NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 08/30/2021 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 11/30/2021 12:00 AM by username 'Khanh Nguyen'.
05/13/2021
06/07/2021
11/14/2021
06/29/2022
Locations
Contacts
DAVE RICHARDS HOMEBUILDING INC, Address:605 SW US HIGHWAY 40 #414, Phone:(816) 365-8034  
DAVE3@DAVERICHARDSHOMES.COM  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,089.31 $1,089.31 Paid 06/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/07/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/07/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/07/2021
$0.00 $0.00 $0.00 N/A
$0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 07/26/2021
Informational
07/26/2021
FOOTING APPROVED BY ENGINEER
Underslab Plumbing Inspection - Residential Passed 7/26/2021 7/26/2021 07/26/2021
Erosion Control Inspection Residential Failed 8/25/2021 08/25/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. **PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE AND REPAIR THE SILT FENCE AT BACK OF LOT
Erosion Control Inspection Residential Failed - Stop Work 8/30/2021 08/30/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. **PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE AND REPAIR THE SILT FENCE AT BACK OF LOT
Erosion Control Inspection Residential Failed - Stop Work 11/19/2021 11/19/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/30/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. **PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE AND REPAIR THE SILT FENCE AT BACK OF LOT
Water Service Inspection - R Failed - Stop Work 11/19/2021 11/19/2021
Misc
Corrective Action Required
11/19/2021
MIN 3/4" GRAVEL IS NOT PROVIDED AT DRIVEWAY. ALSO WATER IS NOT EVEN READY FOR INSPECTION
Erosion Control Inspection Residential Failed 11/23/2021 11/23/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/19/2021
**PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE. SPREAD OUT THE GRAVEL TO THE STREET CURVE
Water Service Inspection - R Failed 11/23/2021 (8:00) 11/23/2021 11/23/2021
Misc
Corrective Action Required
11/19/2021
MIN 3/4" GRAVEL IS NOT PROVIDED AT DRIVEWAY. SPREAD OUT THE GRAVEL TO THE STREET CURB.
Erosion Control Inspection Residential Passed 11/30/2021 11/30/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
11/30/2021
**PROVIDE MIN 3/4" GRAVEL AT LOT ENTRANCE. SPREAD OUT THE GRAVEL TO THE STREET CURVE
Water Service Inspection - R Passed 11/30/2021 11/30/2021
Misc
Resolved
11/30/2021
MIN 3/4" GRAVEL IS NOT PROVIDED AT DRIVEWAY. SPREAD OUT THE GRAVEL TO THE STREET CURB.
Electrical Service Inspection Passed 11/30/2021 11/30/2021 11/30/2021
All Rough Inspection - Residential Failed 11/30/2021 11/30/2021 11/30/2021
Misc
Corrective Action Required
11/30/2021
**REPAIR EROSION CONTROL AT REAR -Nail siding to sill plates 6” oc; nail siding at bottom edge 6” oc -Provide a receptacle within 25 ft of AC -Provide rear yard flood light -Anchor short perpendicular wall to garage PFH wall -Fb laundry and mud walls from roof -Overfilled 2-gang box at hallway/mud -Install roof flashings for vents -Provide a wall receptacle at master bedroom wall longer than 24” -Repair torn vapor barrier at rear master bedroom wall -Seal return air space at top of master bedroom/living room wall -Fb gap at electrical fireplace space -Complete installing electrical fireplace -Nail corner studs per code -Security blocking for deck door -Install joist hanger at kitchen I beam connection; above main floor bathroom -Roof purlins support cannot be spaced no more than 4 ft -Gap below front porch roof beam at front bedroom wall corner -Provide solid support underneath kitchen I beam point loads at both ends. Extend full stud support at exterior end down to basement foundation stem wall -Complete wiring make up inside boxes -Provide vapor barrier at basement door -Security blocking for basement door; shim gap at strike plate side with solid wood per security code -Fb basement wall from joist space; Fb wall vertically every ten ft or less; fb wall from soffits -Overfilled box at bottom stair landing -Toe nail basement ceiling joists to sill plates and top plates per code -Anchor basement columns -Plumbing outside wall space in basement bathroom -Protect shower vent at basement bathroom wall -Steel column not fully underneath I beam at stair corner **DO NOT INSULATE
Gas Service Inspection - Residential Passed 11/30/2021 11/30/2021 11/30/2021
All Rough Inspection - Residential Failed 1/3/2022 1/3/2022 01/03/2022
Misc
Corrective Action Required
11/30/2021
**REPAIR EROSION CONTROL AT REAR -Fb laundry and mud walls from roof **not done. Fb the double stud wall -Install roof flashings for vents -Complete installing electrical fireplace -Fb basement wall from joist space; Fb wall vertically every ten ft or less **staple in place insulation used as fire blocking material -Protect shower vent at basement bathroom wall -Steel column not fully underneath I beam at stair corner **just add a couple of studs **OK TO INSULATE
All Rough Inspection - Residential Passed 2/14/2022 2/14/2022 02/14/2022
Misc
Resolved
02/14/2022
**REPAIR EROSION CONTROL AT REAR -Fb basement wall from joist space; Fb wall vertically every ten ft or less **staple in place insulation used as fire blocking material -Protect shower vent at basement bathroom wall **OK TO INSULATE
Driveway Inspection Partial 4/26/2022 04/26/2022
Misc
Informational
04/26/2022
4-26-22 AN forms are in place and aggregate is present and compacted
Sidewalk Inspection Partial 4/26/2022 04/26/2022
Misc
Informational
04/26/2022
4-26-22 AN forms are in place and aggregate is present and compacted
Driveway Inspection Passed 4/29/2022 4/29/2022 04/28/2022
Misc
Informational
04/26/2022
4-26-22 AN forms are in place and aggregate is present and compacted
Misc
Informational
04/28/2022
4-28-22 an driveway looks good and has expansion joints at curb and right of way. Meets Ada spec
Sidewalk Inspection Partial 4/29/2022 4/29/2022 04/28/2022
Misc
Informational
04/28/2022
4-26-22 an forms are in place and aggregate is present and compacted
Sidewalk Inspection Passed 04/28/2022
Misc
Informational
04/28/2022
4-26-22 an forms are in place and aggregate is present and compacted
Misc
Informational
04/28/2022
4-28-22 an sidewalk looks good and meets Ada spec
Erosion Control Inspection Residential Failed 04/28/2022
Miscellaneous Correction
Corrective Action Required
04/28/2022
4-28-28 AN storm inlet need to be cleaned out
Occupancy Inspection - Codes Residential Failed 5/10/2022 5/10/2022 05/10/2022
Misc
Corrective Action Required
05/10/2022
**RESTORE EROSION CONTROL ALONG THE REAR OF LOT. NO FURTHER INSPECTION IF EROSION CONTROL IS NOT IN COMPLIANCE -Sewer and piers not inspected and approved on record -Water meter and sewer clean out at front are buried and shall be at final grade level -Final grade, sod, downspout and sump pump extension -Provide guardrail at open side of stoop more than 30” above grade, as measured 36” horizontal out from stoop edge down to grade -Complete deck. Piers were not inspected by city; posts shall be notched for deck beam connections and the beam-to-post connection be connected with two 1/2” through bolts. Have engineer address this; complete installing and nailing all hangers; complete stair, etc -Screw the exterior doors embedded jamb brace into studs through the 4 pre drilled holes with min 3” screws -Cut off the excessive ufer rebar to safe height
Erosion Control Inspection Residential Failed 5/2/2022 5/10/2022 05/10/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/10/2022
DEFICIENT EROSION CONTROL INSTALLATION ALONG THE REAR OF LOT. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Occupancy Inspection - Codes Residential Temporary C of O 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/10/2022
-Final grade, sod, downspout and sump pump extension -Strap outer posts-beam-post connections
Sewer Service Inspection - R Passed 06/29/2022
Erosion Control Inspection Residential Passed 06/29/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/29/2022
DEFICIENT EROSION CONTROL INSTALLATION ALONG THE REAR OF LOT. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Occupancy Inspection - Codes Residential Full C of O 06/29/2022
Misc
Resolved
06/29/2022
-Final grade, sod, downspout and sump pump extension -Strap outer posts-beam-post connections
Documents & Images
Date Uploaded File Type Document Name
05/13/2021 Application Form Permit Application
05/13/2021 Application Form License Tax Form
05/18/2021 Permit Codes Residential Plan Review
05/18/2021 Plot Plan Approved Plot Plan
05/19/2021 Approved Plans Approved Drawings
05/26/2021 Permit Codes Residential Plan Review
06/07/2021 Permit DS Building Permit
06/07/2021 Receipt Receipt for transaction:2021-004072
06/14/2021 Garys Fndn 4729 NE Freehold Dr Lee's Summit Mo Footing Inspection Report 6-14-21
07/26/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter Stop Work Order
08/30/2021 Letter Stop Work Order
11/19/2021 Letter Stop Work Order
11/19/2021 Letter Stop Work Order
11/23/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
01/03/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/11/2022 Final_2022_04_15_DPier_LSMO_Pat Cochran Concrete
05/11/2022 Letter Codes Temporary Certificate of Occupancy
06/29/2022 Letter Codes Final Certificate of Occupancy
06/29/2022 Letter Field Certificate of Occupancy
06/29/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home