Permit Application Status

PRRES20215563


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215563
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. COVERED PATIO.
10/22/2021
10/29/2021
04/25/2022
02/27/2023
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
CLASS ONE ELECTRIC INC, Address:PO BOX 24343, Phone:(913) 915-1767  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
SCOTT@NEWMARKHONESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 10/29/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 10/29/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 10/29/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/29/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/29/2021
9110078-Valuation Fee New Single Family $1,514.69 $1,514.69 Paid 10/29/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/09/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/09/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/09/2022
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/09/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/20/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/21/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 11/10/2021 11/10/2021 11/10/2021
Misc
Corrective Action Required
11/10/2021
NO EROSION CONTROL PRESENT ON LOT, EROSION CONTROL REQUIRED, ADDRESS EROSION CONTROL IMMEDIATELY, REQUIRED TO BE PRESENT AT LOT FROM EXCAVATION, SPOILS PILES AT REAR OF LOT IN SWALE
Footing Inspection - Residential Not Ready 11/16/2021 (10:30) 11/16/2021 11/16/2021
Misc
Corrective Action Required
11/16/2021
INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT AT STREET, PROTECT SWALE ALONG REAR OF LOT, NO EROSION CONTROL AT TIME OF INSPECTION 10:30 AM, EROSION CONTROL WAS FAILED ON 11/10, SEE INSPECTION REPORT
Erosion Control Inspection Residential Failed 11/16/2021 11/16/2021 11/16/2021
Misc
Corrective Action Required
11/10/2021
NO EROSION CONTROL PRESENT ON LOT, EROSION CONTROL REQUIRED, ADDRESS EROSION CONTROL IMMEDIATELY, REQUIRED TO BE PRESENT AT LOT FROM EXCAVATION, SPOILS PILES AT REAR OF LOT IN SWALE 11/16/21 - FOOTING INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT AT STREET, PROTECT SWALE ALONG REAR OF LOT, NO EROSION CONTROL AT TIME OF INSPECTION 10:30 AM, EROSION CONTROL WAS FAILED ON 11/10, SEE INSPECTION REPORT
Footing Inspection - Residential Not Ready 11/17/2021 (8:00) 11/17/2021 11/17/2021
Misc
Corrective Action Required
11/16/2021
CITY STAMPED PLANS REQUIRED ON SITE AT INSPECTION
Footing Inspection - Residential Passed 11/17/2021 (11:30) 11/17/2021 11/17/2021
Misc
Resolved
11/17/2021
CITY STAMPED PLANS REQUIRED ON SITE AT INSPECTION
Miscellaneous Inspection Failed 11/17/2021 11/17/2021 11/17/2021
Misc
Corrective Action Required
11/17/2021
FOOTING APPROVED, NO ADDITIONAL INSPECTIONS TO BE PERFORMED UNTIIL SWALE AT REAR OF LOT HAS BEEN RESTORED TO DESIGN APPROVED ON PLOT PLAN AND SWALE PROTECTED BY PROPER EROSION CONTROL. SWALE HAS BEEN ALTERED DURING EXCAVATION FOR FOOTING/FOUNDTION, SPOILS PILE LOCATED IN SWALE AND TRACKS FROM MACHINERY MOVING THROUGH SWALE
Underslab Plumbing Inspection - Residential Passed 12/27/2021 12/27/2021 12/27/2021
Sewer Service Inspection - R Passed 1/4/2022 (3:00) 1/4/2022 01/04/2022
Water Service Inspection - R Passed 1/5/2022 (1:30) 1/5/2022 01/05/2022
Erosion Control Inspection Residential Failed 1/21/2022 01/21/2022
Misc
Resolved
01/21/2022
NO EROSION CONTROL PRESENT ON LOT, EROSION CONTROL REQUIRED, ADDRESS EROSION CONTROL IMMEDIATELY, REQUIRED TO BE PRESENT AT LOT FROM EXCAVATION, SPOILS PILES AT REAR OF LOT IN SWALE 11/16/21 - FOOTING INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT AT STREET, PROTECT SWALE ALONG REAR OF LOT, NO EROSION CONTROL AT TIME OF INSPECTION 10:30 AM, EROSION CONTROL WAS FAILED ON 11/10, SEE INSPECTION REPORT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:17 AM
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
01/21/2022
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO INSPECTION(S) BEING PERFORMED.
Piers/Caissons Inspection - Residential Passed 4/26/2022 04/26/2022
All Rough Inspection - Residential Not Ready 6/21/2022 6/21/2022 06/21/2022
Misc
Corrective Action Required
06/21/2022
Inspection denied -no city stamped plans on site -maintain gravel filter and silt fence before rescheduling for inspection
Gas Service Inspection - Residential Passed 6/21/2022 6/21/2022 06/21/2022
Electrical Service Inspection Passed 6/21/2022 6/21/2022 06/21/2022
All Rough Inspection - Residential Failed 6/28/2022 6/28/2022 06/28/2022
Misc
Resolved
06/28/2022
Inspection denied -no city stamped plans on site -maintain gravel filter and silt fence before rescheduling for inspection
Misc
Corrective Action Required
06/28/2022
-nail top plate to header per design -address rafter to top plate connection through out -address ceiling joists to rafter connections through out -address over notched joist above single car garage for dwv -furr out and down around RA in garage for insulation -fireblock hvac chase to ceiling space -provide minimum 10psi at gas pressure gauge for inspection -cspf in breakfast room per plans -uncover covered rear patio for inspection -fireblock right and left of fireplace to ceiling space -over notched ceiling joists above master bath entry -addrholes drilled closer than 2” to the bottom of joists above master bath -missing lib’s in multiple areas though out home -stud pack at mast bath per plans -complete bath fan venting through out -solid block sheathing breaks through out 2nd floor -fireblock dead space at bed 3 entry -fire block hvac chase and dead space near hvac chase -address roof framing above bed4/5 bath -missing stud pack bed 5 N wall -complete dryer vent and fireblock dead space -stud packs per plans 2nd floor hall N wall -double every other joist in basement per plans see bottom of stairs -address over notched and not permited in middle 1/3joist at W basement wall for dwv -missing hangers on same joist -address joist cut for dwv W wall basement -solid blocking under kitchen island per plans -over cut hole in joist left of service panel
All Rough Inspection - Residential Failed 8/15/2022 8/15/2022 08/15/2022
Misc
Corrective Action Required
06/28/2022
-nail top plate to header per design portal frame -address over notched joist above single car garage for dwv -furr out and down around RA in garage for insulation -fireblock right and left of fireplace to ceiling space -address hole drilled closer than 2” to the bottom of joists above master bath -will check GB bracing at time of completion -address hole above master bath for bath fan drilled to close to edge -solid block sheathing breaks through out 2nd floor
All Rough Inspection - Residential Failed 8/22/2022 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/15/2022
-will check GB bracing at time of completion schedule for reinspection at this time Okay to insulate
All Rough Inspection - Residential Not Ready 9/6/2022 9/6/2022 09/06/2022
Misc
Corrective Action Required
08/22/2022
-will check GB bracing at time of completion schedule for reinspection at this time (not completed at time of inspection) Okay to insulate do not cover any items in need of inspection
All Rough Inspection - Residential Passed 9/9/2022 9/9/2022 09/09/2022
Misc
Resolved
09/09/2022
-will check GB bracing at time of completion schedule for reinspection at this time (not completed at time of inspection) Okay to insulate do not cover any items in need of inspection
Driveway Inspection Passed 9/16/2022 09/16/2022
Misc
Informational
09/16/2022
On Friday 9-16-2022. I performed and passed a driveway for placement of concrete
Occupancy Inspection - Codes Residential Failed 12/12/2022 12/12/2022 12/12/2022
Misc
Corrective Action Required
12/12/2022
- Obtain an irrigation permit and submit a back flow certification - Splash blocks - Final grading and sod - Garage outlets showing faulty and gfci will not reset - Discharge tube at water heater to be more than 2 times the diameter of pipe but not more than 6” from floor
Miscellaneous Inspection Passed 12/13/2022 12/13/2022
Misc
Resolved
12/13/2022
FOOTING APPROVED, NO ADDITIONAL INSPECTIONS TO BE PERFORMED UNTIIL SWALE AT REAR OF LOT HAS BEEN RESTORED TO DESIGN APPROVED ON PLOT PLAN AND SWALE PROTECTED BY PROPER EROSION CONTROL. SWALE HAS BEEN ALTERED DURING EXCAVATION FOR FOOTING/FOUNDTION, SPOILS PILE LOCATED IN SWALE AND TRACKS FROM MACHINERY MOVING THROUGH SWALE
Plot Plan Inspection Failed 12/13/2022 12/13/2022
Misc
Corrective Action Required
12/13/2022
provide as graded plot plan.
Occupancy Inspection - Codes Residential Ready for Temp CO 12/13/2022 12/13/2022 12/13/2022
Misc
Corrective Action Required
12/12/2022
- Splash blocks -provide as graded plot plan - sod
Occupancy Inspection - Codes Residential Ready for Temp CO 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
12/13/2022
- Splash blocks -provide as graded plot plan - sod
Plot Plan Inspection Passed 02/27/2023
Misc
Resolved
02/27/2023
provide as graded plot plan.
Erosion Control Inspection Residential Passed 02/27/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
02/27/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/21/2022 9:17 AM
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
02/27/2023
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO INSPECTION(S) BEING PERFORMED.
Occupancy Inspection - Codes Residential Full C of O 2/27/2023 2/27/2023 02/27/2023
Misc
Resolved
02/27/2023
- Splash blocks -provide as graded plot plan - sod
Documents & Images
Date Uploaded File Type Document Name
10/22/2021 0814_001
10/27/2021 Permit Codes Residential Plan Review
10/29/2021 Plot Plan APPROVED PLOT PLAN
10/29/2021 Permit Codes Residential Plan Review
10/29/2021 Permit DS Building Permit
10/29/2021 Receipt Receipt for transaction:2021-008359
11/10/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
02/07/2022 2022_02_07_21-361 Lot 44 Whispering Woods_Main Floor Beam Alternatives
04/07/2022 Approved Plans APPROVED PLANS
04/26/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
08/11/2022 2022_07_12_1620 SW 27th St_LSMO_City IDR Response_Sealed(2)
08/15/2022 Letter INSPECTION SUMMARY
08/19/2022 2022_08_16_1620 SW 27th St_LSMO_City IDR Response_Sealed
08/19/2022 New Mark WW44 Weld Cert
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
12/09/2022 Receipt Receipt for transaction:2022-009396
12/12/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/20/2022 Certificate/License Codes Temporary Certificate of Occupancy
12/20/2022 Receipt Receipt for transaction:2022-009586
01/19/2023 Extension Request Form (1)
02/13/2023 MC Signed As-Built L_ 44(1)
02/21/2023 Certificate/License Codes Temporary Certificate of Occupancy
02/21/2023 Receipt Receipt for transaction:2023-000972
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
02/27/2023 Letter Codes Final Certificate of Occupancy
02/27/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home