Permit Application Status

PRRES20211331


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211331
Building Permit - Residential
Certificate of Occupancy
ACH DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINSIHED BASEMENT - COVERED DECK
03/24/2021
04/07/2021
07/05/2022
Locations
Contacts
ACH DEVELOPMENT LLC, Address:3170 NE CARNEGIE DR STE 400  
ROBERTSON REMODELING LLC, Address:500 James Rollo Dr, Phone:(816) 506-4090  
LEVIROB@SBCGLOBAL.NET  
R-MECH HEATING COOLING PLUMBING/RHODES HEATING COOLING PLUMBING AND ROOTER, Address:1425 AGNES AVE, Phone:(816) 920-5955  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/06/2021 04/02/2021
Brandon Kalwei
Residential Plan Review Approved 04/06/2021 04/02/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,323.90 $1,323.90 Paid 04/07/2021
8331507-Sewer Connection Fee $570.00 $570.00 Paid 04/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/07/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/07/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/22/2021 (11:00) 4/22/2021 04/22/2021
Underslab Plumbing Inspection - Residential Passed 5/12/2021 5/12/2021 05/12/2021
All Rough Inspection - Residential Failed 7/28/2021 7/28/2021 07/28/2021
Informational
07/28/2021
-GARAGE PFH PORTAL WALL FRAMING-OK
Sewer Service Inspection - R Passed 8/2/2021 08/02/2021
Water Service Inspection - R Partial 8/2/2021 08/02/2021
Water Service Inspection - R Passed 8/3/2021 (1:00) 8/3/2021 08/03/2021
Gas Service Inspection - Residential Failed 9/23/2021 9/23/2021 09/23/2021
Misc
Corrective Action Required
09/23/2021
-Provide min 10 psi pressure for testing
All Rough Inspection - Residential Failed 9/23/2021 9/23/2021 09/23/2021
Misc
Corrective Action Required
09/23/2021
-Anchor garage PFH wall per code -Seal penetrations of return air space -Complete soffit above kitchen range -Plan calls for 2 king studs between great room windows. Have engineer address this -Remove combustible material above fireplace lower than the triangular spacers -Securely fasten fireplace to framing -Provide min 1” clearance from fireplace flue to combustible -Support ridge and valley rafters above master closet -Fb wall top plate above dryer duct -Nail siding at bathroom 4 bathroom -Provide attic access above 2nd fl -Reinforce notched joists below master shower -Bath fan flexible duct cannot exceed 14 ft -Have engineer address kitchen I beam point load offset from I beam below but supported by the triple joist **OK TO INSULATE
Electrical Service Inspection Passed 9/23/2021 9/23/2021 09/23/2021
Erosion Control Inspection Residential Failed 10/11/2021 10/11/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/11/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Erosion Control Inspection Residential Passed 10/15/2021 10/15/2021
Misc
Informational
10/15/2021
MAINTAIN EROSION CONTROL UNTIL SODDING
All Rough Inspection - Residential Failed 10/15/2021 10/15/2021 10/15/2021
Misc
Corrective Action Required
09/23/2021
The north garage PFH wall sill plate is not anchored (only one is installed anchor). Add another anchor there with 2”x2”x3/16” washer
Gas Service Inspection - Residential Passed 10/15/2021 10/15/2021
Misc
Resolved
10/15/2021
-Provide min 10 psi pressure for testing
All Rough Inspection - Residential Passed 11/04/2021
Misc
Resolved
11/04/2021
The north garage PFH wall sill plate is not anchored (only one is installed anchor). Add another anchor there with 2”x2”x3/16” washer
Driveway Inspection Partial 12/13/2021 12/13/2021
Misc
Informational
12/13/2021
12-13-21 AN forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Passed 12/17/2021 12/17/2021 12/20/2021
Misc
Informational
12/13/2021
12-13-21 AN forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
12/20/2021
Driveway meets LS specs. 12/20/21 ES
Occupancy Inspection - Codes Residential Failed 2/16/2022 2/16/2022 02/16/2022
Misc
Corrective Action Required
02/16/2022
-Piers not approved on record -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Provide sewer tracer wire port at grade -Pendant light not allowed within bath tub zone (defined as space 3 ft out and 8 ft up from flood rim) -Install secondary lock for slide doors -Garage door bottom track brackets must be close to 10” from floor -Stair handrail to basement shall be continuous uninterrupted for the whole stair flight
Piers/Caissons Inspection - Residential Passed 02/17/2022
Informational
02/17/2022
PIERS APPROVED BY APEX ENGINEERING
Occupancy Inspection - Codes Residential Temporary C of O 2/23/2022 2/23/2022 02/23/2022
Misc
Corrective Action Required
02/16/2022
-Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Garage door bottom track brackets must be close to 10” from floor **See door engineer document -Homebuyer raised concern about the tripping hazard due to the driveway not at the same elevation as the mailbox slab. The driveway poured about 3” above the mailbox slab.
Occupancy Inspection - Codes Residential Full C of O 07/05/2022
Misc
Resolved
07/05/2022
-Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade
Documents & Images
Date Uploaded File Type Document Name
03/24/2021 Application Form APPLICATION
04/02/2021 LOT 307 FINAL survey
04/02/2021 PKR307 Spec - Sealed Plans (March 8, 2021)
04/02/2021 Plot Plan APPROVED PLOT PLAN
04/07/2021 Receipt Receipt for transaction:2021-001806
04/07/2021 Approved Plans APPROVED PLANS
04/07/2021 Letter DS Building Permit
04/22/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
06/08/2021 1913 Catalina Pier Inspection 3rd Party
07/28/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
10/11/2021 1913 NE Catalina Ave - Structural Letter (October 9, 2021)
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/17/2022 1913 NE Catalina pier inspection
02/17/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter Codes Temporary Certificate of Occupancy
04/08/2022 1913 NE Catalina Ave - Structural Letter (October 9, 2021) (1)
07/05/2022 Letter Codes Final Certificate of Occupancy
07/05/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.