Summary
PRRES20204957
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT TILE ROOF
12/29/2020
01/04/2021
06/27/2021
12/10/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MIKE@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/06/2021 01/04/2021
Kim Brennan
Deck location
Corrective Action Required
01/04/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered patio
As-graded plot plan
Corrective Action Required
01/04/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 01/04/2021 01/04/2021
Kim Brennan
Planning Review (RES) Approved 12/31/2020 12/29/2020
Shannon McGuire
Plot Plan Review Rejected 12/31/2020 12/29/2020
Kim Brennan
Deck location
Corrective Action Required
12/29/2020

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered patio
As-graded plot plan
Corrective Action Required
12/29/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 12/31/2020 12/29/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,059.12 $1,059.12 Paid 01/04/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 01/04/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/04/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 01/04/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 01/04/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 01/04/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 3/1/2021 (11:30) 3/1/2021 03/01/2021
Footing Inspection - Residential Failed 3/1/2021 03/01/2021
Misc
Corrective Action Required
03/01/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR
Water Service Inspection - R Passed 3/2/2021 (1:00) 3/2/2021 03/02/2021
Corrective Action Required
03/02/2021
Underslab Plumbing Inspection - Residential Passed 3/17/2021 3/17/2021 03/17/2021
Footing Inspection - Residential Passed 2/22/2021 03/24/2021
Misc
Resolved
03/24/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR
Misc
Informational
01/11/2022
- 3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL - - UFER LOCATION SE REAR LEFT CORNER OF GARAGE FOUNDATION WALL -
Erosion Control Inspection Residential Failed 4/29/2021 04/29/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/29/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - CLEAN UP STREET -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/09/2021
MAINTAIN SILT FENCE CLEAN STREET MAINTAIN GUTTER BUDDY AT CURB INLET DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
All Rough Inspection - Residential Failed 5/5/2021 5/5/2021 05/05/2021
Misc
Corrective Action Required
05/05/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc -Install straps -Tie down trusses to rear porch header **Please do not cut out too much of the bottom garage PFH wall plates
Erosion Control Inspection Residential Failed 6/9/2021 06/09/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/29/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - CLEAN UP STREET -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/09/2021
MAINTAIN SILT FENCE CLEAN STREET MAINTAIN GUTTER BUDDY AT CURB INLET DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Gas Service Inspection - Residential Failed 6/9/2021 6/9/2021 06/09/2021
Misc
Corrective Action Required
06/09/2021
PROVIDE MIN 10 PSI FOR 15 MIN
Electrical Service Inspection Failed 6/9/2021 6/9/2021 06/09/2021
Misc
Corrective Action Required
06/09/2021
IDENTIFY UFER GROUND ( GREEN TAPE )
All Rough Inspection - Residential Not Ready 6/17/2021 6/17/2021 06/17/2021
Misc
Corrective Action Required
05/05/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc -Install straps -Tie down trusses to rear porch header **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Corrective Action Required
06/17/2021
THIS HOUSE IS NOT READY FOR ROUGH IN CORRECT BELOW ITEMS BEFORE CALLING FOR INSPECTION THIS LIST IS INCOMPLETE AND SUBJECT TO CHANGE Solid block sheathing breaks and nail per plan/ per code ( no staples ) sheets S1.0 Exterior bracing WSP shall be not less than 48" total at end of braced wall line Nail stud to stud and abutting studs at intersecting wall corners ( at braced wall panels) Provide 4 studs at GT bearing points per roof plan Provide LIBs per plan
Electrical Service Inspection Passed 6/28/2021 6/28/2021 06/28/2021
Misc
Resolved
06/28/2021
Gas Service Inspection - Residential Failed 6/28/2021 6/28/2021 06/28/2021
Misc
Corrective Action Required
06/09/2021
PROVIDE MIN 10 PSI FOR 15 MIN 6/28/21 - GAUGE AT 0 PSI AT INSPECTION
All Rough Inspection - Residential Failed 6/30/2021 6/30/2021 06/30/2021
Misc
Corrective Action Required
06/17/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Corrective Action Required
06/17/2021
Solid block sheathing breaks and nail per plan/ per code ( no staples ) sheets S1.0 Exterior bracing WSP shall be not less than 48" total at end of braced wall line Nail stud to stud and abutting studs at intersecting wall corners ( at braced wall panels) 6/30/21 Square washers in 5/8 anchor bolts should be on top of double bottom plate per plan Nail sheathing throughout per code / per plan Sheet S1.0 8D nails no staples Nail sheathing per plan SGD at deck 8D nails no staples Tighten anchor bolts garage Seal low volt penetrations bottom plate master bed & bed #2 Provide TJC37h in hanger single car garage per roof truss layout Provide LUS24 hangers per roof truss layout Provide LTHJA26 hangers per roof truss layout Provide 1 1/2 bearing deck beam to foundation Provide H2.5 great room corner near fireplace J-1 & truss above SGD & master water closet Address broken truss B-1 kitchen A-7 pantry Provide lateral bracing per Truss details Provide anchor bolts within 12" of plate breaks high basement walls Tighten anchor bolt stair landing Grounding electrode conductor shall land on neutral buss bar main service panel Fire block tub traps Provide 3.5 SCH 40 column detail F basement Provide double floor joist per plan basement Provide minimum 10 PSI FOR 15 minutes for gas test Provide boca plates VTR 2" below top plate kitchen sink & master vanity
Gas Service Inspection - Residential Passed 7/14/2021 7/14/2021 07/14/2021
Misc
Resolved
07/14/2021
All Rough Inspection - Residential Not Ready 7/14/2021 7/14/2021 07/14/2021
Misc
Corrective Action Required
06/30/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Corrective Action Required
06/30/2021
Solid block sheathing breaks and nail per plan/ per code ( no staples ) sheets S1.0 Exterior bracing WSP shall be not less than 48" total at end of braced wall line Nail stud to stud and abutting studs at intersecting wall corners ( at braced wall panels) 6/30/21 Square washers in 5/8 anchor bolts should be on top of double bottom plate per plan Nail sheathing throughout per code / per plan Sheet S1.0 8D nails no staples (!not done ) Nail sheathing per plan SGD at deck 8D nails no staples ( covered unable to verify) Seal low volt penetrations bottom plate master bed & bed #2 ( not done ) Provide TJC37h in hanger single car garage per roof truss layout Provide LUS24 hangers per roof truss layout Provide LTHJA26 hangers per roof truss layout Provide 1 1/2 bearing deck beam to foundation ( carry's load to patio slab not foundation ) Address broken truss B-1 kitchen A-7 pantry Provide lateral bracing per Truss details : NOT READY / DO NOT ISULATE : Michael Harkins 07/14/2021 12:54 PM
All Rough Inspection - Residential Not Ready 7/16/2021 7/16/2021 07/16/2021
Misc
Corrective Action Required
07/14/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Corrective Action Required
07/14/2021
Solid block sheathing breaks and nail per plan/ per code ( no staples ) sheets S1.0 ( rear of single car garage / bed #2 no 8D nails all staples ) Exterior bracing WSP shall be not less than 48" total at end of braced wall line 6/30/21 Square washers in 5/8 anchor bolts should be on top of double bottom plate per plan Nail sheathing throughout per code / per plan Sheet S1.0 8D nails no staples (!not done ) :BED #3 CS WSP NAILING PER PLAN PER CODE 6/16/21 not done ) Nail sheathing per plan SGD at deck 8D nails no staples ( see staples no nails in header 6/16/21) Provide 1 1/2 bearing deck beam to foundation ( carry's load to patio slab not foundation ) Address broken truss B-1 kitchen A-7 pantry ( no engineers letter uploaded to permit 6/16/21) : NOT READY / DO NOT ISULATE : Michael Harkins 07/14/2021 12:54 PM Michael Harkins 07/16/2021 1:52 PM
All Rough Inspection - Residential Failed 7/21/2021 7/21/2021 07/21/2021
Misc
Corrective Action Required
07/16/2021
Builder requested garage portal wall framing and rear patio roof framing only: -Nail the garage PFH wall sheathing to sill plate with 8d @ 3" oc **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Corrective Action Required
07/16/2021
Solid block sheathing breaks and nail per plan/ per code ( no staples ) sheets S1.0 ( rear of single car garage / bed #2 no 8D nails all staples ) Exterior bracing WSP shall be not less than 48" total at end of braced wall line 6/30/21 Nail sheathing throughout per code / per plan Sheet S1.0 8D nails no staples (!not done ) :BED #3 CS WSP NAILING PER PLAN PER CODE 6/16/21 not done ) Nail sheathing per plan SGD at deck 8D nails no staples ( see staples no nails in header 6/16/21) : NOT READY / DO NOT ISULATE : Michael Harkins 07/14/2021 12:54 PM Michael Harkins 07/16/2021 1:52 PM
All Rough Inspection - Residential Passed 7/22/2021 7/22/2021 07/22/2021
Misc
Resolved
07/22/2021
Builder requested garage portal wall framing and rear patio roof framing only: **Please do not cut out too much of the bottom garage PFH wall plates
Miscellaneous Correction
Resolved
07/22/2021
Driveway Inspection Partial 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/12/2021
Forms were placed and aggregate was present and compacted. RP 8-12-21
Driveway Inspection Passed 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/12/2021
Forms were placed and aggregate was present and compacted. RP 8-12-21
Misc
Informational
08/20/2021
Finished driveway meets LS and ADA specs. RP 8-20-21
Sidewalk Inspection Partial 10/7/2021 10/7/2021 10/07/2021
Misc
Informational
10/07/2021
10-7-21 10:37 AN Forms are in place and aggregate is present and compacted
Sidewalk Inspection Passed 10/15/2021 10/15/2021 10/12/2021
Misc
Informational
10/07/2021
10-7-21 10:37 AN Forms are in place and aggregate is present and compacted
Misc
Informational
10/12/2021
10-12-21 AN sidewalk looks good and meets ADA specs
Occupancy Inspection - Codes Residential Failed 10/21/2021 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/21/2021
-Final grade, sod, drainage extensions -All boxes in combustible surfaces to be flush face of surface per 3906.5 -Complete stair rail -Provide security screws per chapter 7 all locations
Occupancy Inspection - Codes Residential Temporary C of O 10/27/2021 10/27/2021 10/27/2021
Misc
Corrective Action Required
10/21/2021
-Final grade, sod, drainage extensions -obtain an irrigation permit and provide a back flow certification
Occupancy Inspection - Codes Residential Full C of O 12/10/2021 12/10/2021 12/10/2021
Misc
Corrective Action Required
10/27/2021
-Final grade, sod, drainage extensions -obtain an irrigation permit and provide a back flow certification
Documents & Images
Date Uploaded File Type Document Name
12/29/2020 Application Form Permit Application and License Tax Form
12/29/2020 Approved Plans Approved Drawings
12/29/2020 Approved Plans Approved Truss Layout
12/29/2020 Approved Plans Approved Truss Package
12/29/2020 Letter Codes Residential Plan Review
12/30/2020 Plot Plan Approved Plot Plan
01/04/2021 Receipt Receipt for transaction:2021-000002
01/04/2021 Letter DS Building Permit
03/01/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/17/2021 Letter INSPECTION SUMMARY
03/24/2021 W1-18 Woodside Ridge Footing Inspection
03/24/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/30/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/20/2021 W1-18 truss repairs
07/21/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Receipt Receipt for transaction:2021-007939
10/21/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter Codes Temporary Certificate of Occupancy
12/10/2021 Letter Codes Final Certificate of Occupancy
12/10/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home