Permit Application Status

PRRES20214637


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20214637
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT.
09/03/2021
09/08/2021
07/20/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 09/08/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 09/08/2021
Water Meter Fee $479.24 $479.24 Paid 09/08/2021
Right of Way Permit Fee $85.00 $85.00 Paid 09/08/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/08/2021
Valuation Fee New Single Family $1,361.67 $1,361.67 Paid 09/08/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/1/2021 11/1/2021 11/01/2021
Misc
Informational
11/01/2021
APPROVED PER BRADLEY HUXOL 9/21/21
Sewer Service Inspection - R Passed 11/1/2021 (11:00) 11/1/2021 11/01/2021
Water Service Inspection - R Passed 11/3/2021 (9:45) 11/3/2021 11/03/2021
Erosion Control Inspection Residential Failed 11/3/2021 11/3/2021 11/03/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/03/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 11/8/2021 11/08/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/03/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/08/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Underslab Plumbing Inspection - Residential Failed 11/8/2021 11/8/2021 11/08/2021
Misc
Corrective Action Required
11/08/2021
Inspection denied -Erosion control need be in place -street clean up
Underslab Plumbing Inspection - Residential Passed 11/16/2021 11/16/2021 11/16/2021
Misc
Resolved
11/16/2021
Inspection denied -Erosion control need be in place -street clean up
Electrical Service Inspection Passed 4/22/2022 4/22/2022 04/22/2022
Gas Service Inspection - Residential Passed 4/22/2022 4/22/2022 04/22/2022
Erosion Control Inspection Residential Failed 4/22/2022 04/22/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/22/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
04/22/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
04/22/2022
trash at back of lot to be cleaned up and maintain silt fence.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/22/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Failed 4/22/2022 4/22/2022 04/22/2022
Misc
Corrective Action Required
04/22/2022
-attic access in garage -seal gaps into furr down in garage from back wall,hvac chase, and powder room -stud packs at all gt bearing points per plans -seal penetrations into bed one furr down from laundry -boca plates at race way in bath one bottom plate -seal penetrations into bed one furr down from bath one -missing libs bed one -beam above bed one missing nuts and most not tight -nail all double tusses together to plans & code -nail exterior great room windows to plans -complete cspf per plans at all areas -strap top plate in office where plate breaks offset less than 24” -missing nails in lib’s though out -missing lib bed 2 -lib not to code bed two -strap top plate bed 2 closet where not lapped 24” -2nd floor attic access to provide access to all of attic space -(4) 2x4 per plans under stairs -solid block per plans under kitchen island -double every other where missing around this area as well -address over bored joist for hvac venting -solid block under cantilever
All Rough Inspection - Residential Failed 4/27/2022 4/27/2022 04/27/2022
Misc
Corrective Action Required
04/22/2022
-attic access in garage protect NM -nail exterior great room windows to plans -complete cspf per plans at all areas -strap top plate in office where plate breaks offset less than 24” -address over bored joist for hvac furnace venting
All Rough Inspection - Residential Passed 4/29/2022 4/29/2022 04/29/2022
Misc
Resolved
04/29/2022
-attic access in garage protect NM -nail exterior great room windows to plans -complete cspf per plans at all areas -strap top plate in office where plate breaks offset less than 24” -address over bored joist for hvac furnace venting
Driveway Inspection Partial 5/17/2022 5/17/2022 05/17/2022
Misc
Informational
05/17/2022
Driveway approach has been formed with compacted rock and is ready to pour.Steve Robbins 05/17/2022 4:44 PM
Driveway Inspection Passed 5/18/2022 06/07/2022
Misc
Informational
05/17/2022
Driveway approach has been formed with compacted rock and is ready to pour.Steve Robbins 05/17/2022 4:44 PM
Misc
Informational
06/07/2022
Driveway approach has been poured and is compliant.
Plot Plan Inspection Passed 7/12/2022 07/12/2022
Occupancy Inspection - Codes Residential Failed 7/12/2022 7/12/2022 07/12/2022
Misc
Corrective Action Required
07/12/2022
-Address to be properly illuminated -sod -check water meter at time of final grade and sod -seal top of meter can, A/c disconnect and all other exterior penetrations -splash blocks and sump pump discharge to extend 36” from foundation -guard rail at front stoop where required by code -outlets at kitchen SW wall not working -hardware and locking devices at rear slider -jacuzzi tub pump and outlet access to code -garage entry door to be self closing and latching -seal hole in ceiling in garage -basement stairs handrail to code -stairs in basement not to code -repair broken flood lamp at back of home -windows well ladder does not meet code (more than 18” to first step)
Erosion Control Inspection Residential Passed 7/20/2022 07/20/2022
Misc
Resolved
07/20/2022
trash at back of lot to be cleaned up and maintain silt fence.
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/20/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Full C of O 7/20/2022 7/20/2022 07/20/2022
Misc
Resolved
07/20/2022
-garage entry door to be self latching -basement stairs handrail to code -stairs in basement not to code -repair broken flood lamp at back of home -windows well ladder does not meet code (more than 18” to first step)
Documents & Images
Date Uploaded File Type Document Name
09/03/2021 HT #117 - PERMIT APP
09/08/2021 Approved Plans APPROVED DRAWINGS
09/08/2021 Approved Plans APPROVED TRUSS LAYOUT
09/08/2021 Approved Plans APPROVED TRUSS PACKAGE
09/08/2021 Plot Plan APPROVED PLOT PLAN
09/08/2021 Permit Codes Residential Plan Review
09/08/2021 Permit DS Building Permit
09/08/2021 Receipt Receipt for transaction:2021-007193
09/29/2021 Lot 117 Hawthorne Ridge Footing Inspection - SIGNED
11/01/2021 Letter INSPECTION SUMMARY
11/01/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
04/22/2022 Letter Codes Residential Plan Review
04/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/26/2022 117 Hawthorne Ridge Letter
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/28/2022 117 Hawthorne Ridge Letter #2
04/29/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter Inspection Summary
06/01/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter Field Certificate of Occupancy
07/20/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home