Summary
PRRES20211035
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 04/16/2021 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 04/19/2021 12:00 AM by username 'Patrick Schonfeldt'.
03/09/2021
03/10/2021
10/29/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/11/2021 03/10/2021
Kim Brennan
Residential Plan Review Approved 03/11/2021 03/09/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $989.04 $989.04 Paid 03/10/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/10/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 03/10/2021
8331504-EFHB Middle Big Creek, Full $435.24 $435.24 Paid 03/10/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 03/10/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/10/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/10/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 04/16/2021
Misc
Corrective Action Required
04/16/2021
-FOOTING POURED WITHOUT INSPECTION, SUBMIT ENGINEER REPORT, REPORT REQUIRED TO BE UPLOADED TO PERMIT WITHIN 2 DAYS OF INSPECITON
Footing Inspection - Residential Passed 4/19/2021 04/19/2021
Misc
Resolved
04/19/2021
Underslab Plumbing Inspection - Residential Failed 5/6/2021 5/6/2021 05/06/2021
Misc
Corrective Action Required
05/06/2021
-CORRECT INTERIOR DRAIN TILE, MUST REACH OPPOSITE FOUNDATION FOOTING FROM SUMP PIT
Underslab Plumbing Inspection - Residential Passed 5/10/2021 5/10/2021 05/10/2021
Misc
Resolved
05/10/2021
Sewer Service Inspection - R Passed 7/16/2021 (10:15) 7/16/2021 07/16/2021
Water Service Inspection - R Partial 7/16/2021 7/16/2021 07/16/2021
Misc
Informational
07/16/2021
Partial inspection on pex mid point to house entrance
Water Service Inspection - R Passed 7/19/2021 (9:30) 7/19/2021 07/19/2021
Misc
Resolved
07/19/2021
Gas Service Inspection - Residential Passed 7/27/2021 7/27/2021 07/27/2021
All Rough Inspection - Residential Failed 7/27/2021 7/27/2021 07/27/2021
Misc
Corrective Action Required
07/27/2021
-fireblock box out chase at garage for b vent -seal top and bottom plate penetrations -see garage, kitchen -Address broken truss C6 above front entry at dining room -submit engineer report -Nail truss H2.5 clip N kitchen wall at pantry -Install Bocca protection plate at DWV bottom plate master water closet -strap top plate master bedroom, less than 24” offset -Truss hangers per plans -Fireblock vertical to horizontal at soffit ends at furred downs in finished basement -Land NM to box at finished basement bedroom ceiling -secure vertical DWV at midpoint - finished basement bath -Bocca protection plates at bottom plate finished basement bath -Complete duct at basement bath exhaust fan -protection nail plate at DWV stud finished basement closet -Joist hanger at sgl joist to dbl joist connection unfinished basement -Nail exterior sheathing per plans -(2) 1/2” through bolts at each post/beam connection -Full height continuous 6x6 cedar posts at deck per plans
All Rough Inspection - Residential Failed 8/2/2021 8/2/2021 08/02/2021
Misc
Corrective Action Required
07/27/2021
-Address broken truss C6 above front entry at dining room -field fix per engineer letter -Nail exterior sheathing per plans -Full height continuous 6x6 cedar posts at deck per plans-field fix per engineer letter **OK TO INSULATE**
All Rough Inspection - Residential Passed 8/5/2021 8/5/2021 08/05/2021
Misc
Resolved
08/05/2021
Electrical Service Inspection Passed 9/9/2021 9/9/2021 09/09/2021
Driveway Inspection Passed 9/9/2021 09/09/2021
Occupancy Inspection - Codes Residential Failed 10/22/2021 10/22/2021 10/22/2021
Misc
Corrective Action Required
10/22/2021
*obtain sprinkler permit* -open junction box front left of garage -exterior drainage 36” from foundation -gfci for dishwasher -lockout for water heater breaker -secure A/c whip within 12” of disconnect -hand rail/guard rail at deck stairs bellow 34”
Occupancy Inspection - Codes Residential Failed 10/28/2021 10/28/2021 10/28/2021
Misc
Resolved
10/28/2021
Misc
Corrective Action Required
10/28/2021
-gfci protection for dishwasher/ plug under sink showing open neutral
Plot Plan Inspection Passed 10/29/2021 10/29/2021 10/29/2021
Occupancy Inspection - Codes Residential Full C of O 10/29/2021 10/29/2021 10/29/2021
Misc
Resolved
10/29/2021
Documents & Images
Date Uploaded File Type Document Name
03/09/2021 Application Form Permit Application and License Tax Form
03/09/2021 LOT 93 FINAL NEW
03/09/2021 Approved Plans Approved Drawings
03/09/2021 Approved Plans Approved Truss Layout
03/09/2021 Approved Plans Approved Truss Package
03/10/2021 Plot Plan Approved Plot Plan
03/10/2021 Receipt Receipt for transaction:2021-001170
03/10/2021 Letter DS Building Permit
04/16/2021 Letter Stop Work Order
04/16/2021 Lot 93 Stoney Creek Footing Inspection
04/16/2021 Lot 93 Manor at Stoney Creek Wall
04/19/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/19/2021 Letter INSPECTION SUMMARY
07/27/2021 Letter INSPECTION SUMMARY
07/27/2021 Letter INSPECTION SUMMARY
07/27/2021 93 Manor at stoney creek deck post connection letter
07/28/2021 Broken Truss engineer letter
08/02/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter INSPECTION SUMMARY
10/25/2021 MN93 sprinkler permit
10/28/2021 Letter INSPECTION SUMMARY
10/29/2021 Letter Codes Final Certificate of Occupancy
10/29/2021 Letter Field Certificate of Occupancy
10/29/2021 Letter INSPECTION SUMMARY
10/29/2021 Letter Codes Final Certificate of Occupancy
10/29/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home