Summary
PRRES20210885
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES - COVERED PATIO
03/02/2021
03/12/2021
12/27/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
PERMITTING@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/15/2021 03/11/2021
Brandon Kalwei
Residential Plan Review Approved 03/15/2021 03/11/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $961.05 $961.05 Paid 03/12/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 03/12/2021
Right of Way Permit Fee $80.00 $80.00 Paid 03/12/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/12/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 03/12/2021
Water Meter Fee $455.54 $455.54 Paid 03/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/28/2021 5/28/2021 05/28/2021
Underslab Plumbing Inspection - Residential Failed 6/9/2021 6/9/2021 06/09/2021
Misc
Corrective Action Required
06/09/2021
-POST ADDRESS
Underslab Plumbing Inspection - Residential Passed 6/11/2021 6/11/2021 06/10/2021
Misc
Resolved
06/10/2021
-POST ADDRESS
All Rough Inspection - Residential Partial 7/13/2021 7/13/2021 07/13/2021
Misc
Informational
07/13/2021
7/13/21 - GARAGE PORTAL EXTERIOR OK
All Rough Inspection - Residential Failed 7/23/2021 7/23/2021 07/23/2021
Misc
Informational
07/13/2021
7/13/21 - GARAGE PORTAL EXTERIOR OK 7/23/21 - COVERED DECK/PORCH HAS BEEN COVERED, REMOVE FOR INSPECTION AT ALL ROUGH
Sewer Service Inspection - R Passed 8/30/2021 (11:00) 8/30/2021 08/30/2021
Water Service Inspection - R Passed 8/31/2021 8/31/2021 08/31/2021
Erosion Control Inspection Residential Failed 8/31/2021 8/31/2021 08/31/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/31/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Failed 9/15/2021 9/15/2021 09/15/2021
Misc
Informational
07/23/2021
7/13/21 - GARAGE PORTAL EXTERIOR OK
Misc
Corrective Action Required
09/15/2021
-Anchor bolts required within 12” of plates breaks at garage -Seal unused top plate bore at dining exterior wall, great room, front bedroom, garage -12” oc nailing at braced wall corners -Studs short of covered patio beam bearing ends, right of sgd -H2.5 clips at truss ends above front entry -strap top plate at bedroom closet, less than 24” offset between plate breaks -Joist hangers at master bed ceiling vault -studs overbored at great room window to right of fireplace -Nail exterior sheathing per plans at dining room sgd, CS-PF design -Shim or replace all Jack studs that have been cut short of headers throughout -All truss hangers per plans -Anchor all SCH 40 steel columns to floor at basement -Joist hangers required at joist to header above furnace, over 4’ -Furnace b vent requires 1” clearance -Identify GEC at both ends -Complete DWV basement -sheath fireplace cantilever bottom at exterior -Nail all exterior sheathing per plans -Unable to inspect covered porch at front and rear with cover
Electrical Service Inspection Failed 9/15/2021 9/15/2021 09/15/2021
Misc
Corrective Action Required
09/15/2021
IDENTIFY GEC AT BOTH ENDS
Gas Service Inspection - Residential Passed 9/15/2021 9/15/2021 09/15/2021
All Rough Inspection - Residential Failed 9/27/2021 9/27/2021 09/27/2021
Misc
Informational
09/15/2021
7/13/21 - GARAGE PORTAL EXTERIOR OK
Misc
Corrective Action Required
09/15/2021
-Complete DWV basement
Electrical Service Inspection Failed 9/30/2021 9/30/2021 09/30/2021
Misc
Resolved
09/30/2021
IDENTIFY GEC AT BOTH ENDS
Electrical Service Inspection Passed 9/30/2021 9/30/2021 09/30/2021
All Rough Inspection - Residential Passed 9/30/2021 9/30/2021 09/30/2021
Misc
Resolved
09/30/2021
7/13/21 - GARAGE PORTAL EXTERIOR OK
Misc
Resolved
09/30/2021
-Complete DWV basement
Driveway Inspection Passed 11/9/2021 11/9/2021 11/09/2021
Misc
Informational
11/09/2021
On Tuesday, 11-09-2021. A drive approach inspection was performed and passed city spec’s for placement of concrete.
Sidewalk Inspection Passed 11/9/2021 11/9/2021 11/09/2021
Misc
Informational
11/09/2021
On Tuesday, 11-09-2021. I performed sidewalk inspection and passed sidewalk forms and sub grade for placement of concrete.
Occupancy Inspection - Codes Residential Temporary C of O 12/17/2021 12/17/2021 12/17/2021
Misc
Corrective Action Required
12/17/2021
TCO UNTIL 01/03/2022 -Guard rail at front stoop where more than 30” , 36” out -seal top of meter can, A/c disconnect and all other exterior penetrations -sump pump discharge to be 36” from foundation
Occupancy Inspection - Codes Residential Full C of O 12/27/2021 12/27/2021 12/27/2021
Misc
Resolved
02/04/2022
-Guard rail at front stoop where more than 30” , 36” out -seal top of meter can, A/c disconnect and all other exterior penetrations -sump pump discharge to be 36” from foundation
Plot Plan Inspection Passed 1/28/2022 01/28/2022
Documents & Images
Date Uploaded File Type Document Name
03/02/2021 Application Form H3 #90 - PERMIT APP
03/11/2021 90 HAWTHORNE RIDGE ROOF LAYOUT
03/11/2021 H3 #90 - Bradford - Craftsman - Sheets- signed
03/11/2021 I44715924_H3-90
03/11/2021 LOT 90 FINAL
03/11/2021 Approved Plans APPROVED PLANS
03/11/2021 Approved Plans APPROVED TRUSS DRAWINGS
03/11/2021 Approved Plans APPROVED TRUSS LAYOUT
03/11/2021 Plot Plan APPROVED PLOT PLAN
03/12/2021 Receipt Receipt for transaction:2021-001238
03/12/2021 Letter DS Building Permit
05/28/2021 Lot 90 Hawthorne Ridge Footing inspection
05/28/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/10/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/27/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
12/17/2021 Letter Codes Temporary Certificate of Occupancy
12/27/2021 Letter Codes Final Certificate of Occupancy
12/27/2021 Letter Field Certificate of Occupancy
01/28/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home