Permit Application Status

PRRES20220350


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220350
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
01/26/2022
02/09/2022
07/27/2022
04/29/2024
Locations
Contacts
ASPEN HOME BUILDERS LLC, Address:6618 ROYAL ST #B, Phone:(816) 507-0123  
Steve Gilliland, Address:6618 Royal Street  
MCDANIEL FURNACE & SHEET METAL, Address:2905 S M 291 FRONTAGE RD, Phone:(816) 373-6370  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
N & E Plumbing LLC, Address:17301 Jennifer St.  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 02/09/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/09/2022
8331507-Sewer Connection Fee $600.00 $600.00 Paid 02/09/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 02/09/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 02/09/2022
9110078-Valuation Fee New Single Family $1,616.51 $1,616.51 Paid 02/09/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/30/2022 (2:30) 3/30/2022 03/30/2022
Misc
Informational
03/30/2022
UFER LOCATED EAST FOUNDATION WALL NEAR REAR GARAGE WALL
Sewer Service Inspection - R Passed 6/7/2022 (9:30) 6/7/2022 06/07/2022
Water Service Inspection - R Passed 6/8/2022 (4:00) 6/8/2022 06/08/2022
Underslab Plumbing Inspection - Residential Passed 7/22/2022 7/22/2022 07/22/2022
Piers/Caissons Inspection - Residential Failed 6/6/2023 (8:30) 6/6/2023 06/06/2023
Misc
Corrective Action Required
06/06/2023
Inspected (2) 24” piers. Piers are not to plans revise plans, or fix to plans
Miscellaneous Inspection Passed 6/7/2023 06/07/2023
Misc
Informational
06/07/2023
house being framed permit extened. house to be inspected in july for all rough per extension request letter.
Erosion Control Inspection Residential Failed 6/28/2023 6/28/2023 06/28/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/28/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 7/20/2023 07/20/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/28/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain silt fence and overgrown vegetation
Piers/Caissons Inspection - Residential Passed 8/21/2023 (9:45) 8/21/2023 08/21/2023
Misc
Resolved
08/21/2023
Inspected (2) 24” piers. Piers are not to plans revise plans, or fix to plans
All Rough Inspection - Residential Failed 9/5/2023 9/5/2023 09/05/2023
Misc
Corrective Action Required
09/05/2023
Garage portal frame only. Replace sheathing with cuts in it W side of garage portal frame.
Piers/Caissons Inspection - Residential Passed 9/28/2023 09/28/2023
Electrical Service Inspection Passed 11/9/2023 11/9/2023 11/09/2023
Gas Service Inspection - Residential Passed 11/9/2023 11/9/2023 11/09/2023
All Rough Inspection - Residential Failed 11/9/2023 11/9/2023 11/09/2023
Misc
Resolved
11/09/2023
Misc
Corrective Action Required
11/09/2023
- Needs attic access in garage -Need vent in same area -Secure NM in garage chase -Fire stop garage chase DWV -Secure hip and valley in garage attic space -Need 75 percent bearing at rafter at small garage door -Welding certificate for garage beams -Fire stop at laundry top plate next to garage chase -Need solid blocking between laundry and breakfast area top plate at load bearing wall -Support cut joist over kitchen -Protect NM at pantry and mud room -Solid fire block left side of return air chase -Block air return master bedroom -Fire block upstairs return air chase -Support valley and rafters at 2nd floor front bathroom -Install lateral support at ends of ceiling at side bedroom -Missing nails at hanger at stairs to basement -Address notched floor joist in basement at -DWV under master bathroom -Secure DWV every 4ft -Support DWV from furnace every 4ft
All Rough Inspection - Residential Failed 11/13/2023 11/13/2023 11/13/2023
Misc
Corrective Action Required
11/09/2023
-Welding certificate for garage beams OK to insulate
Driveway Inspection Partial 12/18/2023 12/18/2023 12/18/2023
Misc
Informational
12/18/2023
12-18-23 Dustin A, Dw is formed and aggregate is compacted. Approved to pour.
Sidewalk Inspection Partial 12/18/2023 12/18/2023 12/18/2023
Misc
Corrective Action Required
12/18/2023
12-18-23 Dustin A, SW is formed and aggregate is compacted. Slopes are in compliance . Approved to pour SW on west side of dw. Sw on east cannot be poured due to AtnT box in SW. Builder will need to contact developer to have it moved.
Driveway Inspection Passed 12/27/2023 12/27/2023 12/27/2023
Misc
Informational
12/18/2023
12-18-23 Dustin A, Dw is formed and aggregate is compacted. Approved to pour. 12-27-23 Dustin A, DW is poured, forms are pulled. Slopes are in compliance. Passed
Sidewalk Inspection Partial 12/27/2023 12/27/2023 12/27/2023
Misc
Corrective Action Required
12/27/2023
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added
Sidewalk Inspection Partial 1/4/2024 1/4/2024 01/04/2024
Misc
Corrective Action Required
12/27/2023
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added 1-4-24 Dustin A, conditions have not changed. reminder atnt box will need to be moved
Sidewalk Inspection Partial 1/30/2024 1/30/2024 01/25/2024
Misc
Corrective Action Required
01/04/2024
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added 1-4-24 Dustin A, conditions have not changed. reminder atnt box will need to be moved 1-25-24 Dustin A, cure added 2-1-24 Dustin A, Box still has not been moved. Will need relocated before pour
Sidewalk Inspection Partial 2/14/2024 2/14/2024 02/01/2024
Misc
Corrective Action Required
01/25/2024
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added 1-4-24 Dustin A, conditions have not changed. reminder atnt box will need to be moved 1-25-24 Dustin A, cure added 2-1-24 Dustin A, box still needs to be moved before pour
Erosion Control Inspection Residential Failed 2/6/2024 02/06/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
02/06/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain silt fence and overgrown vegetation
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/06/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. No erosion control installed
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/06/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Passed 2/9/2024 2/9/2024 02/09/2024
Misc
Resolved
02/09/2024
-Welding certificate for garage beams OK to insulate
Sidewalk Inspection Failed 2/21/2024 2/21/2024 02/20/2024
Misc
Corrective Action Required
02/01/2024
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added 1-4-24 Dustin A, conditions have not changed. reminder atnt box will need to be moved 1-25-24 Dustin A, cure added 2-1-24 Dustin A, box still needs to be moved before pour 2-20-24 Dustin A, box has been moved. Missing sections have been poured. White cure was not applied correctly per city specs
Sidewalk Inspection Passed 2/22/2024 02/29/2024
Misc
Corrective Action Required
02/20/2024
12-27-23 Dustin A, Part of sw is poured. will need rest as well as white cure added 1-4-24 Dustin A, conditions have not changed. reminder atnt box will need to be moved 1-25-24 Dustin A, cure added 2-1-24 Dustin A, box still needs to be moved before pour 2-20-24 Dustin A, box has been moved. Missing sections have been poured. White cure was not applied correctly per city specs 2-22-24 Dustin A, Inspection was called in. Previous problem has not been addressed. Talked with Bob ( contractor) and he understands what needs to be done. Will call when its fixed 2-29-24 Dustin A, SW has been recured. Passed
Plot Plan Inspection Passed 4/16/2024 04/16/2024
Occupancy Inspection - Codes Residential Failed 4/16/2024 4/16/2024 04/16/2024
Misc
Corrective Action Required
04/16/2024
-address to be properly illuminated -water meter to grade and meter to be 14”-18” from top of meter to well ring lid -spark ring at outlet above fireplace -handrail height in garage (311.7.8.1 Height. Handrail height, measured verti- cally from the sloped plane adjoining the tread nosing, or finish surface of ramp slope, shall be not less than 34 inches (864 mm) and not more than 38 inches (965 mm).) -provide arc fault breakers where required and missing -provide lock outlets for all hardwired appliances where required -attic access is obstructed and not readily accessible in 2nd floor closet -address deck post to beam connections
Erosion Control Inspection Residential Passed 04/29/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/29/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. No erosion control installed
DCM3 ESC REQUIRED 2 DAY
Resolved
04/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Full C of O 4/29/2024 4/29/2024 04/29/2024
Misc
Resolved
04/29/2024
-address to be properly illuminated -water meter to grade and meter to be 14”-18” from top of meter to well ring lid -spark ring at outlet above fireplace -handrail height in garage (311.7.8.1 Height. Handrail height, measured verti- cally from the sloped plane adjoining the tread nosing, or finish surface of ramp slope, shall be not less than 34 inches (864 mm) and not more than 38 inches (965 mm).) -provide arc fault breakers where required and missing -provide lock outlets for all hardwired appliances where required -attic access is obstructed and not readily accessible in 2nd floor closet -address deck post to beam connections
Documents & Images
Date Uploaded File Type Document Name
01/26/2022 Permit app Lot 65 HF
01/26/2022 Lot 65 HF Sequoia Farm
01/26/2022 Tax app Lot 65 HF
01/28/2022 Plot Plan Approved Plot Plan
01/28/2022 Permit Codes Residential Plan Review
02/07/2022 Approved Plans Approved Drawings
02/07/2022 Permit Codes Residential Plan Review
02/09/2022 Permit DS Building Permit
02/09/2022 Receipt Receipt for transaction:2022-000704
03/30/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter Codes 140 Day Letter
01/18/2023 Letter Codes 180 Day Letter
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Extension Request
06/06/2023 Extension Request 2
06/07/2023 Letter INSPECTION SUMMARY
06/28/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/28/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/13/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
01/04/2024 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
02/01/2024 Letter INSPECTION SUMMARY
02/01/2024 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter WELDING REPORT
02/08/2024 Letter WELDING REPORT
02/09/2024 Letter INSPECTION SUMMARY
02/20/2024 Letter INSPECTION SUMMARY
02/20/2024 Letter INSPECTION SUMMARY
02/22/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter Field Certificate of Occupancy
04/29/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home