Summary
PRRES20212836
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT -
06/03/2021
06/04/2021
11/30/2021
08/22/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $420.00 $420.00 Paid 06/04/2021
Right of Way Permit Fee $80.00 $80.00 Paid 06/04/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/04/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/04/2021
Water Meter Fee $455.54 $455.54 Paid 06/04/2021
Valuation Fee New Single Family $1,053.26 $1,053.26 Paid 06/04/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/2/2021 (10:00) 7/2/2021 07/02/2021
Underslab Plumbing Inspection - Residential Passed 8/5/2021 8/5/2021 08/05/2021
Sewer Service Inspection - R Passed 8/26/2021 08/26/2021
Water Service Inspection - R Passed 8/27/2021 (9:45) 8/27/2021 08/27/2021
Erosion Control Inspection Residential Failed 8/27/2021 8/27/2021 08/27/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/27/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 1/18/2022 1/18/2022 01/18/2022
Gas Service Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-Gas pressure at 0 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-address overbored stud for SE cable south garage wall -address top plate to top plate connection at intersecting corner as required by code see garage wall, front entry wall -min (4) 2x4 stud pack at all girder truss bearing ends -attic access required -fur out at garage wall to allow for insulation at HVAC -land electrical from stud that has been removed at garage wall -anchor bolts shall be in middle third of bottom plate, see north garage wall -(3) studs required at intersecting corner, see kitchen north exterior wall -fireblock fireplace at great room -secure gas flex line at fireplace -sheath plywood continuous across cripple wall supporting trusses at garage wall -H2.5 truss hold downs at truss ends garage wall -solid block all sheathing breaks at front bedroom -fireblock deadspace front bedroom entry -nail all dbl girder trusses together per plans -H2.5 truss holds down required at dbl girder truss master bed -12” oc nailing at all intersecting corners -secure electrical box to stud at jacuzzi tub master bath -bocca protection plate required at DWV bottom plate master bed bath wall -all truss hangers per plans -all truss lateral bracing per plans -LIB bracing all locations per plans -CS-PF bracing at dining room windows, slider, and master bedroom per plans -Install basement egress window -connect 2x4 laid flat at furred down in finished basement den to floor joist above to support the ceiling load -bocca protection plate at north basement den and basement bedroom closet furred down soffit end Fireblock gap between top plate and framing above egress window basement bedroom -support ceiling load at furred down basement bedroom -solid block between joists every 48” oc at kitchen island per plans -address damaged HVAC duct above basement bed hall -Install joist hangers at basement stair landing, joists over 4’ -nail exterior sheathing per plans
All Rough Inspection - Residential Failed 1/27/2022 1/27/2022 01/27/2022
Misc
Corrective Action Required
01/18/2022
-address overbored stud for SE cable south garage wall -land electrical from stud that has been -sheath plywood continuous across cripple wall supporting trusses at garage wall -H2.5 truss hold downs at truss ends garage wall -fireblock deadspace front bedroom entry -H2.5 truss holds down required at dbl girder truss master bed -all truss hangers per plans -all truss lateral bracing per plans -LIB bracing all locations per plans -Install basement egress window -connect 2x4 laid flat at furred down in finished basement den to floor joist above to support the ceiling load (complete) -bocca protection plate at furred down basement bedroom closet -support ceiling load at furred down basement bedroom -address damaged HVAC duct above basement bed hall
Gas Service Inspection - Residential Passed 1/27/2022 1/27/2022 01/27/2022
Misc
Resolved
01/27/2022
-Gas pressure at 0 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 2/2/2022 2/2/2022 02/02/2022
Misc
Corrective Action Required
01/27/2022
-fireblock deadspace front bedroom entry -all truss hangers per plans (tjc37, thx 57) -all truss lateral bracing per plans -bocca protection plate at furred down basement bedroom closet
All Rough Inspection - Residential Passed 2/11/2022 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
-fireblock deadspace front bedroom entry -all truss hangers per plans (tjc37, tjc57) -all truss lateral bracing per plans -bocca protection plate at furred down basement bedroom closet
Driveway Inspection Passed 3/25/2022 3/25/2022 03/25/2022
Misc
Informational
03/25/2022
On Friday, 3-25-2022 I performed a driveway inspection, curb and sidewalk inspection and passed items for concrete placement.
Sidewalk Inspection Passed 3/25/2022 3/25/2022 03/25/2022
Misc
Informational
03/25/2022
On Friday, 3-25-2022 a sidewalk inspection was preformed and passed inspection for concrete to be placed.
Erosion Control Inspection Residential Failed 5/12/2022 05/12/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Temporary C of O 5/12/2022 5/12/2022 05/12/2022
Misc
Corrective Action Required
05/12/2022
TCO Until 5/13/22 -sod -splash block and sump pump discharge to extend 36" from foundation -check water meter and meter well height at time of sod -check siding from grade at back of lot
Occupancy Inspection - Codes Residential Failed 5/31/2022 5/31/2022 05/31/2022
Misc
Corrective Action Required
05/12/2022
-provide as graded plot plan
Plot Plan Inspection Passed 8/16/2022 08/16/2022
Erosion Control Inspection Residential Passed 8/22/2022 08/22/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/22/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Full C of O 8/22/2022 8/22/2022 08/22/2022
Misc
Resolved
08/22/2022
-provide as graded plot plan
Documents & Images
Date Uploaded File Type Document Name
06/03/2021 Approved Plans APPROVED PLANS
06/03/2021 Approved Plans APPROVED PLOT PLAN
06/03/2021 Approved Plans APPROVED TRUSS DRAWINGS
06/03/2021 Approved Plans APPROVED TRUSS LAYOUT
06/03/2021 Permit Codes Residential Plan Review
06/03/2021 HT #147 - PERMIT APP
06/04/2021 Permit Codes Residential Plan Review
06/04/2021 Permit DS Building Permit
06/04/2021 Receipt Receipt for transaction:2021-003980
07/02/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/26/2022 147 Hawthorne Ridge Over bored stud and blocking omission letter
01/27/2022 Letter INSPECTION SUMMARY
01/27/2022 Letter INSPECTION SUMMARY
01/27/2022 Letter INSPECTION SUMMARY
02/02/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter Codes Temporary Certificate of Occupancy
05/31/2022 Letter INSPECTION SUMMARY
08/15/2022 LOT 147- FINAL ASBUILT
08/15/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
08/22/2022 Letter Codes Final Certificate of Occupancy
08/22/2022 Letter Field Certificate of Occupancy
08/22/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home