Summary
PRRES20211978
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED/UNCOVERED DECK
04/22/2021
06/14/2021
01/18/2023
Locations
Contacts
TRUMARK HOMES, LLC, Address:PO BOX 728, Phone:(816) 564-5613  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARKHOMES.MARK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/27/2021 05/12/2021
Kim Brennan
Deck location
Corrective Action Required
04/23/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please indicate where the covered/uncovered deck is.
Residential Plan Review Approved 04/27/2021 04/30/2021
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
04/23/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide square footage for uncovered deck
Planning Review (RES) Approved 04/27/2021 04/23/2021
Shannon McGuire
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,109.71 $1,109.71 Paid 06/12/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/12/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/12/2021
8331507-Sewer Connection Fee $630.00 $630.00 Paid 06/12/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/12/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 11/19/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 6/16/2021 6/16/2021 06/16/2021
Miscellaneous Correction
Corrective Action Required
06/16/2021
-Remove MBOE from plot plan and resubmit for approval as per conversations with Kim Brennan
Underslab Plumbing Inspection - Residential Failed 6/22/2021 6/22/2021 06/22/2021
Miscellaneous Correction
Corrective Action Required
06/22/2021
Not ready for inspection-no plumbing installed -Post address -Clean debris from street
Water Service Inspection - R Failed 8/12/2021 (8:00) 8/12/2021 08/12/2021
Misc
Corrective Action Required
08/12/2021
-10' of copper required from meter to house -Bed copper lines and meter pit in gravel -Complete pex to line to house -Ensure that meter pit is at proper elevation and provide 14" to 18" from top of meter to top of can
Underslab Plumbing Inspection - Residential Passed 8/17/2021 08/17/2021
Miscellaneous Correction
Resolved
08/17/2021
Not ready for inspection-no plumbing installed -Post address -Clean debris from street
Sewer Service Inspection - R Failed 8/18/2021 08/18/2021
Misc
Corrective Action Required
08/18/2021
UNCOVER SWEWER LINE AND TRACER WIRE
Water Service Inspection - R Partial 8/18/2021 08/18/2021
Misc
Resolved
08/18/2021
-10' of copper required from meter to house -Bed copper lines and meter pit in gravel -Complete pex to line to house -Ensure that meter pit is at proper elevation and provide 14" to 18" from top of meter to top of can
Misc
Informational
08/18/2021
PEX FROM HOUSE AND ALONG EAST OF FOUNDATION OK TO COVER
Sewer Service Inspection - R Passed 8/19/2021 (8:00) 8/19/2021 08/19/2021
Misc
Corrective Action Required
08/18/2021
UNCOVER SWEWER LINE AND TRACER WIRE
Water Service Inspection - R Passed 8/20/2021 8/20/2021 08/20/2021
Misc
Resolved
08/20/2021
PEX FROM HOUSE AND ALONG EAST OF FOUNDATION OK TO COVER
Rough Framing Inspection - Residential Not Ready 9/30/2021 9/30/2021 09/30/2021
Misc
Corrective Action Required
09/30/2021
*9-30-21 portal frame inspection: -Portal already covered-NOT READY -Uncover and will inspect at all rough
Driveway Inspection Passed 10/22/2021 10/22/2021 10/22/2021
Misc
Informational
10/22/2021
On Friday, 10-22-2021. I performed a drive approach inspection and passed forming and sub-grade for placement of concrete.
All Rough Inspection - Residential Failed 11/4/2021 11/4/2021 11/04/2021
Misc
Corrective Action Required
09/30/2021
*9-30-21 portal frame inspection: -Portal already covered-NOT READY -Uncover and will inspect at all rough
Misc
Corrective Action Required
11/04/2021
-Restore erosion control at entire perimeter before any further inspections -UNCOVER FAILED PFH FOR INSPECTION PER PREVIOUS FAILED INSPECTION BOTH LOCATIONS -Shim load bearing studs cut short at East garage wall -Over notched stud East wall garage -PFH tension straps per code -2 rows 16d sinkers 3” oc in top plate to header at PFH -5/8” anchor bolts at PFH -Sheathing break to be in middle 2’ at PFH -Over notched stud at PFH single bay -Anchor bolts to be in middle third of plate at single car return bay -Strap garage side of over bored top plate at drier vent -Address front entry wall not tied to exterior walls at top plate -Pan off return air to top plate at living room/ bathroom -Seal gaps in fire-blocking at fur out wall in bath 2 -Complete bath exhaust fans -Seal top plate penetration in bed 2/closet -Collar ties at bed 2 -Fireblock top of fireplace joist space -Seal floor penetration at fireplace gas line -Clarify number and size of bearing studs at all beams -Collar ties at great room rafters -Address over notched ceiling joist at master shower dwv -Anchor steel columns -Fireblocking between bed 3/bath 3, bath 3/ closet at soffit lines must prevent fire spread to joist space -Seal stud penetrations and Pan penetration at return air at bath 3 -Seal plate penetration dwv bath 3 -Address holes bored closer than 2” and closer to 2” to bottom of double joist bed 3 -Bocca plate bed 3 dwv -Address sheathing not nailed to top plate in basement -Anchor bolts to be in middle third of plate basement -Bocca plate at dwv bed 4 -Gas pressure gauge defective -Secure bonding conductor at gas line -Seal DWV at pan off bed 5 soffit -Seal fire blocking dead space bed 5 bath shower -Provide anchor bolt within 12" of plate break bed 4 closet -Complete exterior nailing pattern at front bedroom
Electrical Service Inspection Failed 11/4/2021 11/4/2021 11/04/2021
Misc
Corrective Action Required
11/04/2021
-Secure bonding conductor at metallic gas line at exterior
Gas Service Inspection - Residential Failed 11/4/2021 11/4/2021 11/04/2021
Misc
Corrective Action Required
11/04/2021
-Pressure gauge defective
Gas Service Inspection - Residential Passed 11/12/2021 11/12/2021 11/12/2021
Misc
Resolved
11/12/2021
-Pressure gauge defective
Electrical Service Inspection Failed 11/12/2021 11/12/2021 11/12/2021
Misc
Corrective Action Required
11/04/2021
-Secure bonding conductor at metallic gas line at exterior Mitchell Schwarz 11/12/2021 10:50 AM
All Rough Inspection - Residential Failed 11/12/2021 11/12/2021 11/12/2021
Misc
Corrective Action Required
11/04/2021
*9-30-21 portal frame inspection: -Portal already covered-NOT READY -Uncover and will inspect at all rough
Misc
Corrective Action Required
11/04/2021
-Restore erosion control at entire perimeter before any further inspections -UNCOVER FAILED PFH FOR INSPECTION PER PREVIOUS FAILED INSPECTION BOTH LOCATIONS -PFH tension straps per code -2 rows 16d sinkers 3” oc in top plate to header at PFH -5/8” anchor bolts at PFH -Over notched stud at PFH single bay -Pan off return air to top plate at living room/ bathroom -Seal gaps in fire-blocking at fur out wall in bath 2 -Fireblock top of fireplace joist space -Clarify number and size of bearing studs at all beams -Address over notched ceiling joist at master shower dwv -Fireblocking between bed 3/bath 3, bath 3/ closet at soffit lines must prevent fire spread to joist space -Seal stud penetrations and Pan penetration at return air at bath 3 -Seal plate penetration dwv bath 3 -Bocca plate bed 3 dwv -Address sheathing not nailed to top plate in basement -Secure bonding conductor at gas line -Seal DWV at pan off bed 5 soffit -Complete exterior nailing pattern at front bedroom
Electrical Service Inspection Failed 11/19/2021 11/19/2021 11/19/2021
Misc
Corrective Action Required
11/12/2021
-Secure bonding conductor at metallic gas line
All Rough Inspection - Residential Failed 11/19/2021 11/19/2021 11/19/2021
Misc
Corrective Action Required
11/12/2021
*9-30-21 portal frame inspection: -Portal already covered-NOT READY -Uncover and will inspect at all rough
Misc
Corrective Action Required
11/12/2021
-UNCOVER FAILED PFH FOR INSPECTION PER PREVIOUS FAILED INSPECTION BOTH LOCATIONS -PFH tension straps per code -5/8” anchor bolts at PFH -Over notched stud at PFH single bay -Pan off return air to top plate at living room/ bathroom -Seal gaps in fire-blocking at fur out wall in bath 2 -Fireblock top of fireplace joist space -Clarify number and size of bearing studs at all beams -Address over notched ceiling joist at master shower dwv -Fireblocking between bed 3/bath 3, bath 3/ closet at soffit lines must prevent fire spread to joist space -Seal stud penetrations and Pan penetration at return air at bath 3 -Bocca plate bed 3 dwv -Address sheathing not nailed to top plate in basement -Secure bonding conductor at gas line -Seal DWV at pan off bed 5 soffit
All Rough Inspection - Residential Failed 11/22/2021 11/22/2021 11/22/2021
Misc
Resolved
11/22/2021
Misc
Corrective Action Required
11/19/2021
-PFH tension strap per code sw corner single bay -Clarify number and size of bearing studs at all beams -Secure bonding conductor at gas line
All Rough Inspection - Residential Passed 11/24/2021 11/24/2021
Misc
Resolved
11/24/2021
-PFH tension strap per code sw corner single bay -Clarify number and size of bearing studs at all beams -Secure bonding conductor at gas line
Sidewalk Inspection Passed 12/22/2021 12/22/2021 12/22/2021
Misc
Informational
12/22/2021
On Wednesday, 12-22-2021. I performed a sidewalk inspection and passed the sidewalk for concrete placement.
Electrical Service Inspection Passed 2/7/2022 2/7/2022 02/07/2022
Occupancy Inspection - Codes Residential Failed 6/8/2022 06/08/2022
Misc
Corrective Action Required
06/08/2022
-Obtain lawn irrigation system permit -submit as graded plot plan for review and approval -final grade and sod -complete guardrail at deck -provide handrail at stairs to basement patio -(2) 1/2” through bolts at each post/beam connection deck per code -secondary toe lock required at sliding glass door -provide hammer arrestors at washing machine -attic access cover garage -provide ladder at basement bedroom egress windows -hot water heater required, provide clearance for hot water heater -secure AC electrical whip within 12” of disconnect
Occupancy Inspection - Codes Residential Failed 6/21/2022 6/21/2022 06/21/2022
Misc
Corrective Action Required
06/08/2022
-Obtain lawn irrigation system permit -submit as graded plot plan for review and approval -final grade and sod
Erosion Control Inspection Residential Partial 06/21/2022
Plot Plan Inspection Failed 6/22/2022 06/22/2022
Misc
Corrective Action Required
06/22/2022
-CORRECT SWALE AT REAR OF LOT FOR FUNCTION, GRADE ABOVE STORM INLET
Occupancy Inspection - Codes Residential Temporary C of O 6/23/2022 6/23/2022 06/23/2022
Misc
Corrective Action Required
06/21/2022
-FINAL GRADE AND SOD, -CORRECT SWALE AT REAR OF LOT FOR FUNCTION, GRADE ABOVE STORM INLET SPLASH BLOCKS **OK FOR TCO, TCO EXPIRES 7/14/22
Plot Plan Inspection Passed 01/18/2023
Misc
Resolved
01/18/2023
-CORRECT SWALE AT REAR OF LOT FOR FUNCTION, GRADE ABOVE STORM INLET
Erosion Control Inspection Residential Passed 01/18/2023
Rough Framing Inspection - Residential Passed 01/18/2023
Misc
Resolved
01/18/2023
*9-30-21 portal frame inspection: -Portal already covered-NOT READY -Uncover and will inspect at all rough
Electrical Service Inspection Passed 1/28/2022 1/28/2022 01/18/2023
Misc
Resolved
01/18/2023
-Secure bonding conductor at metallic gas line
Footing Inspection - Residential Passed 01/18/2023
Miscellaneous Correction
Resolved
01/18/2023
-Remove MBOE from plot plan and resubmit for approval as per conversations with Kim Brennan
Occupancy Inspection - Codes Residential Full C of O 1/18/2023 1/18/2023 01/18/2023
Misc
Resolved
01/18/2023
Documents & Images
Date Uploaded File Type Document Name
04/22/2021 Approved Plans Permit Application and License Tax Form
04/30/2021 Approved Plans Approved Drawings
05/27/2021 Engineer Report/Study Engineer Letter
05/27/2021 Email FW Cobey Creek 1st -Building Permit-Lot 30
06/12/2021 Permit DS Building Permit
06/12/2021 Receipt Receipt for transaction:2021-004336
06/14/2021 Garys Fndn 540 SE Carter Rd Lees Summit Mo Cobey Creek Lot 30 3rd Party Footing Inspection Report 6-14-21
06/16/2021 Letter INSPECTION SUMMARY
06/16/2021 Plot Plan Approved Plot Plan
06/21/2021 LOT 30 COLBY REVISED PLOT PLAN 6-21-21
06/22/2021 Letter INSPECTION SUMMARY
06/23/2021 LOT 30 COLBY ENGINER LETTER
06/23/2021 LOT 30 COLBY REVISED PLOT PLAN 6-23-21
08/12/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/19/2021 Receipt Receipt for transaction:2021-008840
11/19/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/23/2021 540 SE Carter Rd LSMO Lot 30 Cobey Creek Construction Issues Inspection Report 11-22-21
11/24/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
02/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Plot Plan Approved As Graded Plot Plan
06/22/2022 Letter INSPECTION SUMMARY
06/23/2022 Letter Codes Temporary Certificate of Occupancy
06/27/2022 Scan_0056 (1)
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter Field Certificate of Occupancy
01/18/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home