Permit Application Status

PRRES20213804


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213804
Building Permit - Residential
Certificate of Occupancy
TRAILS OF PARK RIDGE LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
07/22/2021
08/03/2021
01/19/2022
07/01/2022
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
TRAILS OF PARK RIDGE LLC, Address:3170 NE CARNEGIE DR STE 400  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/03/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 08/03/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 08/03/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 08/03/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 08/03/2021
9110078-Valuation Fee New Single Family $1,004.63 $1,004.63 Paid 08/03/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 8/12/2021 (1:00) 8/12/2021 08/12/2021
Misc
Corrective Action Required
08/12/2021
THE REAR 36" PAD IS UNDERMINED (ADJACENT TO OVERDIG) **OK TO POUR THE REST OF THE FOOTING, EXCEPT THE ABOVE
Underslab Plumbing Inspection - Residential Passed 9/14/2021 9/14/2021 09/14/2021
Piers/Caissons Inspection - Residential Passed 12/1/2021 (10:15) 12/1/2021 12/01/2021
All Rough Inspection - Residential Failed 12/8/2021 12/8/2021 12/08/2021
Misc
Corrective Action Required
12/08/2021
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT -Install 2”x2” anchor washers for garage PFH walls -Complete b-vent installation; install insulation shield; Fb chase from roof -Staple wiring along studs min 1.25” away from stud surface or protect -Add another stud under lvl hip beam at cooktop -Support cut lvl hip&valley rafters above rear dining -Parallel electrical within return air space at front bedroom/bathroom wall -Rafters notched about 40% at bearing ends. Max 25% allowed -Fb dead space at master bathroom from roof; Fb floor hole at sink -Complete installing fireplace flue -Fb wall spaces at fireplace wall from roof -Provide combustion air openings for water heater -Shim excessive gap at foundation wall under I beam point load -Fb basement wall space from soffit and fur down ceiling space -Connect basement bathroom fan flex duct to hard duct -Lower supply duct to basement bathroom ceiling -Pan off return air from front basement bedroom soffit; complete return air from this bedroom -Anchor sill plate within 12” of basement walkout door **OK TO INSULATE
Misc
Corrective Action Required
12/08/2021
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT -Install 2”x2” anchor washers for garage PFH walls -Complete b-vent installation; install insulation shield; Fb chase from roof -Staple wiring along studs min 1.25” away from stud surface or protect -Add another stud under lvl hip beam at cooktop -Support cut lvl hip&valley rafters above rear dining -Parallel electrical within return air space at front bedroom/bathroom wall -Rafters notched about 40% at bearing ends. Max 25% allowed -Fb dead space at master bathroom from roof; Fb floor hole at sink -Complete installing fireplace flue -Fb wall spaces at fireplace wall from roof -Provide combustion air openings for water heater -Shim excessive gap at foundation wall under I beam point load -Fb basement wall space from soffit and fur down ceiling space -Connect basement bathroom fan flex duct to hard duct -Lower supply duct to basement bathroom ceiling -Pan off return air from front basement bedroom soffit; complete return air from this bedroom -Anchor sill plate within 12” of basement walkout door **OK TO INSULATE
Electrical Service Inspection Passed 12/8/2021 12/8/2021 12/08/2021
Gas Service Inspection - Residential Passed 12/8/2021 12/8/2021 12/08/2021
Sewer Service Inspection - R Passed 12/16/2021 (8:45) 12/16/2021 12/16/2021
Water Service Inspection - R Passed 12/20/2021 (9:15) 12/20/2021 12/20/2021
All Rough Inspection - Residential Failed 3/1/2022 3/1/2022 03/01/2022
Misc
Corrective Action Required
12/08/2021
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT -Fb b-vent chase from roof -Provide combustion air openings for water heater -Fb basement wall space from soffit and fur down ceiling space **not done -Pan off return air from front basement bedroom soffit; complete return air from this bedroom **is there a return air from this bedroom? -Anchor sill plate within 12” of basement walkout door
Misc
Resolved
03/01/2022
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT -Install 2”x2” anchor washers for garage PFH walls -Complete b-vent installation; install insulation shield; Fb chase from roof -Staple wiring along studs min 1.25” away from stud surface or protect -Add another stud under lvl hip beam at cooktop -Support cut lvl hip&valley rafters above rear dining -Parallel electrical within return air space at front bedroom/bathroom wall -Rafters notched about 40% at bearing ends. Max 25% allowed -Fb dead space at master bathroom from roof; Fb floor hole at sink -Complete installing fireplace flue -Fb wall spaces at fireplace wall from roof -Provide combustion air openings for water heater -Shim excessive gap at foundation wall under I beam point load -Fb basement wall space from soffit and fur down ceiling space -Connect basement bathroom fan flex duct to hard duct -Lower supply duct to basement bathroom ceiling -Pan off return air from front basement bedroom soffit; complete return air from this bedroom -Anchor sill plate within 12” of basement walkout door **OK TO INSULATE
All Rough Inspection - Residential Passed 3/2/2022 3/2/2022 03/02/2022
Misc
Resolved
03/02/2022
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT -Provide combustion air openings for water heater
Driveway Inspection Partial 4/11/2022 4/11/2022 04/11/2022
Misc
Informational
04/11/2022
4-11-22 AN forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Partial 4/18/2022 4/18/2022 04/19/2022
Misc
Informational
04/11/2022
4-11-22 AN forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
04/19/2022
4-19-22 AN driveway looks good and has expansion joints at curb and right of way
Driveway Inspection Passed 04/19/2022
Misc
Informational
04/19/2022
4-11-22 AN forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
04/19/2022
4-19-22 AN driveway looks good and has expansion joints at curb and right of way
Occupancy Inspection - Codes Residential Failed 5/10/2022 5/10/2022 05/10/2022
Misc
Corrective Action Required
05/10/2022
-Obtain lawn irrigation permit and submit backflow valve test report to city -Footing not approved on record -Sewer manhole at front is buried -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Install tamper-proof caps at AC valves -Paint gas service piping -Provide 1.5” space around handrail -Secure water service pex line -Install backflow preventer at hose bibb -Provide maximum 30 amp breaker for AC
Occupancy Inspection - Codes Residential Temporary C of O 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/10/2022
-Sewer manhole at front is buried -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Install tamper-proof caps at AC valves -Paint gas service piping
Footing Inspection - Residential Passed 06/29/2022
Misc
Resolved
06/29/2022
THE REAR 36" PAD IS UNDERMINED (ADJACENT TO OVERDIG) **OK TO POUR THE REST OF THE FOOTING, EXCEPT THE ABOVE
Occupancy Inspection - Codes Residential Failed 6/29/2022 6/29/2022 06/29/2022
Misc
Corrective Action Required
05/11/2022
-Install tamper-proof caps at AC valves
Occupancy Inspection - Codes Residential Full C of O 7/1/2022 7/1/2022 07/01/2022
Misc
Resolved
07/01/2022
-Install tamper-proof caps at AC valves
Documents & Images
Date Uploaded File Type Document Name
07/22/2021 Application Form APPLICATION
07/23/2021 Plot Plan APPROVED PLOT PLAN
07/23/2021 Permit Codes Residential Plan Review
07/28/2021 Permit Codes Residential Plan Review
07/28/2021 Approved Plans APPROVED PLANS
08/03/2021 Permit DS Building Permit
08/03/2021 Receipt Receipt for transaction:2021-006199
08/12/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/16/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/01/2022 Engineer Report/Study DW 41968 LETTER Raleigh Orig Rev GR 1.5 Lot 54 ToPR 4075 NE Timberlake Ct
03/02/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter Codes Temporary Certificate of Occupancy
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter Field Certificate of Occupancy
07/01/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home