Permit Application Status

PRRES20212708


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212708
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED PATIO
05/25/2021
08/17/2021
11/22/2021
10/25/2023
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Julie Pitts, Address:10707 Indiana Ave  
COMFORT SYSTEMS HTG/CLG, Address:17232 BEL-RAY PL, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/17/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 08/17/2021
9110078-Valuation Fee New Single Family $1,237.63 $1,237.63 Paid 08/17/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 08/17/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 08/17/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 08/17/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/19/2023
$75.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 9/2/2021 (9:00) 9/2/2021 09/02/2021
Water Service Inspection - R Passed 9/3/2021 9/3/2021 09/03/2021
Underslab Plumbing Inspection - Residential Failed 9/9/2021 9/9/2021 09/09/2021
Misc
Corrective Action Required
09/09/2021
INSPECTION DENIED. EROSION CONTROL SHALL BE IN COMPLIANCE. INSTALL EROSION CONTROL ALONG THE STREET. PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE
Erosion Control Inspection Residential Failed 9/9/2021 09/09/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. **INSPECTION DENIED. EROSION CONTROL SHALL BE IN COMPLIANCE. INSTALL EROSION CONTROL ALONG THE STREET. PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE
Underslab Plumbing Inspection - Residential Passed 9/22/2021 9/22/2021 09/22/2021
Misc
Corrective Action Required
09/09/2021
INSPECTION DENIED. EROSION CONTROL SHALL BE IN COMPLIANCE. INSTALL EROSION CONTROL ALONG THE STREET. PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE
Piers/Caissons Inspection - Residential Passed 10/8/2021 (9:00) 10/8/2021 10/08/2021
All Rough Inspection - Residential Failed 1/27/2022 1/27/2022 01/27/2022
Misc
Corrective Action Required
01/27/2022
INSPECTION DENIED, EROSION CONTROL NOT IN COMPLIANCE -EROSION CONTROL REQUIRED AT FRONT OF LOT -MAINTAIN GRAVEL FILTER ON DRIVE, 6" LIFT REQUIRED TO PREVENT MUD TRACKING
Erosion Control Inspection Residential Failed 1/27/2022 1/27/2022 01/27/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. INSPECTION DENIED, EROSION CONTROL NOT IN COMPLIANCE -EROSION CONTROL REQUIRED AT FRONT OF LOT -MAINTAIN GRAVEL FILTER ON DRIVE, 6" LIFT REQUIRED TO PREVENT MUD TRACKING
All Rough Inspection - Residential Failed 2/3/2022 2/3/2022 02/03/2022
Misc
Corrective Action Required
01/27/2022
**EROSION CONTROL SHALL BE INSTALLED ALONG THE STREET AND ALONG THE DOWNSTREAM PROPERTY LINE -At 1st fl front bedroom closet, staple wiring min 1.25” away from stud nailing surface -Security blocking for rear exterior door -Nail siding at step flashings on 2nd fl bedroom -Install hangers for ceiling beam connections above 2nd fl bathroom -Fb 2nd fl duct chase from roof -Add another strut to support ridge above 2nd fl or install rafter tie -Brace end of lvl roof beam from rotation -Solid block ends of joists above garage -Fb laundry wall and duct chase from ceiling space above master shower; Fb laundry/garage wall from garage soffit -Seal all penetrations of return air space -Protect water line at master bathroom/closet wall top plate; Protect plumbing at master bedroom/toilet bottom wall plate -Fb fireplace space at gap -Solid block underneath all point loads at laundry wall down to I beam below -Pan off return air space above basement rec rm/bedroom wall from soffit space. Seal all penetrations -Install 4” duct for basement bathroom fan. See IRC table 1504 -Fb basement closet wall from fur down ceiling space. Foam gap at top -Block cantilevered joists **OK TO INSULATE
Electrical Service Inspection Passed 1/27/2022 2/3/2022 02/03/2022
Gas Service Inspection - Residential Failed 1/27/2022 2/3/2022 02/03/2022
Misc
Corrective Action Required
02/03/2022
No pressure
Erosion Control Inspection Residential Passed 2/9/2022 02/09/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/09/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. INSPECTION DENIED, EROSION CONTROL NOT IN COMPLIANCE -EROSION CONTROL REQUIRED AT FRONT OF LOT -MAINTAIN GRAVEL FILTER ON DRIVE, 6" LIFT REQUIRED TO PREVENT MUD TRACKING
Gas Service Inspection - Residential Failed 2/9/2022 2/9/2022 02/09/2022
Misc
Corrective Action Required
02/03/2022
No pressure **still at zero pressure
All Rough Inspection - Residential Failed 2/9/2022 2/9/2022 02/09/2022
Misc
Corrective Action Required
02/03/2022
-At 1st fl front bedroom closet, staple wiring min 1.25” away from stud nailing surface -Security blocking for rear exterior door -Install hangers for ceiling beam connections above 2nd fl bathroom -Fb 2nd fl duct chase from roof -Add another strut to support ridge above 2nd fl or install rafter tie -Brace end of lvl roof beam from rotation -Solid block ends of joists above garage -Fb laundry wall and duct chase from ceiling space above master shower; Fb laundry/garage wall from garage soffit -Seal all penetrations of return air space -Protect water line at master bathroom/closet wall top plate; Protect plumbing at master bedroom/toilet bottom wall plate -Fb fireplace space at gap -Solid block underneath all point loads at laundry wall down to I beam below -Pan off return air space above basement rec rm/bedroom wall from soffit space. Seal all penetrations -Install 4” duct for basement bathroom fan. See IRC table 1504 -Fb basement closet wall from fur down ceiling space. Foam gap at top **OK TO INSULATE **2/9/22-THIS IS A 2ND FAILED INSPECTION
All Rough Inspection - Residential Not Ready 2/15/2022 02/15/2022
Misc
Corrective Action Required
02/09/2022
-At 1st fl front bedroom closet, staple wiring min 1.25” away from stud nailing surface -Install hangers for ceiling beam connections above 2nd fl bathroom -Add another strut to support ridge above 2nd fl or install rafter tie -Brace end of lvl roof beam from rotation **2nd fl -Fb laundry wall and duct chase from ceiling space above master shower -Seal all penetrations of return air space -Protect water line at master bathroom/closet wall top plate -Pan off return air space above basement rec rm/bedroom wall from soffit space. Seal all penetrations -Install 4” duct for basement bathroom fan. See IRC table 1504 **OK TO INSULATE **2/9/22-THIS IS A 2ND FAILED INSPECTION **2/15/22-THIS IS A 3RD FAILED INSPECTION. NOT READY FEE ASSESSED
Gas Service Inspection - Residential Failed 2/15/2022 02/15/2022
Misc
Corrective Action Required
02/09/2022
No pressure **pressure currently at 6 psi. Min 10 psi required for testing
All Rough Inspection - Residential Passed 2/22/2022 2/22/2022 02/22/2022
Misc
Resolved
02/22/2022
**2/9/22-THIS IS A 2ND FAILED INSPECTION **2/15/22-THIS IS A 3RD FAILED INSPECTION. NOT READY FEE ASSESSED
Gas Service Inspection - Residential Passed 2/22/2022 2/22/2022 02/22/2022
Misc
Resolved
02/22/2022
No pressure **pressure currently at 6 psi. Min 10 psi required for testing
Driveway Inspection Partial 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/22/2022
4-22-22 AN forms are in place and aggregate is present and compacted
Driveway Inspection Passed 4/25/2022 4/25/2022 04/25/2022
Misc
Informational
04/22/2022
4-22-22 AN forms are in place and aggregate is present and compacted
Misc
Informational
04/25/2022
4-25-22 AN driveway looks good and has expansion joints at curb and right of way . Meets Ada spec
Footing Inspection - Residential Passed 09/12/2022
Informational
09/12/2022
FOOTING APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 2/8/2023 2/8/2023 02/08/2023
Misc
Corrective Action Required
02/08/2023
**TCO CANNOT BE ISSUED UNTIL OTHER EXPIRED TCO PERMITS ARE CLOSED -Sidewalk not approved on record -Not ready fee issued on 2/15/22 has not been paid -Sewer manhole at front of lot, adjacent to driveway, is buried -Sump pump extension -Install tamper-proof caps at AC valves -Provide sewer tracer wire port at grade -Provide min 6” clearance from bottom of siding to grade -Install splash blocks -Install and fasten ladder to window well -Garage stair handrail profile not per code -Master bathroom pendant light cannot be located inside bath tub zone -Stair sconce light protruding more than 4” from wall; or move light min 6’8” above stair -Remove all foundation wall ties -Provide breaker lock for out of sight water heater -Complete water heater electrical -Secure lawn irrigation pex line every 32” -Support furnace intake&exhaust pipes every 5 ft or less -Fb floor penetration under master bathroom tub
Sidewalk Inspection Failed 4/6/2023 04/06/2023
Misc
Corrective Action Required
04/06/2023
4-6-2023 NS. Site visited the sidewalk and driveway passed city standards. But the water valve needs to have the tracer wire fix before I can pass this.
Sidewalk Inspection Partial 4/20/2023 4/25/2023 04/25/2023
Misc
Corrective Action Required
04/06/2023
4-6-2023 NS. Site visited the sidewalk and driveway passed city standards. But the water valve needs to have the tracer wire fix before I can pass this. 4-25-23 NS site visited and nothing has been fixed.
Occupancy Inspection - Codes Residential Failed 7/18/2023 07/18/2023
Misc
Corrective Action Required
02/08/2023
**TCO CANNOT BE ISSUED UNTIL OTHER EXPIRED TCO PERMITS ARE CLOSED -Sidewalk not approved on record -Not ready fee issued on 2/15/22 has not been paid -Sewer manhole at front of lot, adjacent to driveway, is buried -Sump pump extension -Install tamper-proof caps at AC valves -Provide sewer tracer wire port at grade -Provide min 6” clearance from bottom of siding to grade -Install splash blocks -Install and fasten ladder to window well -Garage stair handrail profile not per code -Master bathroom pendant light cannot be located inside bath tub zone -Stair sconce light protruding more than 4” from wall; or move light min 6’8” above stair -Remove all foundation wall ties -Provide breaker lock for out of sight water heater -Secure lawn irrigation pex line every 32” -Support furnace intake&exhaust pipes every 5 ft or less -Fb floor penetration under master bathroom tub
Sidewalk Inspection Passed 7/19/2023 7/19/2023 07/25/2023
Misc
Corrective Action Required
04/25/2023
4-6-2023 NS. Site visited the sidewalk and driveway passed city standards. But the water valve needs to have the tracer wire fix before I can pass this. 4-25-23 NS site visited and nothing has been fixed. 7-21-23 NS Site visited and the sidewalk has been finished and poured. I checked the ADA and it appears that sidewalk passes
Occupancy Inspection - Codes Residential Failed 10/20/2023 10/20/2023
Misc
Partial Correction
10/20/2023
**TCO CANNOT BE ISSUED UNTIL OTHER EXPIRED TCO PERMITS ARE CLOSED -Provide sewer tracer wire port at grade -Provide min 6” clearance from bottom of siding to grade -Secure bottom bracket of railing at basement stairs
Occupancy Inspection - Codes Residential Failed 10/24/2023 10/24/2023 10/24/2023
Misc
Partial Correction
10/20/2023
-Provide min 6” clearance from bottom of siding to grade -Secure bottom handrail support bracket of basement stair
Occupancy Inspection - Codes Residential Full C of O 10/25/2023 10/25/2023 10/25/2023
Misc
Resolved
10/25/2023
-Provide min 6” clearance from bottom of siding to grade -Secure bottom handrail support bracket of basement stair
Documents & Images
Date Uploaded File Type Document Name
05/25/2021 Application Form Permit Application
05/25/2021 Application Form License Tax Form
05/26/2021 Approved Plans Approved Drawings
05/26/2021 Permit Codes Residential Plan Review
08/17/2021 Plot Plan Approved Plot Plan
08/17/2021 Permit Codes Residential Plan Review
08/17/2021 Permit DS Building Permit
08/17/2021 Receipt Receipt for transaction: 2021-006595
08/23/2021 M L Crose 4705 NE Freehold Dr LSMO Monticello Lot 109 NZC P 2021-2708 3rd Party Footing Inspection Report 8-20-21
09/02/2021 Letter INSPECTION SUMMARY
09/03/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/22/2021 Letter INSPECTION SUMMARY
10/04/2021 Approved Plans Approved Revised Drawings
10/08/2021 Letter INSPECTION SUMMARY
01/27/2022 Letter INSPECTION SUMMARY
01/27/2022 Letter INSPECTION SUMMARY
02/03/2022 Letter INSPECTION SUMMARY
02/03/2022 Letter INSPECTION SUMMARY
02/03/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
10/19/2023 Receipt Receipt for transaction: 2023-007893
10/20/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/25/2023 Letter Field Certificate of Occupancy
10/25/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home