NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK TILE ROOF
07/14/2021
07/20/2021
01/10/2022
06/29/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MIKE@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $360.00 $360.00 Paid 07/20/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 07/20/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 07/20/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/20/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/20/2021
9110078-Valuation Fee New Single Family $961.63 $961.63 Paid 07/20/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/23/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/14/2021 (10:30) 9/14/2021 09/14/2021
Miscellaneous Correction
Corrective Action Required
09/14/2021
: POST ADDRESS : - UFER LOCATED FOUNDATION WALL REAR OF GARAGE - - DECK PIER J 18 X 36 W/ (4) # 4 VERT BARS NOT READY TO INSPECT - - OK TO POUR FOOTING -
Underslab Plumbing Inspection - Residential Failed 11/3/2021 11/3/2021 11/03/2021
Misc
Corrective Action Required
11/03/2021
inspection denied erosion control needed and address posted
Erosion Control Inspection Residential Failed 11/3/2021 11/03/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/03/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Passed 11/15/2021 11/15/2021 11/15/2021
Misc
Resolved
11/15/2021
Sewer Service Inspection - R Passed 12/1/2021 12/01/2021
Water Service Inspection - R Passed 12/2/2021 (10:30) 12/2/2021 12/02/2021
All Rough Inspection - Residential Not Ready 3/2/2022 3/2/2022 03/02/2022
Misc
Corrective Action Required
03/02/2022
NOT READY-COMPLETE THESE ITEMS BEFORE RESCHEDULING -Clean debris from street and storm inlet, remove trash from site -Unable to verify nailing at braced walls cover with moisture barrier -Provide H2.5s and all hangers at all trusses -Seal all plate penetrations -Address exterior walls nor connected at top plates at garage/entry, Garage/owners entry, Entry/ bed 2 -Address broken truss at garage/entry -Address single top plate on exterior entry walls -Provide min 1” clearance to combustibles at B vent roof sheathing -Fireblock fireplace from truss space -Install missing doors and windows -Provide attic access per code -Provide anchor bolts at plate breaks in basement
Gas Service Inspection - Residential Passed 3/2/2022 3/2/2022 03/02/2022
Erosion Control Inspection Residential Failed 3/2/2022 3/2/2022 03/02/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/03/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -CLEAN DEBRIS FROM STREETS AND STORM INLET, REMOVE TRASH FROM SITE
Electrical Service Inspection Passed 3/2/2022 3/2/2022 03/02/2022
All Rough Inspection - Residential Failed 3/21/2022 3/21/2022 03/21/2022
Misc
Corrective Action Required
03/02/2022
- complete nailing for PFH portal frame -Address broken truss at garage/entry - Provide nuts and tighten anchor bolts in basement - Finnish DWV under bedroom 1 shower - correct excessive slack in LIB bedroom 1 - Complete solid blocking from truss space wall at entry, great room
Erosion Control Inspection Residential Failed 3/25/2022 3/25/2022 03/25/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/02/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -CLEAN DEBRIS FROM STREETS AND STORM INLET, REMOVE TRASH FROM SITE
All Rough Inspection - Residential Passed 3/25/2022 3/25/2022 03/25/2022
Misc
Resolved
03/25/2022
- complete nailing for PFH portal frame -Address broken truss at garage/entry - Provide nuts and tighten anchor bolts in basement - Finnish DWV under bedroom 1 shower - correct excessive slack in LIB bedroom 1 - Complete solid blocking from truss space wall at entry, great room
Driveway Inspection Partial 4/4/2022 4/4/2022 04/04/2022
Misc
Informational
04/04/2022
Forms were placed and aggregate was present and compacted. RP 4-4-22
Driveway Inspection Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/04/2022
Forms were placed and aggregate was present and compacted. RP 4-4-22
Misc
Informational
04/08/2022
Finished driveway meets LS and ADA specs. RP 4-8-22
Sidewalk Inspection Partial 4/25/2022 4/25/2022 04/25/2022
Misc
Informational
04/25/2022
Sidewalk was framed up with aggregate in and compacted. 4/25/22 ES
Sidewalk Inspection Passed 5/6/2022 5/6/2022 05/10/2022
Misc
Informational
04/25/2022
Sidewalk was framed up with aggregate in and compacted. 4/25/22 ES
Misc
Informational
05/10/2022
Sidewalk meets LS and Ada specs. 5/10/22 ES
Occupancy Inspection - Codes Residential Failed 6/16/2022 6/16/2022 06/16/2022
Misc
Informational
03/25/2022
MASTER SHOWER PLUMBING NOT COMPLETE AR ROUGH.
Miscellaneous Correction
Corrective Action Required
06/16/2022
Inspection denied No address
Erosion Control Inspection Residential Passed 06/20/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/20/2022
Occupancy Inspection - Codes Residential Failed 6/20/2022 6/20/2022 06/20/2022
Misc
Resolved
06/20/2022
MASTER SHOWER PLUMBING NOT COMPLETE AR ROUGH.
Miscellaneous Correction
Resolved
06/20/2022
Inspection denied No address
Misc
Corrective Action Required
06/20/2022
- pay all fees - House numbers to be contrasting colors - Final grading and sod - Seal top of A/C disconnect - Provide cover for attic access - Handrail in garage at 40” R311.7.8.1 Handrail height 34-38”
Erosion Control Inspection Residential Failed 06/24/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/24/2022
6/24/22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. (BY RE INSPECTION ON 6/29/22) -PROVIDE AND MAINTAIN EROSION CONTROL AT PERIMETER UNTIL SOD IS IN PLACE. -CLEAN SILT AND DEBRIS FROM STREET, SIDEWALK AND STORM INLET IMMEDIATELY
Occupancy Inspection - Codes Residential Failed 6/24/2022 6/24/2022 06/24/2022
Misc
Corrective Action Required
06/20/2022
6/24/22- NO EROSION CONTROL, NO ACCESS - House numbers to be contrasting colors - Final grading and sod - Seal top of A/C disconnect - Provide cover for attic access - Handrail in garage at 40” R311.7.8.1 Handrail height 34-38”
Erosion Control Inspection Residential Passed 6/29/2022 6/29/2022 06/27/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
06/27/2022
Plot Plan Inspection Passed 06/27/2022
Occupancy Inspection - Codes Residential Temporary C of O 6/27/2022 6/27/2022 06/27/2022
Misc
Corrective Action Required
06/24/2022
- Final grading and sod
Occupancy Inspection - Codes Residential Full C of O 6/29/2022 6/29/2022 06/29/2022
Misc
Resolved
06/29/2022
Documents & Images
Date Uploaded File Type Document Name
07/14/2021 W1 #26 - Permit App
07/14/2021 LOT 26 FINAL
07/14/2021 Permit Codes Residential Plan Review
07/14/2021 Approved Plans Approved Truss Layout
07/14/2021 Approved Plans Approved Truss Package
07/14/2021 Approved Plans Approved Drawings
07/15/2021 LOT 26 CITY
07/15/2021 Plot Plan Approved Plot Plan
07/15/2021 Permit Codes Residential Plan Review
07/20/2021 Permit DS Building Permit
07/20/2021 Receipt Receipt for transaction:2021-005779
09/14/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/18/2022 26 Woodside Ridge Field Issue
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 W1 26 B5 B6 Truss Repair
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/23/2022 Receipt Receipt for transaction:2022-005086
06/24/2022 Letter INSPECTION SUMMARY
06/24/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter Codes Temporary Certificate of Occupancy
06/29/2022 Letter Codes Final Certificate of Occupancy
06/29/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home