Permit Application Status

PRRES20214879


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20214879
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNIFINISHED BASEMENT - COVERED DECK
09/20/2021
10/19/2021
03/22/2022
11/23/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331504-EFHB Middle Big Creek, Full $502.20 $502.20 Paid 10/19/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 10/19/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/19/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/19/2021
9110078-Valuation Fee New Single Family $1,216.36 $1,216.36 Paid 10/19/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 10/19/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 10/19/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/06/2022
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/22/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/9/2021 11/9/2021 11/09/2021
Misc
Informational
11/09/2021
APPROVED PER BRADLEY HUXOL 11/5/21
Underslab Plumbing Inspection - Residential Passed 12/1/2021 12/1/2021 12/01/2021
Sewer Service Inspection - R Passed 1/28/2022 (10:15) 1/28/2022 01/28/2022
Water Service Inspection - R Passed 2/1/2022 (10:00) 2/1/2022 02/01/2022
Electrical Service Inspection Failed 5/17/2022 5/17/2022 05/17/2022
Misc
Corrective Action Required
05/17/2022
INSPECTION DENIED, NOT READY FOR INSPECTION
Gas Service Inspection - Residential Failed 5/17/2022 5/17/2022 05/17/2022
Misc
Corrective Action Required
05/17/2022
INSPECTION DENIED, NOT READY FOR INSPECTION
All Rough Inspection - Residential Not Ready 5/17/2022 5/17/2022 05/17/2022
Misc
Corrective Action Required
05/17/2022
INSPECTION DENIED, NOT READY FOR ALL ROUGH INSPECTION, ADDRESS CORRECTIONS BELOW BEFORE RESCHEDULING INSPECTION -Garage PFH nail exterior sheathing per plans/IRC R602.10.6.2 -2x6s required at furred downs garage for R-19 insulation for 2nd floor -seal penetrations in fireblock garage wall -have engineer address corner lap connection at garage wall field fix with strap to blocking -seal all top and bottom plate penetrations -secure/support NM through furred down to code garage ceiling -Fireblock HVAC chase garage -support all pex per code at garage ceiling -have engineer address dbl lvl landing on 2x4 blocks at sgl car garage wall, different top plate heights at sgl and dbl garage walls no corner lap connection -provide stud shoes all load bearing walls and exterior walls bored 40% or more -have engineer address no corner lap connection at great room window exterior wall and breakfast sliding glass door exterior wall, south corner at great room strapped to header -fireblock between trusses for attic space at stair wall **THIS IS AN INCOMPLETE AND SUBJECT TO ADDITIONAL CORRECTIONS**
Gas Service Inspection - Residential Passed 5/27/2022 5/27/2022 05/27/2022
Misc
Resolved
05/27/2022
INSPECTION DENIED, NOT READY FOR INSPECTION
Electrical Service Inspection Passed 5/27/2022 5/27/2022 05/27/2022
Misc
Resolved
05/27/2022
INSPECTION DENIED, NOT READY FOR INSPECTION
All Rough Inspection - Residential Failed 5/27/2022 5/27/2022 05/27/2022
Misc
Corrective Action Required
05/17/2022
-have engineer address corner lap connection at garage wall field fix with strap to blocking -secure/support NM through furred down to code garage ceiling -support all pex per code at garage ceiling -fire block hvac chase into furr down in garage -fire block hvac chase to owners entry -missing nails in hangers above stairway entry -missing nails in all h2.5’s along front entry wall -Support horizontal dwv 48” oc in attic space at entry/powder room, and provide proper slope -Provide attic access at front entry area -seal gaps in fire blocking above fire place -provide proper protection for gas line at fire place -complete cspf nailing at great room windows -missing nails in h2.5’s at back deck -address truss hanger modified above master bed/master bath entry -address over board 2x10 at same spot -address bath vent being punctured by hanger -missing nails in all h2.5master bed -address over board studs for dwv at master bath -provide slope and support for dwv in attic space -provide lib bracing to plans in bed 4 -complete hvac in basement -address cut joist above sump pit -solid block under island in basement to plans (one joist bay past each side) -fireblock between trusses for attic space at stair wall
Erosion Control Inspection Residential Failed 5/27/2022 05/27/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/27/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Failed 6/6/2022 6/6/2022 06/06/2022
Misc
Corrective Action Required
05/27/2022
-complete cspf nailing at great room windows OK TO INSULATE
All Rough Inspection - Residential Passed 6/27/2022 6/27/2022 06/27/2022
Misc
Resolved
06/27/2022
-complete cspf nailing at great room windows OK TO INSULATE
Erosion Control Inspection Residential Partial 06/27/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/27/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Driveway Inspection Partial 7/20/2022 7/20/2022 07/21/2022
Misc
Informational
07/20/2022
7.20.2022 I conducted a driveway inspection and pass the sub-grade to pour concrete.
Driveway Inspection Passed 07/21/2022
Misc
Informational
07/21/2022
7.20.2022 I conducted a driveway inspection and pass the sub-grade to pour concrete. 7.21.2022 Driveway appears to be in compliance
Erosion Control Inspection Residential Passed 10/3/2022 10/3/2022 10/03/2022
Occupancy Inspection - Codes Residential Failed 10/3/2022 10/3/2022 10/03/2022
Misc
Corrective Action Required
10/03/2022
-resolve outstanding inspection fee -submit as graded plot plan for review and approval -2nd floor stairs, basement stairs 34”-38” height handrail IRC R311.7.8.1 -provide approved hanger at trpl and dbl deck beam to ledger connection at deck -(2) 1/2” through bolts each post/beam connection at deck
Plot Plan Inspection Passed 10/18/2022 10/18/2022
Occupancy Inspection - Codes Residential Not Ready 11/17/2022 11/17/2022 11/17/2022
Misc
Corrective Action Required
10/03/2022
11/17/22 -NO ACCESS DOORS, NO LOCKBOX CODE PROVIDED -pay fees -2nd floor stairs, basement stairs 34”-38” height handrail IRC R311.7.8.1 -(2) 1/2” through bolts each post/beam connection at deck
Occupancy Inspection - Codes Residential Failed 11/21/2022 11/21/2022 11/21/2022
Misc
Corrective Action Required
11/17/2022
-pay fees -(2) 1/2” through bolts each post/beam connection at deck, (not complete, ledger loks not acceptable substitute for through bolts at post/beam connection)
Occupancy Inspection - Codes Residential Full C of O 11/23/2022 11/23/2022 11/23/2022
Misc
Resolved
11/23/2022
Documents & Images
Date Uploaded File Type Document Name
09/20/2021 MN #125 - PERMIT APP
09/21/2021 Application Form approved plans
09/21/2021 Application Form APPROVED TRUSS LAYOUT
09/21/2021 Application Form APPROVED TRUSS PACKAGE
09/23/2021 Permit Codes Residential Plan Review
10/19/2021 Plot Plan APPROVED PLOT PLAN
10/19/2021 Permit Codes Residential Plan Review
10/19/2021 Permit DS Building Permit
10/19/2021 Receipt Receipt for transaction:2021-008094
11/08/2021 125 Manor at Stoney Creek FTNG
11/09/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/25/2022 125 manor at stoney creek letter
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
06/01/2022 125 manor at stoney creek letter number 2
06/03/2022 MN 125 Cut HUS26 Hangers
06/06/2022 Letter INSPECTION SUMMARY
06/13/2022 125 manor at stoney creek letter#3
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/06/2022 Receipt Receipt for transaction:2022-008064
10/18/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
10/18/2022 Letter INSPECTION SUMMARY
11/16/2022 125 manor at stoney creek letter 10-31-22- signed
11/16/2022 125 Manor at Stoney Creek Deck Piers
11/17/2022 Letter INSPECTION SUMMARY
11/21/2022 Letter INSPECTION SUMMARY
11/22/2022 Receipt Receipt for transaction:2022-009102
11/23/2022 Letter Field Certificate of Occupancy
11/23/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: