Permit Application Status

PRRES20213629


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213629
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
07/14/2021
07/20/2021
01/10/2022
09/07/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $360.00 $360.00 Paid 07/20/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 07/20/2021
Water Meter Fee $479.24 $479.24 Paid 07/20/2021
Right of Way Permit Fee $80.00 $80.00 Paid 07/20/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/20/2021
Valuation Fee New Single Family $1,003.24 $1,003.24 Paid 07/20/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/17/2021 08/17/2021
Underslab Plumbing Inspection - Residential Failed 9/20/2021 9/20/2021 09/20/2021
Misc
Corrective Action Required
09/20/2021
POST ADDRESS
Underslab Plumbing Inspection - Residential Passed 9/22/2021 9/22/2021 09/22/2021
Misc
Resolved
09/22/2021
Sewer Service Inspection - R Passed 11/8/2021 (9:30) 11/8/2021 11/08/2021
Water Service Inspection - R Passed 11/9/2021 (1:00) 11/9/2021 11/09/2021
Erosion Control Inspection Residential Failed 11/9/2021 11/09/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Service Inspection - Residential Passed 5/5/2022 5/5/2022 05/05/2022
Electrical Service Inspection Passed 5/5/2022 5/5/2022 05/05/2022
All Rough Inspection - Residential Failed 5/5/2022 5/5/2022 05/05/2022
Misc
Corrective Action Required
05/05/2022
-address pfh missing double bottom plate -pfh missing king studs -pfh strapping -pfh studs cut at anchor bolts -hold downs at gt truss between garages -hold downs at gt S garage wall -strap top plate S garage wall where lapped less than 24” -strap garage and front entry wall where not tied together -seal gaps at hvac chase garage entry -address and complete framing detail of dining S wall windows -cspf at slider -GB bracing to be inspected at time of completion -seal penetration at master entry -address dryer vent box not code compliant -fire block dryer vent through top plate -seal bottom plate penetration for dryer electrical -hold downs at gt truss in laundry -lateral bracing though out -attach 2x6 scabs in master for trusses per plans -attach h2.5 above deck directly to top plate -seal all penetration in basement throughout -fire block furr down ends in basement and walls into furr down
All Rough Inspection - Residential Failed 5/25/2022 5/25/2022 05/25/2022
Misc
Corrective Action Required
05/05/2022
-address pfh missing double bottom plate -pfh missing king studs -pfh strapping -pfh studs cut at anchor bolts -address and complete framing detail of dining S wall windows -GB bracing to be inspected at time of completion -address dryer vent box not code compliant -seal all penetration in basement throughout -fire block furr down ends in basement and walls into furr down
All Rough Inspection - Residential Failed 6/1/2022 6/1/2022 06/01/2022
Misc
Corrective Action Required
05/25/2022
-GB bracing to be inspected at time of completion. (Call for re inspection when GB bracing is complete) -okay to insulate
All Rough Inspection - Residential Failed 6/9/2022 6/9/2022 06/09/2022
Misc
Corrective Action Required
06/01/2022
-GB bracing to be inspected at time of completion. (Call for re inspection when GB bracing is complete) -okay to insulate
Misc
Corrective Action Required
06/09/2022
INSPECTION DENIED EROSION CONTROL NOT IN COMPLIANCE.
Driveway Inspection Passed 6/9/2022 6/9/2022 06/09/2022
Misc
Informational
06/09/2022
On Thursday, 6-09-2022 I conducted and passed a driveway inspection for placement of concrete.
All Rough Inspection - Residential Failed 6/10/2022 6/10/2022 06/10/2022
Misc
Resolved
06/10/2022
-GB bracing to be inspected at time of completion. (Call for re inspection when GB bracing is complete) -okay to insulate
Misc
Resolved
06/10/2022
INSPECTION DENIED EROSION CONTROL NOT IN COMPLIANCE.
Misc
Corrective Action Required
06/10/2022
-GB bracing not addressed by engineer letter okay. -GB bracing addressed by engineer needs framed to engineer specifications and inspected
All Rough Inspection - Residential Passed 6/10/2022 6/10/2022 06/10/2022
Misc
Resolved
06/10/2022
-GB bracing not addressed by engineer letter okay. -GB bracing addressed by engineer needs framed to engineer specifications and inspected
Occupancy Inspection - Codes Residential Failed 8/18/2022 8/18/2022 08/18/2022
Misc
Corrective Action Required
08/18/2022
-address piers poured without inspection -provide as graded plot plan -sod -check water meter at time of sod -splash blocks and sump pump discharge to extend 36” from foundation -label all non GFCI outlets in unfinished spaces
Plot Plan Inspection Passed 8/23/2022 08/23/2022
Piers/Caissons Inspection - Residential Passed 9/7/2022 09/07/2022
Erosion Control Inspection Residential Passed 9/7/2022 09/07/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/07/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Full C of O 9/7/2022 9/7/2022 09/07/2022
Misc
Resolved
09/07/2022
-check water meter at time of sod -splash blocks and sump pump discharge to extend 36” from foundation -label all non GFCI outlets in unfinished spaces
Documents & Images
Date Uploaded File Type Document Name
07/14/2021 H3 #85 - PERMIT APP
07/14/2021 Approved Plans Approved Drawings
07/14/2021 Approved Plans Approved Truss Layout
07/14/2021 Approved Plans Approved Truss Package
07/14/2021 Permit Codes Residential Plan Review
07/15/2021 Plot Plan Approved Plot Plan
07/15/2021 Permit Codes Residential Plan Review
07/20/2021 Permit DS Building Permit
07/20/2021 Receipt Receipt for transaction:2021-005761
08/17/2021 Letter INSPECTION SUMMARY
09/20/2021 Letter INSPECTION SUMMARY
09/22/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
03/29/2022 Letter Codes 140 Day Letter
04/27/2022 Letter Codes 140 Day Letter
05/05/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/24/2022 85 Hawthorne Ridge Letter
05/25/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/08/2022 85 Hawthorne Ridge Letter 2
06/09/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/22/2022 Plot Plan Approved As Graded Plot Plan
08/31/2022 H3-85 PIERS
08/31/2022 h3-85 piers 2
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter Field Certificate of Occupancy
09/07/2022 Letter Codes Final Certificate of Occupancy
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home