Permit Application Status

PRRES20210050


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210050
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED PATIO DEFERRED ENGINEERED FLOOR JOISTS
01/05/2021
01/14/2021
07/05/2021
01/31/2023
Locations
Contacts
PFEIFER HOMES INC, Address:1550 SW MARKET ST STE 210, Phone:(816) 524-5245  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
AUBREY@PFEIFERHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/14/2021 01/12/2021
Kim Brennan
Contours, spot elevations and arrows
Corrective Action Required
01/12/2021

Contours, spot elevations and drainage flow arrows (as required) shall be provided on the lot.
Basement opening elevations
Corrective Action Required
01/12/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. Please provide the MLO's as provided on the MDP
Residential Plan Review Approved 01/14/2021 01/12/2021
Kim Brennan
Residential Plan Review Approved 01/08/2021 01/08/2021
Kim Brennan
10 Combustion air
Corrective Action Required
01/06/2021

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Misc
Corrective Action Required
01/06/2021

The plans show that this lot is in Reserve at Woodside Ridge and it should just show Woodside Ridge, 1st Plat.
Plot Plan Review Rejected 01/08/2021 01/06/2021
Kim Brennan
Contours, spot elevations and arrows
Corrective Action Required
01/06/2021

Contours, spot elevations and drainage flow arrows (as required) shall be provided on the lot.
Basement opening elevations
Corrective Action Required
01/06/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. Please provide the MLO's as provided on the MDP
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,211.91 $1,211.91 Paid 01/14/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 01/14/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/14/2021
8331507-Sewer Connection Fee $570.00 $570.00 Paid 01/14/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 01/14/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 01/14/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/05/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/05/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/05/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/22/2021 (1:30) 1/22/2021 01/22/2021
Misc
Informational
01/22/2021
- PROVIDE ADDRESS - - UFER SE CORNER -
Erosion Control Inspection Residential Failed 2/26/2021 02/26/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/26/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - SPREAD GRAVEL FILTER -
Underslab Plumbing Inspection - Residential Passed 2/26/2021 2/26/2021 02/26/2021
Misc
Partial Correction
02/26/2021
- PROVIDE ADDRESS -
Water Service Inspection - R Passed 3/4/2021 (9:15) 3/4/2021 03/04/2021
Sewer Service Inspection - R Passed 3/4/2021 03/04/2021
Piers/Caissons Inspection - Residential Not Ready 4/13/2021 (8:00) 4/13/2021 04/13/2021
Misc
Corrective Action Required
04/13/2021
- PROVIDE ADDRESS - - NO DECK PIERS DUG - Michael Harkins 04/13/2021 8:39 AM
Piers/Caissons Inspection - Residential Passed 4/14/2021 (8:30) 4/14/2021 04/14/2021
Misc
Corrective Action Required
04/13/2021
- PROVIDE ADDRESS - - (2) 24 x 36 PIERS
Gas Service Inspection - Residential Passed 7/28/2021 7/28/2021 07/28/2021
Electrical Service Inspection Failed 7/28/2021 7/28/2021 07/28/2021
Misc
Corrective Action Required
07/28/2021
PROVIDE PROTECTION TO AVOID DAMAGE TO ELECTRICAL EQUIPMENT AT SERVICE PANEL DWV ABOVE ( E3405.3 2018 IRC )
All Rough Inspection - Residential Failed 7/28/2021 7/28/2021 07/28/2021
Miscellaneous Correction
Corrective Action Required
07/28/2021
Provide anchor bolts within 12" of plate break & end of plate garage Anchor bolts shall land in middle 1/3 the width of plate Tighten anchor bolts garage Provide layout for engineered floor joist Seal low volt penetration entry cost closet Seal penetrations soffit laundry room Provide anchor SCH 40 column at stairway Provide solid security blocking patio door Provide snow blocking above fireplace Provide chase fireplace vent Seal fire blocking fireplace & low volt floor Address rafters la lqnding on multiple blocks Address cut joist coat closet Address cut joist north storage basement Seal low volt penetration stairway/ coat closet Provide midpointh support vertical DWV 2" & h Seal conductors in supply air plenum master closet Seal upward penetration master closet Solid block & nail sheathing breaks front door Seal upward penetrations (pex) powder room Seal exhaust vent penetrations 2nd floor bath Fire block HVAC chase 2nd floor bath behind shower Seal upward penetration bed #2 Nail sheathing bed #3 Structural straps DWV bearing walls 16 gage and 1.5 in wide with 8 10d nails each side (R602.6.1 2018 IRC) Seal upward penetrations bed #4 Provide collar ties per plan Provide 3.5 SCH 40 columns B & D per plan Provide anchor bolts SCH 40 columns Install egress window basement bedroom Seal upward penetrations basement bedroom Provide shield / gutter DWV above service panel & cap off Nail exterior sheathing per code
All Rough Inspection - Residential Not Ready 8/5/2021 08/05/2021
Miscellaneous Correction
Corrective Action Required
07/28/2021
Provide anchor bolts end of plate garage Provide solid security blocking patio door Seal fire blocking fireplace lid Address rafters la lqnding on multiple blocks ( Skeens letter is for different house) Address cut joist coat closet Address cut joist north storage basement Structural straps DWV bearing walls 16 gage and 1.5 in wide with 8 10d nails each side (R602.6.1 2018 IRC) Seal upward penetrations bed #4 Provide collar ties per plan Provide 3.5 SCH 40 columns B & D per plan Provide anchor bolts SCH 40 columns Provide shield / gutter DWV above service panel & cap off Nail exterior sheathing per code
All Rough Inspection - Residential Failed 8/12/2021 8/12/2021 08/12/2021
Miscellaneous Correction
Corrective Action Required
08/05/2021
Provide anchor bolts end of plate garage Provide solid security blocking patio door Seal fire blocking fireplace lid Address rafters la lqnding on multiple blocks ( Skeens letter is for different house) Address cut joist coat closet Address cut joist north storage basement Structural straps DWV bearing walls 16 gage and 1.5 in wide with 8 10d nails each side (R602.6.1 2018 IRC) Seal upward penetrations bed #4 Provide collar ties per plan Provide 3.5 SCH 40 columns B & D per plan Provide anchor bolts SCH 40 columns Provide shield / gutter DWV above service panel & cap off Nail exterior sheathing per code
Misc
Informational
08/12/2021
COURTESY INSPECTION MET WITH RICK TO LOOK AT ITEMS ON INSPECTION REPORT
Erosion Control Inspection Residential Failed 8/17/2021 08/17/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/26/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - SPREAD GRAVEL FILTER -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/17/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE -
All Rough Inspection - Residential Failed 8/17/2021 8/17/2021 08/17/2021
Miscellaneous Correction
Corrective Action Required
08/12/2021
Address cut joist north storage basement ( header off per engineers letter )
Misc
Informational
08/12/2021
COURTESY INSPECTION MET WITH RICK TO LOOK AT ITEMS ON INSPECTION REPORT
Electrical Service Inspection Passed 8/17/2021 8/17/2021 08/17/2021
Misc
Corrective Action Required
07/28/2021
Driveway Inspection Partial 8/30/2021 08/30/2021
Misc
Informational
08/30/2021
Forms were placed and aggregate was present and compacted. RP 8-30-21
Driveway Inspection Passed 9/10/2021 9/10/2021 09/10/2021
Misc
Informational
08/30/2021
Forms were placed and aggregate was present and compacted. RP 8-30-21
Misc
Informational
09/10/2021
Finished driveway meets LS and ADA specs. RP 9-10-21
Occupancy Inspection - Codes Residential Failed 12/21/2021 12/21/2021 12/21/2021
Misc
Corrective Action Required
12/21/2021
-address all rough inspection still not completed. -Sidewalk inspection needs completed -complete final grade and sod. -check water meter at time of final grade and sod -splash box’s and sump pump discharge to extend 36” from foundation -obtain lawn irrigation permit -gutters to be completed -open junction boxes at front right and left of garage -hardware and security screws at front & rear door -complete jacuzzi tub (motor and GFCI outlet to be accessible and able to maintenance in accordance with code section p2720.1 of the IRC -spark rings required at kitchen outlets where not code compliant with code section E3906.4 of the IRC -self closing door at garage -garage entry bathroom open junction box -handrail at basement steps -steps/ladder required at all window wells more than 44” in depth -remove debris and level gravel in basement great room window well -secure and complete water line entry in basement -label all non GFCI outlets in unfinished spaces
Sidewalk Inspection Partial 12/21/2021 12/21/2021 12/21/2021
Misc
Informational
12/21/2021
Forms were placed and aggregate was present and compacted. RP 12-21-21
Erosion Control Inspection Residential Failed 12/27/2021 12/27/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/17/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - SPREAD GRAVEL FILTER -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/17/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/27/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE UNTIL SOD COMPLETE
All Rough Inspection - Residential Passed 12/27/2021 12/27/2021
Miscellaneous Correction
Resolved
12/27/2021
Misc
Informational
08/17/2021
COURTESY INSPECTION MET WITH RICK TO LOOK AT ITEMS ON INSPECTION REPORT
Occupancy Inspection - Codes Residential Temporary C of O 12/27/2021 12/27/2021 12/27/2021
Misc
Corrective Action Required
12/21/2021
-complete final grade and sod. -check water meter at time of final grade and sod -splash box’s and sump pump discharge to extend 36” from foundation -obtain lawn irrigation permit & submit backflow certification -gutters to be completed
Sidewalk Inspection Passed 12/30/2021 12/30/2021 01/04/2022
Misc
Informational
12/21/2021
Forms were placed and aggregate was present and compacted. RP 12-21-21
Misc
Informational
01/04/2022
Finished sidewalk meets LS and ADA specs. RP 1-4-22
Erosion Control Inspection Residential Failed 1/21/2022 1/21/2022 01/21/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/21/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - SPREAD GRAVEL FILTER -
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/21/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE -
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/21/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE UNTIL SOD COMP
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROVIDE EROSION CONTROL AT PERIMETER OF LOT AND CLEAN DEBRIS FROM STREETS
Erosion Control Inspection Residential Not Ready 1/26/2022 1/26/2022 01/26/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROVIDE EROSION CONTROL AT PERIMETER OF LOT AND CLEAN DEBRIS FROM STREETS
Occupancy Inspection - Codes Residential Temporary C of O 2/1/2022 02/01/2022
Misc
Corrective Action Required
12/27/2021
-complete final grade and sod. -check water meter at time of final grade and sod -splash box’s and sump pump discharge to extend 36” from foundation -obtain lawn irrigation permit & submit backflow certification -gutters to be completed
Plot Plan Inspection Passed 06/16/2022
Erosion Control Inspection Residential Failed 06/16/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
06/16/2022
Occupancy Inspection - Codes Residential Failed 6/16/2022 6/16/2022 06/16/2022
Misc
Corrective Action Required
02/01/2022
-obtain lawn irrigation permit & submit backflow certification
Erosion Control Inspection Residential Passed 08/08/2022
Occupancy Inspection - Codes Residential Ready for Temp CO 8/8/2022 8/8/2022 08/08/2022
Misc
Corrective Action Required
06/16/2022
-obtain lawn irrigation permit & submit backflow certification Pay TCO fee for another 30 days
Occupancy Inspection - Codes Residential Full C of O 2/1/2023 01/31/2023
Misc
Resolved
01/31/2023
-obtain lawn irrigation permit & submit backflow certification Pay TCO fee for another 30 days
Documents & Images
Date Uploaded File Type Document Name
01/05/2021 Application Form Permit Application
01/05/2021 Application Form License Tax Form
01/06/2021 Letter Codes Residential Plan Review
01/08/2021 Approved Plans Approved Drawings
01/12/2021 Plot Plan Approved Plot Plan
01/14/2021 Receipt Receipt for transaction: 2021-000214
01/14/2021 Letter DS Building Permit
01/22/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/12/2021 329 Ambersham review comments0001
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter Codes Temporary Certificate of Occupancy
12/27/2021 Letter Codes Temporary Certificate of Occupancy
01/04/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter Codes Temporary Certificate of Occupancy
04/05/2022 Receipt Receipt for transaction: 2022-001884
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
01/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2023 Receipt Receipt for transaction: 2023-000125
01/31/2023 Letter Codes Final Certificate of Occupancy
01/31/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home