Permit Application Status

PRRES20220128


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220128
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
01/11/2022
01/19/2022
07/10/2022
10/04/2023
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
ASHLEY@NEWMARKHOMESKC.COM  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 01/19/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/19/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/19/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 01/19/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 01/19/2022
9110078-Valuation Fee New Single Family $1,502.36 $1,502.36 Paid 01/19/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 5/5/2022 05/05/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/05/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE SILT FENCE SOUTH SIDE MAINTAIN SILT FENCE
Erosion Control Inspection Residential Failed 5/10/2022 05/10/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/05/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE SILT FENCE SOUTH SIDE MAINTAIN SILT FENCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/10/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE SILT FENCE SOUTH SIDE OF LOT CLEAN STREET
Footing Inspection - Residential Failed 5/10/2022 05/10/2022
Miscellaneous Correction
Corrective Action Required
05/10/2022
INSPECTION DENIED NO SILT FENCE ON SOUTH SIDE OF LOT CALLED CRAIG ABOUT INSTALLING SILT FENCE ON SOUTH & MAINTAINING SILT FENCE ON AMBERSHAM
Erosion Control Inspection Residential Passed 5/13/2022 05/13/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
05/13/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Resolved
05/13/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE SILT FENCE SOUTH SIDE OF LOT CLEAN STREET
Footing Inspection - Residential Passed 5/13/2022 (8:15) 5/13/2022 05/13/2022
Miscellaneous Correction
Resolved
05/13/2022
UFER LOCATED NORTH BASEMENT WALL BEHIND GARAGE
Underslab Plumbing Inspection - Residential Passed 6/21/2022 6/21/2022 06/21/2022
Sewer Service Inspection - R Passed 6/27/2022 (9:00) 6/27/2022 06/27/2022
Water Service Inspection - R Passed 6/28/2022 (1:00) 6/28/2022 06/28/2022
Electrical Service Inspection Passed 12/28/2022 12/28/2022 12/28/2022
Gas Service Inspection - Residential Passed 12/28/2022 12/28/2022 12/28/2022
All Rough Inspection - Residential Failed 12/28/2022 12/28/2022 12/28/2022
Misc
Corrective Action Required
12/28/2022
- (3) 2x10” joists under floor wall per plans at 2 locations garage - Fb penetrations top plate single garage door - Solid block joists under second floor wall - Address rafters landing on blocks garage - Add studs under 4 pack 2x6’s garage at entry wall - Anchor steel column bedroom 2 - Finnish through bolts on I-Beams - Fb chase at mud room shower - Complete kitchen vent ductwork to outside - Missing nails double 2x10” at I-beam bedroom 2 - Nail all exterior wall corners to plan - Missing nails in straps bedroom 2 - Provide security blocking deck door - Remove deck lid sheeting in corners for framing inspection - Provide joist hangers master closet - Provide attic access master suite side - Minimum of 3 studs at exterior corners master bedroom - Fb ceiling height changes throughout master suite - Fb top of chase bedroom 5 shower - Nail exterior corner of bedroom 5 - Address valley rafter supported on blocks bedroom 4 - Provide access to attic space over bedroom 2 irc R807 - Add valley rafter support bedroom 4 - Address hip rafter landing on blocks bedroom 3 closet - Nail exterior corners bedroom 3 - Address no top plate overlap bedroom 3 at bathroom - Loose stud at bottom of stairs - Anchor all steel columns in basement - Tighten all anchor bolts basement sill plates - Solid block siding breaks basement south wall - Tighten bolts at I-beam at stairs - Provide hangers on stairs stingers
Erosion Control Inspection Residential Failed 1/19/2023 01/19/2023
Misc
Corrective Action Required
01/19/2023
- Pick up loose and blowing trash - repair silt fence
All Rough Inspection - Residential Passed 1/19/2023 1/19/2023 01/19/2023
Misc
Resolved
01/19/2023
Sidewalk Inspection Partial 3/28/2023 3/28/2023 03/28/2023
Misc
Informational
03/28/2023
Deven Perry and I did the sidewalk inspection and it appears that te pre-pour inspection meets city standards and ADA standards. Will come back in a week to do a post-pour inspection.
Driveway Inspection Partial 3/28/2023 3/28/2023 03/28/2023
Misc
Informational
03/28/2023
Deven Perry and I did the driveway inspection and it appears that the pre-pour inspection meets city standards. Will come back in a week to do a post-pour inspection.
Sidewalk Inspection Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Informational
03/28/2023
Deven Perry and I did the sidewalk inspection and it appears that te pre-pour inspection meets city standards and ADA standards. Will come back in a week to do a post-pour inspection. 4-4-23 DP. Sidewalk has been poured, cross slope is in compliance, forms removed. passed.
Driveway Inspection Passed 4/4/2023 4/4/2023 04/04/2023
Misc
Informational
03/28/2023
Deven Perry and I did the driveway inspection and it appears that the pre-pour inspection meets city standards. Will come back in a week to do a post-pour inspection. 4-4-23 DP. Driveway was poured, forms removed, cross slope in compliance. Passed.
Erosion Control Inspection Residential Passed 8/31/2023 08/31/2023
Misc
Corrective Action Required
01/19/2023
- Pick up loose and blowing trash - repair silt fence
Occupancy Inspection - Codes Residential Failed 8/31/2023 8/31/2023 08/31/2023
Misc
Corrective Action Required
08/31/2023
-address access to sconces at both sides of garage -Need security screws on exterior door hinges per chapter 7 of city code -label non GFCIs in garage -missing fire blocking in basement behind furnace near duct to garage
Plot Plan Inspection Passed 8/31/2023 08/31/2023
Occupancy Inspection - Codes Residential Failed 9/18/2023 9/18/2023 09/18/2023
Misc
Resolved
09/18/2023
Misc
Corrective Action Required
09/18/2023
-Address pending pier inspection/provide third party inspection.
Piers/Caissons Inspection - Residential Passed 10/04/2023
Misc
Informational
10/04/2023
PIERS APPROVED PER VAN DEURZEN AND ASSOCIATES, P.A.ON 9/7/23
Occupancy Inspection - Codes Residential Full C of O 10/04/2023
Misc
Resolved
10/04/2023
-Address pending pier inspection/provide third party inspection.
Documents & Images
Date Uploaded File Type Document Name
01/11/2022 2022_01_10_Lot 106 Woodside Ridge_Apex_Permit Sealed
01/11/2022 Permit Applicatioin
01/11/2022 Approved Plans APPROVED PLANS
01/11/2022 Permit Codes Residential Plan Review
01/18/2022 Plot Plan APPROVED PLOT PLAN
01/18/2022 Permit Codes Residential Plan Review
01/19/2022 Permit DS Building Permit
01/19/2022 Receipt Receipt for transaction:2022-000320
05/05/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
09/12/2022 102 NW Ambersham Dr_DECK PIER INSP_2022-09-07
11/15/2022 Letter Codes 140 Day Letter
11/15/2022 Letter Codes 140 Day Letter
12/28/2022 Letter INSPECTION SUMMARY
12/28/2022 Letter INSPECTION SUMMARY
12/28/2022 Letter INSPECTION SUMMARY
01/18/2023 2023_01_13_Lot 106 Woodside Ridge_Apex_Compliance Letter
01/19/2023 Letter INSPECTION SUMMARY
01/19/2023 Letter INSPECTION SUMMARY
03/28/2023 Letter INSPECTION SUMMARY
03/28/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
08/30/2023 Letter Codes 140 Day Letter
08/31/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/20/2023 102 NW Ambersham Dr_DECK PIER INSP_2022-09-07
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter Codes Final Certificate of Occupancy
10/04/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home