PRRES20211416
Building Permit - Residential
Certificate of Occupancy
ACH DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
03/29/2021
03/31/2021
09/25/2021
03/02/2022
Locations
Contacts
ACH DEVELOPMENT LLC, Address:3170 NE CARNEGIE DR STE 400  
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
DROTHFUSS@CAPITALCONST.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/02/2021 03/31/2021
Kim Brennan
Deck location
Corrective Action Required
03/31/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Deck must be a minimum of 30' from the rear property line
City infrustructure
Corrective Action Required
03/31/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Please show location of fire hydrant
Misc
Corrective Action Required
03/31/2021

Are the building elevations in the rear correct? Not showing a 2% slope away from the house in the rear.
Residential Plan Review Approved 04/02/2021 03/31/2021
Kim Brennan
Residential Plan Review Approved 03/31/2021 03/30/2021
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
03/29/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide square footage for the garage, covered deck and unfinished basement
Plot Plan Review Rejected 03/31/2021 03/29/2021
Kim Brennan
Deck location
Corrective Action Required
03/29/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Deck must be a minimum of 30' from the rear property line
City infrustructure
Corrective Action Required
03/29/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Please show location of fire hydrant
Misc
Corrective Action Required
03/29/2021

Are the building elevations in the rear correct? Not showing a 2% slope away from the house in the rear.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,492.25 $1,492.25 Paid 03/31/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/31/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 03/31/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 03/31/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/31/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/31/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/12/2021 (2:30) 4/12/2021 04/12/2021
Underslab Plumbing Inspection - Residential Passed 4/27/2021 4/27/2021 04/26/2021
Sewer Service Inspection - R Passed 8/2/2021 (8:45) 8/2/2021 08/02/2021
Water Service Inspection - R Passed 8/3/2021 (11:00) 8/3/2021 08/03/2021
All Rough Inspection - Residential Failed 8/23/2021 8/23/2021 08/23/2021
Misc
Corrective Action Required
08/23/2021
-Nail rear exterior wall siding to sill plates -Anchor garage PHF wall per code; add more nailing to H-frame or install metal straps -Over-notched joists above garage -Nail corner studs per code -Pan off return air space from the triangular space -Fb garage/stair double stud wall from soffit -Protect water lines at half bathroom with BOCA plates -Cannot vent double traps (above mud). Separate the wet-vented bath group from furnace condensate drain -Protect the csst gas line min 5” above top plate -Install security blocking for deck door; fill in gap behind hinges with solid wood -Support top of lvl hip rafter above rear dining -Protect wiring within 1.25” of framing surface -Provide min 1” clearance from fireplace flue to combustible ; install insulation shield in attic -Fb fireplace shelf space from roof -Brace ends of roof lvl beam from rotation -Support top of lvl hip above master bedroom; support at notched part -Provide roof purlin support above master area every 4 ft or less; move purlin support to bearing wall -Provide attic access to roof space above master area -Support hip rafters at top throughout -Fb dead space at front dining -Toe nail all joists to wall top plates with 3-10d nails or 4-8d nails. -Remove all leftover sheathing from attic -Secure SE cable within 12” of panel -Toe nail all joists to sill plates per code -Support duct at rear basement, below master bedroom -Anchor basement column -Install hanger at stair floor opening triple joist connection **DO NOT INSULATE
Electrical Service Inspection Passed 8/23/2021 8/23/2021 08/23/2021
Gas Service Inspection - Residential Passed 8/23/2021 8/23/2021 08/23/2021
All Rough Inspection - Residential Failed 8/25/2021 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/23/2021
-Anchor garage PHF wall with 2” washer -Over-notched joists above garage -Fb garage/stair double stud wall from soffit **fb gap -Install security blocking for deck door; fill in gap behind hinges with solid wood -Protect wiring within 1.25” of framing surface **kitchen, rear great room -Provide min 1” clearance from fireplace flue to combustible ; install insulation shield in attic **cut out some more wood -Brace ends of roof lvl beam from rotation -Support lvl hip above master bedroom at notched part -Provide roof purlin support above master area every 4 ft or less; move purlin support to bearing wall -Fb dead space at front dining -Toe nail all joists to sill plates per code -Install hanger at stair floor opening triple joist connection **DO NOT INSULATE
All Rough Inspection - Residential Failed 8/26/2021 8/26/2021 08/26/2021
Misc
Corrective Action Required
08/25/2021
-Anchor garage PHF wall with 2” washer. Anchor must be within middle 1/3 of sill plate -Over-notched joists above garage -Fb garage/stair double stud wall from soffit **fb gap -Install security blocking for deck door -Install hanger at stair floor opening triple joist connection **OK TO INSULATE
All Rough Inspection - Residential Passed 9/7/2021 9/7/2021 09/07/2021
Misc
Resolved
09/07/2021
-Install security blocking for deck door -Install hanger at stair floor opening triple joist connection **OK TO INSULATE
Piers/Caissons Inspection - Residential Passed 10/7/2021 10/7/2021 10/06/2021
Driveway Inspection Partial 10/7/2021 10/7/2021 10/07/2021
Misc
Informational
10/07/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Passed 10/15/2021 10/15/2021 10/11/2021
Misc
Informational
10/07/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
10/11/2021
Driveway looks good and has expansion joints at curb and right of way. Right at 36ft
Occupancy Inspection - Codes Residential Failed 1/11/2022 1/11/2022 01/11/2022
Misc
Corrective Action Required
01/11/2022
-Fix grading near water meter -Install sump pump extension -Provide sewer tracer wire port at grade -Move the plumbing vent min ten ft from west bedroom window -Install permanent cap for future basement bathroom plumbing -Support ducting in basement
Occupancy Inspection - Codes Residential Full C of O 3/2/2022 3/2/2022 03/02/2022
Misc
Resolved
03/02/2022
-Fix grading near water meter -Install sump pump extension -Provide sewer tracer wire port at grade -Move the plumbing vent min ten ft from west bedroom window -Install permanent cap for future basement bathroom plumbing -Support ducting in basement
Documents & Images
Date Uploaded File Type Document Name
03/29/2021 Application Form Permit Application and License Tax Form
03/29/2021 Letter Codes Residential Plan Review
03/30/2021 Approved Plans Approved Drawings
03/31/2021 Plot Plan Approved Plot Plan
03/31/2021 Receipt Receipt for transaction:2021-001677
03/31/2021 Letter DS Building Permit
04/12/2021 Letter INSPECTION SUMMARY
04/26/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
01/11/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter Field Certificate of Occupancy
03/02/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home