Summary
PRRES20216072
Building Permit - Residential
Certificate of Occupancy
JCM DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 12/28/2021 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 12/29/2021 12:00 AM by username 'Mitchell Schwarz'.
11/22/2021
11/30/2021
05/28/2022
12/14/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
JCM DEVELOPMENT LLC, Address:1314 SW MARKET ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
THAD@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,053.63 $1,053.63 Paid 11/30/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/30/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/30/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 11/30/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 11/30/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 11/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 12/20/2021 12/20/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/20/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 12/22/2021 12/22/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/20/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/22/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -remove rock from curb and address no silt fence SW corner of lot and back of lot
Erosion Control Inspection Residential Failed - Stop Work 12/28/2021 12/28/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/22/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/22/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -remove rock from curb and address no silt fence SW corner of lot and back of lot -Erosion control still not in compliance stop work issued Mitchell Schwarz 12/28/2021 9:06 AM
Erosion Control Inspection Residential Partial 12/29/2021 12/29/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
12/29/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
12/29/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -remove rock from curb and address no silt fence SW corner of lot and back of lot -Erosion control still not in compliance stop work issued Mitchell Schwarz 12/28/2021 9:05 AM
Footing Inspection - Residential Passed 12/29/2021 12/29/2021
Misc
Informational
12/29/2021
3rd party inspection performed
Underslab Plumbing Inspection - Residential Passed 2/1/2022 2/1/2022 02/01/2022
Sewer Service Inspection - R Passed 2/9/2022 (9:00) 2/9/2022 02/09/2022
Water Service Inspection - R Passed 2/10/2022 (10:45) 2/10/2022 02/10/2022
Erosion Control Inspection Residential Failed 2/10/2022 2/10/2022 02/10/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/10/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Failed 6/24/2022 6/24/2022 06/24/2022
Misc
Corrective Action Required
06/24/2022
-tighten panel bonding screw at service panel
Gas Service Inspection - Residential Passed 6/24/2022 6/24/2022 06/24/2022
All Rough Inspection - Residential Failed 6/24/2022 6/24/2022 06/24/2022
Misc
Corrective Action Required
06/24/2022
-nail garage PFH sheathing per plans -nail all exterior sheathing per plans -deck ledger attachment per code -provide (2) 1/2" through bolts at each post/beam connection per code -address top plate corner lap connection, dbl car to sgl car garage wall, different plate heights -address top plate corner lap connection at garage walls to front entry wall, see East garage wall -tighten all anchor bolts at garage -fireblock unused top plate bore at garage entry closet -address top plate corner lap connection at great room exterior wall to kitchen and master bed walls -fireblock fireplace at master bed wall open to attic above ceiling line -seal all top plate penetrations at great room -have engineer with truss manufacturer address broken trusses above foyer -dbl girder truss landing on block at foyer, no H2.5 hold down clips -address top plate corner lap connection at front bed to front entry wall -provide blocking at sheathing edge and nail per plans, see front bed -CS-PF portal design per plans at dining room widows and sliding glass door see plans/IRC R602.10.6.4 for reference -min 24” lap between dbl top plate breaks, see master bed -WSP panel interior and exterior side of wall at great room per plans -fireblock vertical every 10’ between studs and foundation/framing at finished basement fireplace between top plate and foundation/top plate throughout finished basement -seal all top plate penetrations at finished basement -fireblock vertical to horizontal at furred down soffit ends finished basement -tighten panel bonding screw at service panel -osb at interior and exterior of wall at basement den windows per plans -provide 3” SCH 40 steel column at pier location “B” per plans at beam unfinished/storage -complete plumbing above basement bedroom closet
Erosion Control Inspection Residential Partial 06/24/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/24/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 7/15/2022 7/15/2022 07/15/2022
Misc
Resolved
07/15/2022
-tighten panel bonding screw at service panel
All Rough Inspection - Residential Failed 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
06/24/2022
-nail all exterior sheathing per plans -deck ledger attachment per code -provide (2) 1/2" through bolts at each post/beam connection per code -address top plate corner lap connection at garage walls to front entry wall, see East garage wall -have engineer with truss manufacturer address broken trusses above foyer -address dbl girder truss landing on block at foyer -CS-PF portal design per plans at dining room widows and sliding glass door see plans/IRC R602.10.6.4 for reference -WSP panel interior and exterior side of wall at great room per plans -fireblock vertical every 10’ between studs and foundation/framing at finished basement (missing and seal gaps and penetrations) -seal all top plate penetrations at finished basement -fireblock vertical to horizontal at furred down soffit ends finished basement (seal gaps) -osb at interior and exterior of wall at basement den windows per plans
All Rough Inspection - Residential Failed 7/22/2022 7/22/2022 07/22/2022
Misc
Corrective Action Required
07/15/2022
-provide (2) 1/2" through bolts at each post/beam connection per code -WSP panel interior and exterior side of wall at great room per plans -osb at interior and exterior of wall at basement den windows per plans (15/32 osb with 8D nails 6” edge 12” field per plans) **OK TO INSULATE**
All Rough Inspection - Residential Passed 8/9/2022 8/9/2022 08/09/2022
Misc
Resolved
08/09/2022
Erosion Control Inspection Residential Partial 08/09/2022
Driveway Inspection Partial 8/12/2022 8/12/2022 08/12/2022
Misc
Informational
08/12/2022
5-12-22 RH. Driveway is formed up and aggregate is placed and compacted.
Driveway Inspection Passed 8/19/2022 8/19/2022 08/19/2022
Misc
Informational
08/12/2022
8-12-22 RH. Driveway is formed up and aggregate is placed and compacted. 8-19-22 RH. Driveway meets LS and ADA standard.
Driveway Inspection Passed 11/23/2022 08/19/2022
Misc
Informational
08/19/2022
8-12-22 RH. Driveway is formed up and aggregate is placed and compacted. 8-19-22 RH. Driveway meets LS and ADA standard.
Sidewalk Inspection Partial 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. Sidewalk was formed up and aggregate was placed and compacted.
Erosion Control Inspection Residential Passed 11/22/2022 11/22/2022 11/22/2022
Plot Plan Inspection Passed 11/22/2022 11/22/2022 11/22/2022
Occupancy Inspection - Codes Residential Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/22/2022
-driveway and sidewalk inspections toons required, contact development services to schedule -splash blocks -set sewer tracer box to grade -water meter to lid 14-18” required height, meter currently 11” to lid -cover plate laundry outlet -GFCI protection at dishwasher outlet -(3) car garage requires (3) accessible 20 amp outlets -GFCI protection at unfinished mechanical outlets basement -provide hi/low combustion air vents for furnace/water heater -label all breaker locations at service panel, indicate locations of bedrooms and bathrooms, provide permanent labels not pencil on cabinet
Occupancy Inspection - Codes Residential Failed 12/7/2022 12/7/2022 12/07/2022
Misc
Corrective Action Required
11/22/2022
-final sidewalk inspection required, contact development services to schedule -splash blocks, min 36” discharge from foundation -AFCI protection required at kitchen,dining,fridge circuits -label all breaker locations at service panel, indicate locations of bedrooms and bathrooms
Sidewalk Inspection Passed 12/13/2022 12/13/2022 12/14/2022
Misc
Informational
08/25/2022
8-25-22 RH. Sidewalk was formed up and aggregate was placed and compacted.
Misc
Informational
12/14/2022
On Wednesday 12-14-2022 a visual inspection was performed and passed for the existing sidewalk.
Occupancy Inspection - Codes Residential Full C of O 12/14/2022 12/14/2022 12/14/2022
Misc
Resolved
12/14/2022
Documents & Images
Date Uploaded File Type Document Name
11/29/2021 CB #6 - PERMIT APPLICATION
11/29/2021 6 Cobey Creek Roof Layout
11/29/2021 Approved Plans Approved Drawings
11/29/2021 Approved Plans Approved Truss Layout
11/29/2021 Permit Codes Residential Plan Review
11/29/2021 Approved Plans Approved Truss Pacakge
11/30/2021 Plot Plan Approved Plot Plan
11/30/2021 Permit Codes Residential Plan Review
11/30/2021 Permit DS Building Permit
11/30/2021 Receipt Receipt for transaction:2021-008973
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter Stop Work Order
12/28/2021 Letter Stop Work Order
12/28/2021 Letter Stop Work Order
12/28/2021 6 Cobey Creek FTNG
12/29/2021 Letter INSPECTION SUMMARY
12/29/2021 Letter INSPECTION SUMMARY
01/13/2022 Letter Stop Work Order
02/01/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
06/10/2022 CB #6 - REVISED PERMIT APPLICATION
06/24/2022 Letter INSPECTION SUMMARY
06/24/2022 Letter INSPECTION SUMMARY
06/24/2022 Letter INSPECTION SUMMARY
06/24/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/21/2022 Approved Plans Approved Truss Repair
07/21/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter Field Certificate of Occupancy
12/14/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home