Summary
PRRES20211979
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED/UNCOVERED DECK WALKOUT/WALKUP STOP WORK ORDER generated on 06/02/2021 12:00 AM by username 'Robb Popp'. STOP WORK ORDER removed on 07/09/2021 12:00 AM by username 'Robb Popp'.
04/22/2021
05/13/2021
10/20/2021
04/17/2023
Locations
Contacts
TRUMARK HOMES, LLC, Address:PO BOX 728, Phone:(816) 564-5613  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARKHOMES.MARK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 05/04/2021 04/30/2021
Kim Brennan
Residential Plan Review Approved 05/04/2021 04/30/2021
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
04/30/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide square footage for uncovered deck
Misc
Corrective Action Required
04/30/2021

Address is wrong on all pages
Plot Plan Review Approved 04/27/2021 04/26/2021
Kim Brennan
Deck location
Corrective Action Required
04/23/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show the covered/uncovered deck
Basement opening elevations
Corrective Action Required
04/23/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan.
As-graded plot plan
Corrective Action Required
04/23/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Lot elevations
Corrective Action Required
04/23/2021

Existing and finish elevations at all property corners must be provided on the plot plan. The left front and left rear property corners are not consistent with the MDP.
Planning Review (RES) Approved 04/27/2021 04/23/2021
Kim Brennan
Residential Plan Review Rejected 04/27/2021 04/23/2021
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
04/23/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide square footage for uncovered deck
Misc
Corrective Action Required
04/23/2021

Address is wrong on all pages
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,109.71 $1,109.71 Paid 05/12/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 05/12/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/12/2021
8331507-Sewer Connection Fee $630.00 $630.00 Paid 05/12/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 05/12/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 05/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/14/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/14/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/14/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 05/12/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/12/2021
5-12-21 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -EROSION CONTROL IS REQUIRED AS SOON AS LAND DISTURBANCE BEGINS AND MUST BE MAINTAINED UNTIL FINAL COMPLETION -PROVIDE ADEQUATE EROSION CONTROL AT PERIMETER OF LOT, AROUND STOCKPILES, AND GRAVEL DRIVE WITH 3/4' GRAVEL IN MIN. 6" LIFT -REPLACE OVERGROWN GUTTER BUDDY AT STORM INLET
Footing Inspection - Residential Passed 5/17/2021 5/17/2021 05/17/2021
Misc
Informational
05/17/2021
-FOOTING INSPECTION COMPLETED BY DAVID AINSWORTH ON 5-14
Erosion Control Inspection Residential Partial 5/17/2021 5/17/2021 05/17/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
05/17/2021
5-12-21 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -EROSION CONTROL IS REQUIRED AS SOON AS LAND DISTURBANCE BEGINS AND MUST BE MAINTAINED UNTIL FINAL COMPLETION -PROVIDE ADEQUATE EROSION CONTROL AT PERIMETER OF LOT, AROUND STOCKPILES, AND GRAVEL DRIVE WITH 3/4' GRAVEL IN MIN. 6" LIFT -REPLACE OVERGROWN GUTTER BUDDY AT STORM INLET
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/17/2021
5-17 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -REPLACE OVERGROWN GUTTER BUDDY AT STORM INLET
Foundation Inspection - Residential Failed - Stop Work 6/2/2021 06/02/2021
Miscellaneous Correction
Corrective Action Required
06/02/2021
-Provide elevation shots at top of wall and lower walk up wall for evaluation
Plot Plan Inspection Failed 6/8/2021 06/08/2021
Misc
Corrective Action Required
06/08/2021
The submitted plot plan is below the MBOE and below the MDP. Before we can lift the Stop Construction order the plot plan and foundation wall need to be corrected. This issue was communicated with you by Robb Popp prior to pouring the foundation wall by phone and email on 5/19/2021.
Foundation Inspection - Residential Passed 07/09/2021
Miscellaneous Correction
Resolved
07/09/2021
-Provide elevation shots at top of wall and lower walk up wall for evaluation
Underslab Plumbing Inspection - Residential Passed 7/20/2021 7/20/2021 07/20/2021
Miscellaneous Correction
Corrective Action Required
07/20/2021
-POST ADDRESS
Sewer Service Inspection - R Passed 08/19/2021
Water Service Inspection - R Passed 08/20/2021
Erosion Control Inspection Residential Failed 08/23/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/17/2021
*8-23-21 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. *8-23-21 -RESTORE EROSION CONTROL AT PERIMETER OF LOT, REMOVE TRASH AND DEBRIS FROM SITE
All Rough Inspection - Residential Failed 9/13/2021 09/13/2021
Miscellaneous Correction
Corrective Action Required
09/13/2021
*9-13-21 Portal Frame inspection: -Nail sill plate 3" OC per code/plans -Solid block and nail horizontal panel splices per code-SEE R602.10.6.2 AND PLANS -(2) rows 16d sinkers 3" oc at top plate to header connection per code-SEE PLANS -(2) Bottom plates and min (1) 5/8" diameter anchor bolt required per plan and code-SEE DETAIL ON PLANS OR REFER TO R602.10.6.2 -Restore erosion control at front of lot and clean debris from storm inlet and street before any further inspections DO NOT COVER
Erosion Control Inspection Residential Failed 09/13/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/23/2021
*9-13-21 Restore erosion control at front of lot and clean debris from storm inlet and street immediately. No further inspecitons will be performed until complete
Driveway Inspection Passed 10/22/2021 10/22/2021 10/22/2021
Misc
Informational
10/22/2021
On Friday 10-22-2021. I performed a driveway inspection and passed forming and sub-grade for concrete placement.
Gas Service Inspection - Residential Passed 11/3/2021 11/03/2021
Electrical Service Inspection Passed 11/3/2021 11/03/2021
All Rough Inspection - Residential Failed 11/3/2021 11/03/2021
Miscellaneous Correction
Corrective Action Required
09/13/2021
-2 rows 16d sinkers 3” oc at top plate to header at PFH -Nails in strap at PFH -Tighten anchor bolts garage -Seal plate penetration top plate at dryer duct and nm for dryer -Provide proper slope at vent in attic above laundry -Nail corner and intersecting wall studs per code -Strap top plates not lapped 24” at exterior wall corner master bed bath -Address LVL hip landing on multiple blocks at master bed -Seal top plate penetrations in bath/bed 2, bed 2 west wall -Seal through floor penetrations at kitchen island -Have engineer clarify size and number of studs required at all beams as not noted on plans -Anchor steel columns -Address holes bored closer than 2” and closer than 2” to bottom of triple joists in bed 3 -Seal joist penetration at return air in bed 5 -Fireblock ceiling line in hallway between bed 4/5 -Complete nailing pattern on exterior sheathing
All Rough Inspection - Residential Failed 11/12/2021 11/12/2021 11/12/2021
Miscellaneous Correction
Corrective Action Required
11/03/2021
-2 rows 16d sinkers 3” oc at top plate to header at PFH -Nail corner and intersecting wall studs per code -Address LVL hip landing on multiple blocks at master bed -Seal top plate penetration living room/ bath 2 -Seal through floor penetrations at kitchen island -Have engineer clarify size and number of studs required at all beams as not noted on plans -Address holes bored closer than 2” and closer than 2” to bottom of triple joists in bed 3(provide engineered letter for fix) -Seal joist penetration at return air in bed 5 -Fireblock ceiling line in hallway between bed 4/5 -address return air panning in hallway between bed 4/5 -Complete nailing pattern on exterior sheathing
All Rough Inspection - Residential Failed 11/19/2021 11/19/2021 11/19/2021
Miscellaneous Correction
Corrective Action Required
11/12/2021
-Address LVL hip landing on multiple blocks at master bed -Seal through floor penetrations at kitchen island -Have engineer clarify size and number of studs required at all beams as not noted on plans -Address holes bored closer than 2” and closer than 2” to bottom of triple joists in bed 3(provide engineered letter for fix) -Seal joist penetration at return air in bed 5 -address return air panning in hallway between bed 4/5
All Rough Inspection - Residential Not Ready 11/22/2021 11/22/2021 11/22/2021
Miscellaneous Correction
Corrective Action Required
11/19/2021
-Address LVL hip landing on multiple blocks at master bed -Have engineer clarify size and number of studs required at all beams as not noted on plans -Address holes bored closer than 2” and closer than 2” to bottom of triple joists in bed 3(provide engineered letter for fix) -Seal joist and pan off penetration at return air in bed 5 -address return air panning in hallway between bed 4/5
All Rough Inspection - Residential Passed 11/24/2021 11/24/2021
Miscellaneous Correction
Resolved
11/24/2021
Sidewalk Inspection Passed 12/22/2021
Misc
Informational
12/22/2021
On 12-22-2021, I performed a sidewalk inspection and passed the concrete placement.
Occupancy Inspection - Codes Residential Failed 6/8/2022 06/08/2022
Misc
Corrective Action Required
06/08/2022
-resolve outstanding inspection fees -submit as graded plot plan for review and approval -final grade and sod -splash blocks -provide faucet/complete plumbing at kitchen sink -provide hammer arrestors at laundry -provide (2) 1/2” through bolts each post/beam connection at deck -handrail must return at stairs to basement patio -provide security screws at basement walkout door
Plot Plan Inspection Passed 6/22/2022 06/22/2022
Misc
Resolved
06/22/2022
The submitted plot plan is below the MBOE and below the MDP. Before we can lift the Stop Construction order the plot plan and foundation wall need to be corrected. This issue was communicated with you by Robb Popp prior to pouring the foundation wall by phone and email on 5/19/2021. Email and phone message was sent to Mark@trumark.MARK HARDING 06/08/2021 9:52 AM
Occupancy Inspection - Codes Residential Full C of O 4/17/2023 4/17/2023 04/17/2023
Misc
Resolved
04/17/2023
-resolve outstanding inspection fees -submit as graded plot plan for review and approval -final grade and sod -splash blocks -provide faucet/complete plumbing at kitchen sink -provide hammer arrestors at laundry -provide (2) 1/2” through bolts each post/beam connection at deck -handrail must return at stairs to basement patio -provide security screws at basement walkout door
Documents & Images
Date Uploaded File Type Document Name
04/22/2021 Application Form Permit Application and License Tax Form
04/22/2021 LOT 4 COBEY CREEK SEALED PLANS
04/23/2021 Letter Codes Residential Plan Review
04/26/2021 Plot Plan Approved Plot Plan
04/30/2021 Approved Plans Approved Drawings
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Permit DS Building Permit
05/13/2021 Receipt Receipt for transaction:2021-002973
05/14/2021 Garys Fndn 516 SE David Rd Lee's Summit Mo Cobey Creek Lot 4 3rd Party Footing Inspection Report 5-14-21
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter Stop Work Order
06/08/2021 Letter INSPECTION SUMMARY
06/21/2021 Engineer Report/Study Cobey Creek Engineer letter
07/03/2021 LOT 4 COLBY ENGINERR LETTER
07/07/2021 Plot Plan Approved Revised Plot Plan
07/09/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
09/13/2021 Letter INSPECTION SUMMARY
09/13/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/22/2021 516 SE David Rd LSMO Lot 4 Colby Creek Construction Issues Inspection Report 11-5-21
11/24/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/14/2022 Receipt Receipt for transaction:2022-004705
06/20/2022 Mark Yancik 512 SE David Rd LSMO Lot 3 Steel Bm Substitution for triple LVL Report 10-28-21
06/21/2022 Plot Plan Approved As Graded Plot Plan
06/22/2022 Letter INSPECTION SUMMARY
06/27/2022 Scan_0054
01/26/2023 Letter Codes 180 Day Letter
04/17/2023 Letter Field Certificate of Occupancy
04/17/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home