Sidewalk Inspection Partial 9/12/2022 9/12/2022 09/12/2022
Misc
Informational
09/12/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Driveway Inspection Passed 9/16/2022 9/16/2022 09/16/2022
Misc
Informational
09/09/2022
9-7-22 RH. Driveway was not ready when first arrived on site. 9-9-22 RH. Driveway is formed up and aggregate was placed and compacted. 9-16-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 10/10/2022 10/10/2022 10/10/2022
Misc
Informational
10/10/2022
10-3-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 10-10-22 RH. Sidewalk meets LS and ADA specification.
Gas Service Inspection - Residential Passed 11/11/2022 11/11/2022
Electrical Service Inspection Passed 11/11/2022 11/11/2022
All Rough Inspection - Residential Failed 11/11/2022 11/11/2022
Misc
Corrective Action Required
11/11/2022
provide set of CITY STAMPED plans on site for inspection.
All Rough Inspection - Residential Failed 11/16/2022 11/16/2022
Misc
Resolved
11/16/2022
provide set of CITY STAMPED plans on site for inspection.
Misc
Corrective Action Required
11/16/2022
-nail all exterior sheathing to code -complete pfh nailing at garage exterior -nail pfh straps at garage -furr out R/a in garage for insulation -seal penetrations into furr down garage W wall -pan R/a to 2nd floor in joist space garage entry/stairs -complete bath fans throughout -address header cut at pantry for dwv -missing nails in multiple hangers above kitchen -nail triple lvl together both sides -missing hangers above stairwell and great room -seal around outlet in R/a in master bedroom -seal bottom plate penetration in this area -nail all exterior wall corners to code -solid block sheathing break in master bath closet -missing nails in stud shoe in master -missing nails in hanger 2nd floor -furr out for dwv in bed 2 bath -move hvac from attic access 2nd floor -address rafter not landing on top plate 2nd floor -address rafter to ceiling joist connections 2nd floor -fire block basement bath wall into furr down -fireblock beam ends in basement -seal penetrations in vertical to horizontal fireblocking -when using Unfaced insulation for fireblocking it must be packed tightly and securely (check throughout) -seal furr down ends in basement -all anchor bolts to be in the middle 1/3 of sill plate -all anchor bolts to be tight -complete R/a in basement
All Rough Inspection - Residential Failed 12/13/2022 12/13/2022 12/13/2022
Misc
Corrective Action Required
11/16/2022
-seal penetrations into furr down garage W wall (missing spot) -address header cut at pantry for dwv -missing nails in multiple hangers above kitchen (not done) -missing nails in stud shoe in master bath -furr out for dwv in bed 2 bath -address rafter not landing on top plate 2nd floor (provide engineering for fix) -address rafter to ceiling joist connections 2nd floor -seal penetrations in vertical to horizontal fireblocking
All Rough Inspection - Residential Not Ready 12/30/2022 12/30/2022 12/30/2022
Misc
Corrective Action Required
12/13/2022
-seal penetrations into furr down garage W wall (missing spot)(left of dryer vent when looking from garage) -address header cut at pantry for dwv (missing King Stud) -missing nails in multiple hangers above kitchen (not done)(see double 2x10) -missing nails in stud shoe in master bath -furr out for dwv in bed 2 bath -address rafter not landing on top plate 2nd floor (provide engineering for fix) -seal penetrations in vertical to horizontal fireblocking
All Rough Inspection - Residential Failed 1/10/2023 1/10/2023 01/10/2023
Misc
Corrective Action Required
12/30/2022
-furr out for dwv in bed 2 bath (see ceiling line) Okay to insulate
All Rough Inspection - Residential Not Ready 1/13/2023 1/13/2023 01/13/2023
Misc
Corrective Action Required
01/10/2023
-furr out for dwv in bed 2 bath (see ceiling line) Fireblock as well Okay to insulate
All Rough Inspection - Residential Passed 1/17/2023 1/17/2023 01/17/2023
Misc
Resolved
01/17/2023
-furr out for dwv in bed 2 bath (see ceiling line) Fireblock as well Okay to insulate
Erosion Control Inspection Residential Failed 7/17/2023 07/17/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
07/17/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 5/24/22
Misc
Resolved
07/17/2023
Erosion control not in compliance
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain overgrown vegetation
Erosion Control Inspection Residential Failed 8/18/2023 08/18/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain overgrown vegetation and erosion control
Erosion Control Inspection Residential Failed - Stop Work 8/23/2023 8/23/2023 08/23/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/18/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain overgrown vegetation and erosion control
Misc
Corrective Action Required
08/23/2023
Erosion control still not in compliance. Stop work issued. -maintain overgrown vegetation -maintain silt fence Mitchell Schwarz 08/23/2023 10:57 AM
Erosion Control Inspection Residential Failed - Stop Work 8/30/2023 08/30/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/23/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain overgrown vegetation and erosion control
Misc
Corrective Action Required
08/23/2023
Erosion control still not in compliance. Stop work issued. -maintain overgrown vegetation -maintain silt fence Mitchell Schwarz 08/23/2023 10:57 AM Erosion control still not in compliance. Called no answer.
Erosion Control Inspection Residential Partial 9/5/2023 9/5/2023 09/05/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
09/05/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain overgrown vegetation and erosion control
Misc
Resolved
09/05/2023
Erosion control still not in compliance. Stop work issued. -maintain overgrown vegetation -maintain silt fence Mitchell Schwarz 08/23/2023 10:57 AM Erosion control still not in compliance. Called no answer.
Misc
Informational
09/05/2023
Erosion control back in compliance at time of inspection.
Occupancy Inspection - Codes Residential Failed 12/13/2023 12/13/2023 12/13/2023
Misc
Corrective Action Required
12/13/2023
-Remove covers for smokes -Adjust self closing hinges at garage door -Break off screw at anti siphon device at main water shutoff -Missing 1/2" through bolts at post to beam connection at deck -Missing splash pads -Missing sump pump extension -No sod installed -Missing tamper proof caps at A/C
Occupancy Inspection - Codes Residential Failed 12/19/2023 12/19/2023 12/19/2023
Misc
Partial Correction
12/19/2023
PAY ALL FEES ADDRESS PIER INSPECTION OBTAIN ISSUED LAWN IRRIGATION PERMIT -Break off screw at anti siphon device at main water shutoff -No sod installed
Plot Plan Inspection Passed 12/20/2023
Piers/Caissons Inspection - Residential Passed 12/20/2023
Occupancy Inspection - Codes Residential Failed 12/20/2023 12/20/2023 12/21/2023
Misc
Partial Correction
12/19/2023
-No sod installed -Must maintain erosion control -Install guardrail at right side of front porch
Occupancy Inspection - Codes Residential Full C of O 06/18/2024
Misc
Partial Correction
12/20/2023
-No sod installed
Documents & Images
Date Uploaded File Type Document Name
04/14/2022 Application Form CCF_000343
04/26/2022 M L Crose 3214 SW Enoch St LSMO Summit View Farms Lot 108 Foundation footing Inspection Report 4-19-22 Revised to Correct Ufer Location
05/27/2022 Letter Stop Work Order
05/27/2022 Letter Stop Work Order
09/07/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
11/11/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/10/2023 Letter INSPECTION SUMMARY
01/13/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
08/30/2023 Letter Stop Work Order
09/05/2023 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
12/20/2023 Receipt Receipt for transaction: 2023-009212
05/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/09/2024 Letter Codes 140 Day Letter
06/18/2024 Letter Field Certificate of Occupancy
06/18/2024 Letter Codes Final Certificate of Occupancy
05/13/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter Stop Work Order
04/20/2022 M L Crose 3214 SW Enoch St LSMO Summit View Farms Lot 108 Foundation footing Inspection Report 4-19-22
04/18/2022 Receipt Receipt for transaction:2022-002146
04/18/2022 Permit DS Building Permit
04/14/2022 Permit Codes Residential Plan Review
04/14/2022 Plot Plan APPROVED PLOT PLAN
04/07/2022 Permit Codes Residential Plan Review
04/07/2022 Approved Plans APPROVED PLANS
01/03/2023 3214 Enoch eng rep
09/12/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
08/23/2023 Letter Stop Work Order
08/18/2023 Letter INSPECTION SUMMARY
11/16/2022 Letter INSPECTION SUMMARY
12/13/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home