Permit Application Status

PRRES20215800


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215800
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNIFISHED BASEMENT -
11/05/2021
12/02/2021
05/07/2022
09/05/2024
Locations
Contacts
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
Kevin Stallings, Address:1100 NE Delta School Rd, Phone:(816) 491-2125  
DANDDBUILDINGCO@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $510.00 $510.00 Paid 12/02/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/02/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/02/2021
9110078-Valuation Fee New Single Family $1,076.27 $1,076.27 Paid 12/02/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 12/02/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 12/02/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/22/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/10/2021 (10:00) 12/10/2021 12/10/2021
Sewer Service Inspection - R Passed 1/4/2022 (9:30) 1/4/2022 01/04/2022
Water Service Inspection - R Passed 1/5/2022 (10:30) 1/5/2022 01/05/2022
Erosion Control Inspection Residential Failed 1/13/2022 01/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Not Ready 1/13/2022 1/13/2022 01/13/2022
Misc
Corrective Action Required
01/13/2022
-Erosion control not in compliance -no premise identification -no interior drain tile
Erosion Control Inspection Residential Failed 1/21/2022 01/21/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:39 AM
Underslab Plumbing Inspection - Residential Failed 2/8/2022 2/8/2022 02/08/2022
Misc
Corrective Action Required
01/13/2022
-no premise identification
Erosion Control Inspection Residential Failed 2/8/2022 2/8/2022 02/08/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/08/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
02/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:39 AM
Misc
Corrective Action Required
02/08/2022
Clean gravel from street
Underslab Plumbing Inspection - Residential Passed 2/11/2022 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
-no premise identification
Erosion Control Inspection Residential Passed 2/11/2022 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
Clean gravel from street
Miscellaneous Inspection Passed 8/23/2022 08/23/2022
Misc
Informational
08/23/2022
spoke with builder will be starting framing next month. Mitchell Schwarz 08/23/2022 1:16 PM
Erosion Control Inspection Residential Failed 5/11/2023 05/11/2023
Misc
Corrective Action Required
05/11/2023
outdoor restroom in street needs to be removed from street maintain silt fence
Gas Service Inspection - Residential Failed 6/12/2023 6/12/2023 06/12/2023
Misc
Corrective Action Required
06/12/2023
-inspection denied erosion control not in compliance -post address -remove outdoor restroom from street
Erosion Control Inspection Residential Failed 6/12/2023 06/12/2023
Misc
Corrective Action Required
05/11/2023
outdoor restroom in street needs to be removed from street maintain silt fence
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/12/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/12/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 6/13/2023 6/13/2023 06/13/2023
Misc
Corrective Action Required
06/13/2023
Inspection denied, no plans on site.
Electrical Service Inspection Failed 6/13/2023 6/13/2023 06/13/2023
Misc
Corrective Action Required
06/13/2023
inspection denied no plans on site portable restroom still in street
Erosion Control Inspection Residential Failed 6/13/2023 06/13/2023
Misc
Corrective Action Required
06/12/2023
outdoor restroom in street needs to be removed from street maintain silt fence
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/12/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/12/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Electrical Service Inspection Passed 7/5/2023 7/5/2023 07/05/2023
Misc
Resolved
07/05/2023
inspection denied no plans on site portable restroom still in street
All Rough Inspection - Residential Failed 7/5/2023 7/5/2023 07/05/2023
Misc
Corrective Action Required
06/13/2023
-Install flashing above horizontal trim -Anchor laundry rm exterior wall sill plate within 12” of break -Security-block rear exterior door at strike plate height per code -Secure fireplace to framing -Protect furnace intake&exhaust pipes at fireplace wall -Tie down rafters to wall at rear great room exterior wall -Fully nail all hanger holes at master bedroom ceiling beam connections -Basement bathroom fan flexible duct is limited to max 14 ft. Use combination of flexible duct and hard duct -Protect 3” waste stack at front basement bedroom closet -Fb front basement bedroom wall at I beam web -Shall vent all three traps from master bathroom shower&tub and front bathroom shower per code -Make sure to insulate cantilevered joist space under master bathroom & in-floor plumbing -Fb basement rec room/hallway wall from fur down ceiling space -Securely fasten wiring to framing @ max 4.5 ft interval, not just laying them loosely onto soffit framing -Brace interior walls per plan **OK TO INSULATE
Gas Service Inspection - Residential Passed 7/5/2023 7/5/2023 07/05/2023
Misc
Resolved
07/05/2023
-inspection denied erosion control not in compliance -post address -remove outdoor restroom from street
All Rough Inspection - Residential Failed 07/05/2023
Misc
Corrective Action Required
07/05/2023
-Install flashing above horizontal trim -Anchor laundry rm exterior wall sill plate within 12” of break -Security-block rear exterior door at strike plate height per code -Secure fireplace to framing -Protect furnace intake&exhaust pipes at fireplace wall -Tie down rafters to wall at rear great room exterior wall -Fully nail all hanger holes at master bedroom ceiling beam connections -Basement bathroom fan flexible duct is limited to max 14 ft. Use combination of flexible duct and hard duct -Protect 3” waste stack at front basement bedroom closet -Fb front basement bedroom wall at I beam web -Shall vent all three traps from master bathroom shower&tub and front bathroom shower per code -Make sure to insulate cantilevered joist space under master bathroom & in-floor plumbing -Fb basement rec room/hallway wall from fur down ceiling space -Securely fasten wiring to framing @ max 4.5 ft interval, not just laying them loosely onto soffit framing -Brace interior walls per plan **OK TO INSULATE
Erosion Control Inspection Residential Failed 8/4/2023 08/04/2023
Misc
Corrective Action Required
06/13/2023
outdoor restroom in street needs to be removed from street maintain silt fence clean gravel from street Mitchell Schwarz 8/4/23
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/13/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/13/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 8/4/2023 08/04/2023
Misc
Corrective Action Required
08/04/2023
outdoor restroom in street needs to be removed from street maintain silt fence clean gravel from street maintain overgrown vegetation Mitchell Schwarz 8/4/23
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/04/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 8/14/2023 8/14/2023 08/14/2023
Misc
Corrective Action Required
07/05/2023
-Security-block rear exterior door at strike plate height per code -Fb front basement bedroom wall at I beam web -Securely fasten wiring to framing @ max 4.5 ft interval, not just laying them loosely onto soffit framing -Brace interior walls per plan and code on correct side **OK TO INSULATE
Erosion Control Inspection Residential Failed 08/14/2023
Misc
Resolved
08/14/2023
outdoor restroom in street needs to be removed from street maintain silt fence clean gravel from street maintain overgrown vegetation Mitchell Schwarz 8/4/23
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/14/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
08/14/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
08/14/2023
-Remove gravel from street -Remove outdoor restroom from storm drain
Piers/Caissons Inspection - Residential Passed 8/17/2023 08/17/2023
Misc
Corrective Action Required
08/17/2023
Inspected 3 24”x36” piers
All Rough Inspection - Residential Passed 8/18/2023 08/18/2023
Misc
Resolved
08/18/2023
-Security-block rear exterior door at strike plate height per code -Fb front basement bedroom wall at I beam web -Securely fasten wiring to framing @ max 4.5 ft interval, not just laying them loosely onto soffit framing -Brace interior walls per plan and code on correct side **OK TO INSULATE
Driveway Inspection Partial 11/8/2023 11/8/2023 11/08/2023
Misc
Informational
11/08/2023
11-8-23 Dustin A, DW is not ready will come back tomorrow (11-9) Curb will need to be poured before approach is poured
Driveway Inspection Partial 11/9/2023 (8:45) 11/9/2023 11/09/2023
Misc
Informational
11/08/2023
11-8-23 Dustin A, DW is not ready will come back tomorrow (11-9) Curb will need to be poured before approach is poured 11-9-23 Dustin A, DW is framed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. Approved to pour.
Sidewalk Inspection Partial 11/9/2023 11/9/2023 11/09/2023
Misc
Informational
11/08/2023
11-8-23 Dustin A ,SW not ready will come back 11-9. 11-9-23 Dustin A, SW is formed and aggregate is compacted. Slopes ae in compliance . Conditions can change. Approved to pour
Sidewalk Inspection Failed 11/15/2023 11/15/2023 11/14/2023
Misc
Informational
11/09/2023
11-8-23 Dustin A ,SW not ready will come back 11-9. 11-9-23 Dustin A, SW is formed and aggregate is compacted. Slopes are in compliance . Conditions can change. Approved to pour 11-14-23 Dustin A, Sw has panels that are not in compliance with A.D.A standards. They are over 2 % on cross slopes. Panels that need to be corrected have been marked with pink paint. Fail
Driveway Inspection Failed 11/15/2023 11/15/2023 11/14/2023
Misc
Informational
11/09/2023
11-8-23 Dustin A, DW is not ready will come back tomorrow (11-9) Curb will need to be poured before approach is poured 11-9-23 Dustin A, DW is framed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. Approved to pour. 11-14-23 Dustin A, Dw is poured, forms are pulled their is a panel that does not meet A.D.A standards and is over 2% cross slope and will need to be fixed. I have marked the panel with pink paint. Fail
Sidewalk Inspection Partial 12/5/2023 12/5/2023 12/05/2023
Misc
Informational
11/14/2023
11-8-23 Dustin A ,SW not ready will come back 11-9. 11-9-23 Dustin A, SW is formed and aggregate is compacted. Slopes are in compliance . Conditions can change. Approved to pour 11-14-23 Dustin A, Sw has panels that are not in compliance with A.D.A standards. They are over 2 % on cross slopes. Panels that need to be corrected have been marked with pink paint. Fail 12-5-23 Dustin A , panels that failed have been removed. Has been reformed. Aggregate is compacted in the areas needed, Slopes are in compliance . Approved to repour those panels . Must maintain ADA specs .
Driveway Inspection Partial 12/05/2023
Misc
Informational
11/14/2023
11-8-23 Dustin A, DW is not ready will come back tomorrow (11-9) Curb will need to be poured before approach is poured 11-9-23 Dustin A, DW is framed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. Approved to pour. 11-14-23 Dustin A, Dw is poured, forms are pulled their is a panel that does not meet A.D.A standards and is over 2% cross slope and will need to be fixed. I have marked the panel with pink paint. Fail 12-5-23 Dustin A, DW sections that needed to be fixed have been removed. It has been formed and aggregate is compacted . Slopes are in compliance and will need to maintain slopes per ADA specs. Approved to repour.
Driveway Inspection Passed 12/12/2023 12/12/2023 12/12/2023
Misc
Informational
12/05/2023
11-8-23 Dustin A, DW is not ready will come back tomorrow (11-9) Curb will need to be poured before approach is poured 11-9-23 Dustin A, DW is framed and aggregate is compacted. Will need to maintain ADA compliant slopes through approach. Approved to pour. 11-14-23 Dustin A, Dw is poured, forms are pulled their is a panel that does not meet A.D.A standards and is over 2% cross slope and will need to be fixed. I have marked the panel with pink paint. Fail 12-5-23 Dustin A, DW sections that needed to be fixed have been removed. It has been formed and aggregate is compacted . Slopes are in compliance and will need to maintain slopes per ADA specs. Approved to repour. 12-12-23 Dustin A, dw meets city specs. passed
Sidewalk Inspection Passed 12/12/2023 12/12/2023 12/12/2023
Misc
Informational
12/05/2023
11-8-23 Dustin A ,SW not ready will come back 11-9. 11-9-23 Dustin A, SW is formed and aggregate is compacted. Slopes are in compliance . Conditions can change. Approved to pour 11-14-23 Dustin A, Sw has panels that are not in compliance with A.D.A standards. They are over 2 % on cross slopes. Panels that need to be corrected have been marked with pink paint. Fail 12-5-23 Dustin A , panels that failed have been removed. Has been reformed. Aggregate is compacted in the areas needed, Slopes are in compliance . Approved to repour those panels . Must maintain ADA specs . 12-12-23 Dustin A, sw now meets city specs. Passed
Erosion Control Inspection Residential Failed 02/07/2024
Misc
Corrective Action Required
08/14/2023
-Remove outdoor restroom from street
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/07/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/07/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN EROSION CONTROL AROUND LOT. REPAIR DOWNED SILT FENCE AND REPLACE WHERE MISSING
Occupancy Inspection - Codes Residential Failed 3/27/2024 3/27/2024 03/27/2024
Misc
Corrective Action Required
03/27/2024
Clean storm inlets pay all fees obtain issued lawn irrigation permit -provide 3rd party inspection report for suspended slab -provide engineering for retaining wall -update plot plan to show as built -address sump pump discharge -provide spark rings for kitchen outlets properly installed -secure conduit within 12" of water heater
Occupancy Inspection - Codes Residential Failed 5/21/2024 05/21/2024
Misc
Corrective Action Required
03/27/2024
-provide 3rd party inspection report for suspended slab front porch -update plot plan to show as built -provide spark rings for kitchen outlets (install properly)
Plot Plan Inspection Passed 6/13/2024 06/13/2024
Occupancy Inspection - Codes Residential Failed 8/28/2024 8/28/2024 08/28/2024
Misc
Corrective Action Required
05/21/2024
-provide spark rings for kitchen outlets (install properly)
Erosion Control Inspection Residential Passed 09/05/2024
Misc
Resolved
09/05/2024
-Remove outdoor restroom from street
DCM3 ESC REQUIRED 2 DAY
Resolved
09/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/05/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN EROSION CONTROL AROUND LOT. REPAIR DOWNED SILT FENCE AND REPLACE WHERE MISSING
Occupancy Inspection - Codes Residential Full C of O 9/5/2024 09/05/2024
Misc
Resolved
09/05/2024
-provide spark rings for kitchen outlets (install properly)
Documents & Images
Date Uploaded File Type Document Name
11/08/2021 49ww app
11/08/2021 Permit Codes Residential Plan Review
11/30/2021 Approved Plans APPROVED PLANS
11/30/2021 Plot Plan APPROVED PLOT PLAN
11/30/2021 Permit Codes Residential Plan Review
12/02/2021 Permit DS Building Permit
12/02/2021 Receipt Receipt for transaction:2021-009067
12/10/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter Codes 140 Day Letter
08/10/2022 Letter Codes 180 Day Letter
08/23/2022 Letter INSPECTION SUMMARY
01/10/2023 Letter Codes 140 Day Letter
05/11/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter Codes Residential Plan Review
06/12/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
02/07/2024 Letter INSPECTION SUMMARY
03/19/2024 HERS-ESTAR Certificate 1600 SW 27th St
03/27/2024 Letter INSPECTION SUMMARY
04/22/2024 4-12-24_1600 SW 27th st RW report
04/22/2024 Receipt Receipt for transaction:2024-002566
05/21/2024 Letter INSPECTION SUMMARY
06/12/2024 LOT49 As-Built
06/12/2024 Plot Plan approved as graded plot plan
06/13/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter Field Certificate of Occupancy
09/05/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home