Permit Application Status

PRRES20215294


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215294
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME. COVERED DECK.
10/09/2021
10/21/2021
04/19/2022
02/16/2023
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
JASONFW1@COMCAST.NET  
R-MECH HEATING COOLING PLUMBING/RHODES HEATING COOLING PLUMBING AND ROOTER, Address:1425 AGNES AVE, Phone:(816) 920-5955  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 10/21/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 10/21/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 10/21/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/21/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/21/2021
9110078-Valuation Fee New Single Family $1,404.36 $1,404.36 Paid 10/21/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/02/2023
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/02/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/02/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/02/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/16/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/16/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/2/2021 (1:30) 11/2/2021 11/02/2021
Erosion Control Inspection Residential Failed 11/17/2021 11/17/2021
Misc
Corrective Action Required
11/17/2021
STREET CLEAN UP REQUIED ROCK DUMPED IN ROAD WAY
Underslab Plumbing Inspection - Residential Passed 11/17/2021 11/17/2021 11/17/2021
Sewer Service Inspection - R Passed 12/7/2021 (1:15) 12/7/2021 12/07/2021
Water Service Inspection - R Partial 12/7/2021 (1:15) 12/7/2021 12/07/2021
Misc
Informational
12/07/2021
pex ran roughly 20' out from foundation
Water Service Inspection - R Passed 12/8/2021 (9:00) 12/8/2021 12/08/2021
Misc
Resolved
12/08/2021
pex ran roughly 20' out from foundation
Erosion Control Inspection Residential Failed 1/24/2022 01/24/2022
Misc
Resolved
01/24/2022
STREET CLEAN UP REQUIED ROCK DUMPED IN ROAD WAY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/24/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/24/2022 3:24 PM
Electrical Service Inspection Failed 5/3/2022 5/3/2022 05/03/2022
Misc
Corrective Action Required
05/03/2022
-connect ufer to middle grounded bus bar.
Gas Service Inspection - Residential Failed 5/3/2022 5/3/2022 05/03/2022
Misc
Corrective Action Required
05/03/2022
-provide pressure gauge with minimum 10psi for inspection
All Rough Inspection - Residential Failed 5/3/2022 5/3/2022 05/03/2022
Misc
Corrective Action Required
05/03/2022
-Remover trim at garage to inspect header nailing -address rafters landing on blocks -address rafter to ceiling joist connections -anchor bolts in garage to be in the middle 1/3 of sill plate -anchor bolt to be with in 12” of plate ends and breaks but not closer than 7 times the diameter of the bolt -strap top plate where lapped less than 24” above garage entry -support dwv ever 48” OC -furr out of dwv and pex In Kitchen and fireblock -seal bottom and top plate penetration in pantry -address ledger to beam connection above kitchen/dining -address rear slider framing -address great room windows not framed to plans -complete fireplace install -complete bath vent install at master bath -(3) studs at laundry entry to plans -install all windows and doors be sure to frame front entry to plans -complete framing at front stoop and support ridge beam -complete bath vent in 2nd story baths -double every other joist in furnace area per plans -connect ufer to middle grounded bus bar -provide pressure gauge at gas for inspection minimum 10psi
Gas Service Inspection - Residential Failed 5/16/2022 5/16/2022 05/16/2022
Misc
Corrective Action Required
05/03/2022
inspection denied insulator in home blowing insulation -provide pressure gauge with minimum 10psi for inspection
Erosion Control Inspection Residential Failed 5/16/2022 05/16/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
05/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/24/2022 3:24 PM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/16/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Not Ready 5/16/2022 5/16/2022 05/16/2022
Misc
Corrective Action Required
05/03/2022
Home being insulated, inspection d -address rafters landing on blocks -address rafter to ceiling joist connections -anchor bolts in garage to be in the middle 1/3 of sill plate -anchor bolt to be with in 12” of plate ends and breaks but not closer than 7 times the diameter of the bolt -strap top plate where lapped less than 24” above garage entry -support dwv ever 48” OC -furr out of dwv and pex In Kitchen and fireblock -seal bottom and top plate penetration in pantry -address ledger to beam connection above kitchen/dining -address rear slider framing -address great room windows not framed to plans -complete fireplace install -complete bath vent install at master bath -(3) studs at laundry entry to plans -install all windows and doors be sure to frame front entry to plans -complete framing at front stoop and support ridge beam -complete bath vent in 2nd story baths -double every other joist in furnace area per plans -connect ufer to middle grounded bus bar -provide pressure gauge at gas for inspection minimum 10psi
All Rough Inspection - Residential Failed 5/18/2022 5/18/2022 05/18/2022
Misc
Corrective Action Required
05/18/2022
- complete patio roofing to lvl per engineer letter -furr out of dwv and pex In Kitchen and (fireblock) -address ledger to beam connection above kitchen/dining also nail all hangers -address great room windows not framed to plans -complete bath vent install at master bath -complete framing at front stoop and support ridge beam -complete bath vent in 2nd story baths -connect ufer to middle grounded bus bar -provide pressure gauge at gas for inspection minimum 10psi
Gas Service Inspection - Residential Passed 6/14/2022 06/14/2022
Misc
Resolved
06/14/2022
inspection denied insulator in home blowing insulation -provide pressure gauge with minimum 10psi for inspection
Electrical Service Inspection Passed 6/14/2022 6/14/2022 06/14/2022
Misc
Resolved
06/14/2022
-connect ufer to middle grounded bus bar.
Driveway Inspection Partial 7/11/2022 07/11/2022
Misc
Informational
07/11/2022
On 7.11.2022 I performed a driveway inspection and pass the sub-grade to pour concrete.
Sidewalk Inspection Partial 7/11/2022 07/11/2022
Misc
Informational
07/11/2022
On 7.11.2022 I performed a sidewalk inspection and pass the sub-grade to pour concrete.
Driveway Inspection Passed 8/8/2022 8/8/2022 08/08/2022
Misc
Informational
07/11/2022
On 7.11.2022 I performed a driveway inspection and pass the sub-grade to pour concrete. 8.8.2022 Driveway appears to be compliant
Piers/Caissons Inspection - Residential Passed 9/13/2022 09/13/2022
Occupancy Inspection - Codes Residential Not Ready 9/13/2022 9/13/2022 09/13/2022
Misc
Corrective Action Required
09/13/2022
inspection denied no address posted
Sidewalk Inspection Passed 9/14/2022 09/14/2022
Misc
Informational
07/11/2022
On 7.11.2022 I performed a sidewalk inspection and pass the sub-grade to pour concrete. 9-14-22 RH. Sidewalk passed LS and ADA specification.
Erosion Control Inspection Residential Failed 9/14/2022 09/14/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 09/14/2022 1:36 PM
Occupancy Inspection - Codes Residential Failed 9/14/2022 9/14/2022 09/14/2022
Misc
Resolved
09/14/2022
inspection denied no address posted
Misc
Corrective Action Required
09/14/2022
-maintain erosion control until sod is in place no further inspections until erosion control is in compliance -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -pay all fees -obtain lawn irrigation permit -check water meter at time of final grade and sod -secondary locking devices at rear slider -fill window well with gravel to drain. -all garage still to be Inspected -permit to be pulled or inspection added for underground gas line for outdoor fire pit
Plot Plan Inspection Passed 9/16/2022 09/16/2022
Occupancy Inspection - Codes Residential Ready for Temp CO 9/16/2022 9/16/2022 09/16/2022
Misc
Corrective Action Required
09/14/2022
-sod -splash blocks and sump pump discharge to extend 36” from foundation -pay all fees -obtain lawn irrigation permit -check water meter at time of final grade and sod -fill window well with gravel to drain.
Occupancy Inspection - Codes Residential Ready for Temp CO 1/3/2023 01/03/2023
Misc
Corrective Action Required
09/16/2022
-sod -splash blocks and sump pump discharge to extend 36” from foundation -pay all fees -obtain lawn irrigation permit -check water meter at time of final grade and sod -fill window well with gravel to drain.
All Rough Inspection - Residential Passed 6/14/2022 6/14/2022 02/16/2023
Misc
Resolved
06/14/2022
-furr out of dwv and pex In Kitchen and fireblock -address rear slider framing -address great room windows not framed to plans -complete bath vent install at master bath -install all windows and doors be sure to frame front entry to plans -complete framing at front stoop and support ridge beam -complete bath vent in 2nd story baths -connect ufer to middle grounded bus bar -provide pressure gauge at gas for inspection minimum 10psi
Erosion Control Inspection Residential Passed 02/16/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/16/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 09/14/2022 1:36 PM
Erosion Control Inspection Residential Passed 02/16/2023
Occupancy Inspection - Codes Residential Full C of O 2/16/2023 02/16/2023
Misc
Resolved
02/16/2023
-pay all fees -fill window well with gravel to drain.
Documents & Images
Date Uploaded File Type Document Name
10/09/2021 2104 SW HARVEST CITY DOCUMENTS
10/12/2021 Permit Codes Residential Plan Review
10/18/2021 Plot Plan APPROVED PLOT PLAN
10/21/2021 Permit Codes Residential Plan Review
10/21/2021 Approved Plans APPROVED DRAWINGS
10/21/2021 Permit Codes Residential Plan Review
10/21/2021 Permit DS Building Permit
10/21/2021 Receipt Receipt for transaction:2021-008151
11/02/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/10/2022 Final_2022_04_18_DPier_LSMO_Pat Cochran Concrete
05/16/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/18/2022 2104 SW Harvest Moon Ln - Structural Letter
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/27/2022 2104 SW Harvest Moon Lane - Structural Letter (May 25, 2022)
06/08/2022 IMG_20220608_111021
06/08/2022 IMG_20220608_111024
06/08/2022 IMG_20220608_111027
06/08/2022 IMG_20220608_111030
06/08/2022 IMG_20220608_111033
06/08/2022 IMG_20220608_111036
06/08/2022 IMG_20220608_111039
06/08/2022 IMG_20220608_111042
06/08/2022 IMG_20220608_111044
06/08/2022 IMG_20220608_111102
06/08/2022 IMG_20220608_111104
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
01/02/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/02/2023 Receipt Receipt for transaction:2023-000007
01/03/2023 TCO Extension 2104
01/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2023 Receipt Receipt for transaction:2023-000108
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/16/2023 Certificate/License Codes Temporary Certificate of Occupancy
02/16/2023 Certificate/License Codes Temporary Certificate of Occupancy
02/16/2023 Receipt Receipt for transaction:2023-000907
02/16/2023 Letter Field Certificate of Occupancy
02/16/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home