Permit Application Status

PRRES20220181


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220181
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES.
01/14/2022
01/26/2022
04/12/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
AJ@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 01/26/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 01/26/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 01/26/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/26/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/26/2022
9110078-Valuation Fee New Single Family $1,350.71 $1,350.71 Paid 01/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
04/08/2022
APPROVED PER BRADLEY HUXOL 3/9/22
Underslab Plumbing Inspection - Residential Passed 4/12/2022 4/12/2022 04/12/2022
Sewer Service Inspection - R Passed 6/9/2022 (11:30) 6/9/2022 06/09/2022
Water Service Inspection - R Passed 6/10/2022 (10:15) 6/10/2022 06/10/2022
Electrical Service Inspection Passed 8/4/2022 8/4/2022 08/04/2022
Gas Service Inspection - Residential Failed 8/4/2022 8/4/2022 08/04/2022
Misc
Corrective Action Required
08/04/2022
COMPLETE GAS LINE INSTALL AT FIREPLACE, PRESSURE TEST AFTER INSTALL COMPLETE
All Rough Inspection - Residential Failed 8/4/2022 8/4/2022 08/04/2022
Misc
Corrective Action Required
08/04/2022
-anchor bolts within 12” of plate break garage -fireblock HVAC plumbing fur out garage wall -top plate corner lap connection garage wall -min 24” offset between dbl top plate breaks - see garage -seal penetrations garage wall -provide joist hangers at joist to stair rim connection garage entry where bearing less than 1 1/2” on top plate -fireblock HVAC chase at garage entry -provide bocca protection plate top plate laundry, seal plumbing plate penetration -fireblock tub trap master bath -complete gas line install fireplace -secure gas line fireplace -protect gas line fireplace casing entry -fireblock fireplace -address top plate corner lap connection at great room and dining/master bed walls, walls not tied together -address dbl girder truss at dining by room bearing on 2x4 blocks above top plate, proper bearing, uplift resistance and lateral restraint -cannot inspect covered patio framing with lid installed -provide bocca protection plate at top plate kitchen -(4) 2X stud pack all girder truss ends per plans -3” SCH 40 steel column at w14x26 beam garage per plans, wall over 8’ -CS-PF portal bracing at great room and dining room exterior walls per plans -support ridge both ends at covered porch -address rafters on blocks above top plate at covered porch -all truss hangers per plans -all truss lateral bracing per plans -provide bocca plate top plate vanity bath 2nd floor -provide full bearing for dbl girder truss bed#3 -solid block all sheathing breaks -top plate corner lap at bed#2 -12” oc nailing all intersecting corners -provide access to attic space above kitchen and great room -fireblock HVAC chase at 2nd floor hall, open to attic space above -provide bocca protection plate top plate bed#2 -provide joist hanger at cut joist above furnace at header -solid block between joists every 48” oc at kitchen island per plans -nail all exterior sheathing per plans
All Rough Inspection - Residential Failed 8/18/2022 8/18/2022 08/18/2022
Misc
Corrective Action Required
08/04/2022
-fireblock HVAC plumbing fur out garage wall, annual space too large for loose insulation per code insulation would need to be 16” deep, packed tight with support -top plate corner lap connection garage wall, see East wall -min 24” offset between dbl top plate breaks - see garage -3” SCH 40 steel column at w14x26 beam garage per plans, wall over 8’ , not done -CS-PF portal bracing at great room and dining room exterior walls per plans, nail exterior sheathing per plans, breaks in sheathing not within middle 24” of portal legs, tension straps not located per design -support ridge both ends at covered porch, not done -address rafters on blocks above top plate at covered porch, repair per engineer letter -all truss hangers per plans -all truss lateral bracing per plans -top plate corner lap at bed#2 -12” oc nailing all intersecting corners -nail all exterior sheathing per plans
All Rough Inspection - Residential Passed 8/26/2022 8/26/2022 08/26/2022
Misc
Resolved
08/26/2022
Gas Service Inspection - Residential Passed 10/21/2022 10/21/2022 10/21/2022
Misc
Resolved
10/21/2022
Driveway Inspection Partial 12/1/2022 12/01/2022
Misc
Informational
12/01/2022
12-1-22 RH. Driveway is formed up and aggregate is placed and compacted. Blankets for concrete is on site. Approved to pour.
Driveway Inspection Passed 12/8/2022 12/8/2022 12/08/2022
Misc
Informational
12/01/2022
12-1-22 RH. Driveway is formed up and aggregate is placed and compacted. Blankets for concrete is on site. Approved to pour. 12-8-22 RH. Driveway meets LS and ADA specification.
Piers/Caissons Inspection - Residential Passed 1/18/2023 01/18/2023
Occupancy Inspection - Codes Residential Failed 1/18/2023 1/18/2023 01/18/2023
Misc
Corrective Action Required
01/18/2023
MAINTAIN EROSION CONTROL -final grade and sod -check water meter at time of final grade and sod -outlet at counter top left of fireplace -open junction box right of cook top -bath fan switch in master -open junction box’s above 2nd floor bedrooms -ensure basement stairs meet code R311.7.2 for headroom -anti syphon device at basement water spigot -open electrical at entry bath
Occupancy Inspection - Codes Residential Failed 1/18/2023 01/18/2023
Misc
Corrective Action Required
01/18/2023
MAINTAIN EROSION CONTROL -final grade and sod -gutters, downspouts and sump pump discharge to extend 36" from foundation -check water meter at time of final grade and sod -outlet at counter top left of fireplace -open junction box right of cook top -bath fan switch in master -open junction box’s above 2nd floor bedrooms -ensure basement stairs meet code R311.7.2 for headroom -anti syphon device at basement water spigot -open electrical at entry bath
Occupancy Inspection - Codes Residential Failed 4/7/2023 4/7/2023 04/07/2023
Misc
Corrective Action Required
01/18/2023
-outside a/c whip needs to be attached to the wall -permit is required for the water sprinkler system that is already installed
Erosion Control Inspection Residential Passed 4/12/2023 04/12/2023
Plot Plan Inspection Passed 4/12/2023 04/12/2023
Occupancy Inspection - Codes Residential Full C of O 4/12/2023 4/12/2023 04/12/2023
Misc
Resolved
04/12/2023
-outside a/c whip needs to be attached to the wall -permit is required for the water sprinkler system that is already installed
Documents & Images
Date Uploaded File Type Document Name
01/14/2022 LOT 104 FINAL 1-7-22
01/20/2022 Approved Plans APPROVED DRAWINGS
01/20/2022 Approved Plans APPROVED TRUSS LAYOUT
01/20/2022 Approved Plans APPROVED TRUSS PACKAGE
01/21/2022 Permit Codes Residential Plan Review
01/24/2022 Plot Plan APPROVED PLOT PLAN
01/26/2022 Permit DS Building Permit
01/26/2022 Receipt Receipt for transaction:2022-000442
04/07/2022 104 Reserve at Stoney Creek FDTN
04/07/2022 104 Reserve at Stoney Creek footing
04/08/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/17/2022 104 Reserve at Stoney Creek Letter
08/18/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter Field Certificate of Occupancy
04/12/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home