Permit Application Status

PRRES20213774


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213774
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK - ROOF TRUSSES
07/21/2021
07/22/2021
06/29/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $480.00 $480.00 Paid 07/22/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/22/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/22/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 07/22/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 07/22/2021
9110078-Valuation Fee New Single Family $1,395.36 $1,395.36 Paid 07/22/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/21/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/21/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/23/2021 08/23/2021
Misc
Informational
08/23/2021
3RD PARTY FOOTING BY DEREK PEREZ @ EVERSTEAD SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED RIGHT REAR CORNER OF GARAGE FOUNDATION WALL
Sewer Service Inspection - R Passed 9/24/2021 09/24/2021
Underslab Plumbing Inspection - Residential Passed 9/24/2021 9/24/2021 09/24/2021
Water Service Inspection - R Partial 9/24/2021 09/24/2021
Misc
Informational
09/24/2021
PARTIAL HOUSE TO METER PIT WAITING IN TAP
Water Service Inspection - R Passed 9/27/2021 (10:45) 9/27/2021 09/27/2021
Misc
Informational
09/24/2021
PARTIAL HOUSE TO METER PIT WAITING IN TAP
Electrical Service Inspection Passed 3/2/2022 3/2/2022 03/02/2022
Gas Service Inspection - Residential Passed 3/2/2022 3/2/2022 03/02/2022
All Rough Inspection - Residential Failed 3/2/2022 3/2/2022 03/02/2022
Miscellaneous Correction
Corrective Action Required
03/02/2022
- No truss lay out plans -Uncover patio and deck trusses for inspection -Have engineer address NW basement exterior wall corners not connected -Address joists bored less than 2” apart and less than 2” from bottom of joist for electrical by panel -3 studs per exterior corner at basement corners -Anchor bolt within 12” of plate break and at end plate each side of door at rec room, bed 4 plate break, bath 3/4 plate break -Address joists over bored for dwv bed 4, bed 3 -Sister over notched stud at bed 4 -Provide stud shoes at over bored studs bed 4 -Missing studs bed 3 load bearing wall - Provide nuts, washers & tighten anchor bolts garage - Provide anchor bolt end of plate north wall single car garage -Provide CS-PF exterior bracing per plan Foyer, great room, dining, bed 1 -Provide (2) 2x6 at microwave/oven per plan -Provide (2) 2x4 at dead space at refrigerator -Provide boca plate water line refrigerator -Provide 2 nails bottom plate LIB in pantry Nail LIBs at top of stairs -Missing LIB bed 2 -Fire blocking behind tub bed #4 -Complete Framing bath 4 -Complete framing bed 3 -Nail exterior wall sheathing per code -Provide protection to avoid damage to service panel from condensation, leaks and breaks in overhead plumbing ( 2018 IRC E3405.3 )
All Rough Inspection - Residential Not Ready 3/9/2022 3/9/2022 03/09/2022
Miscellaneous Correction
Corrective Action Required
03/02/2022
- No truss lay out plans ( no layout in the 80 pages in zip lock bag) -Uncover patio and deck trusses for inspection -Have engineer address NW basement exterior wall corners not connected ( and SW corner no overlap) : everstead letter only for bores in joist : -Address joists bored less than 2” apart and less than 2” from bottom of joist for electrical by panel ( everstead letter recommends 4' CS16 straps not 48") -Address joists over bored for dwv bed 4, bed 3 ( no letter no work done) -Sister over notched stud at bed 4 ( at anchor bolt not done ) -Provide stud shoes at over bored studs bed 4 ( not done ) -Missing studs bed 3 load bearing wall -Provide CS-PF exterior bracing per plan Foyer, great room ( straps & nailing ) -Fire blocking behind tub bed #4 ( top plate vertical to horizontal) -Nail exterior wall sheathing per code -Provide protection to avoid damage to service panel from condensation, leaks and breaks in overhead plumbing ( 2018 IRC E3405.3 )
All Rough Inspection - Residential Not Ready 3/17/2022 3/17/2022 03/17/2022
Miscellaneous Correction
Corrective Action Required
03/09/2022
3-17-22 NOT READY FEE ASSESSED -Uncover patio and deck trusses for inspection-NOT DONE STILL -Address joists bored less than 2” apart and less than 2” from bottom of joist for electrical by panel ( everstead letter recommends 4' CS16 straps not 48")-NOT COMPLETE, SEE TRIPLE JOIST AND FIRST JOIST ABOVE PANEL -Address joists over bored for dwv bed 4, bed 3 ( no letter no work done) -NOT COMPLETE, SEE LAST JOIST BY PARALLEL WALL AND JOIST IN REC ROOM -CSPF at Foyer, great room -SEAL NAIL HOLES IN MOISTURE BARRIER -Fire blocking behind tub bed #4 ( top plate vertical to horizontal)-STILL NOT COMPLETE -Provide protection to avoid damage to service panel from condensation, leaks and breaks in overhead plumbing ( 2018 IRC E3405.3 ) -NOT COMPLETE
All Rough Inspection - Residential Passed 3/23/2022 3/23/2022 03/23/2022
Miscellaneous Correction
Resolved
03/23/2022
Driveway Inspection Partial 3/31/2022 03/31/2022
Misc
Informational
03/31/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Sidewalk Inspection Partial 3/31/2022 3/31/2022 03/31/2022
Misc
Informational
03/31/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Driveway Inspection Partial 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
03/31/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/08/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Sidewalk Inspection Partial 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
03/31/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/08/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Driveway Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/08/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/08/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-15-22
Sidewalk Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/08/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/08/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-15-22
Driveway Inspection Passed 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/15/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-15-22
Misc
Informational
04/22/2022
Finished driveway meets LS and ADA specs. RP 4-22-22
Sidewalk Inspection Passed 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/15/2022
Forms were placed and aggregate was present and compacted. RP 3-31-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-8-22
Misc
Informational
04/15/2022
Still covered with blankets. I will reschedule it again for next week. RP 4-15-22
Misc
Informational
04/22/2022
Finished sidewalk meets LS and ADA specs. RP 4-22-22
Erosion Control Inspection Residential Passed 06/29/2022
Piers/Caissons Inspection - Residential Passed 06/29/2022
Misc
Informational
06/29/2022
third party inspector
Plot Plan Inspection Passed 6/30/2022 06/29/2022
Occupancy Inspection - Codes Residential Full C of O 6/29/2022 6/29/2022 06/29/2022
Miscellaneous Correction
Corrective Action Required
03/23/2022
FINAL ITEM FROM ROUGH IN -Provide protection to avoid damage to service panel from condensation, leaks and breaks in overhead plumbing ( 2018 IRC E3405.3 ) -NOT COMPLETE 3-23-22 CHECK ON FINAL
Documents & Images
Date Uploaded File Type Document Name
07/21/2021 W0 #103 - Permit App
07/21/2021 Approved Plans APPROVED PLANS
07/21/2021 Approved Plans APPROVED TRUSS DRAWINGS
07/21/2021 Approved Plans APPROVED TRUSS LAYOUT
07/21/2021 Plot Plan APPROVED PLOT PLAN
07/22/2021 Permit Codes Residential Plan Review
07/22/2021 Permit DS Building Permit
07/22/2021 Receipt Receipt for transaction:2021-005855
07/22/2021 LOT 103 FINAL 7-22-21
08/23/2021 103 Woodside Ridge FTNG
08/23/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/27/2021 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/08/2022 103 WOODSIDE RIDGE LETTER
03/09/2022 Letter INSPECTION SUMMARY
03/16/2022 103 WOODSIDE RIDGE LETTER #2
03/17/2022 Letter INSPECTION SUMMARY
03/21/2022 Receipt Receipt for transaction:2022-001532
03/23/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
06/29/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
06/29/2022 Letter Codes Final Certificate of Occupancy
06/29/2022 Letter Field Certificate of Occupancy
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home