Summary
PRRES20204751
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK TILE ROOF
12/14/2020
12/21/2020
06/13/2021
09/15/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MIKE@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/23/2020 12/21/2020
Kim Brennan
Lot elevations
Corrective Action Required
12/21/2020

Existing and finish elevations at all property corners must be provided on the plot plan. The property corner elevations in the rear do not match the MDP. The are off by a few feet. Please explain.
City infrustructure
Corrective Action Required
12/21/2020

Show all manholes, water valve boxes, fire hydrants, and stormwater structures.
Residential Plan Review Approved 12/23/2020 12/21/2020
Kim Brennan
Plot Plan Review Rejected 12/16/2020 12/15/2020
Kim Brennan
Lot elevations
Corrective Action Required
12/14/2020

Existing and finish elevations at all property corners must be provided on the plot plan. The property corner elevations in the rear do not match the MDP. The are off by a few feet. Please explain.
City infrustructure
Corrective Action Required
12/14/2020

Show all manholes, water valve boxes, fire hydrants, and stormwater structures.
Residential Plan Review Approved 12/16/2020 12/14/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $993.98 $993.98 Paid 12/21/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/21/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/21/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/21/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/21/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/21/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/30/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 08/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 2/19/2021 (1:00) 2/19/2021 02/19/2021
Water Service Inspection - R Passed 2/24/2021 (1:00) 2/24/2021 02/24/2021
Footing Inspection - Residential Failed 2/25/2021 02/25/2021
Misc
Corrective Action Required
02/25/2021
- NO FOOTING INSPECTION ON RCORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR -
Erosion Control Inspection Residential Failed 2/25/2021 02/25/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/25/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROVIDE GRAVEL FILTER AT DRIVEWAY - - PROVIDE SILT FENCE -
Underslab Plumbing Inspection - Residential Passed 2/25/2021 2/25/2021 02/25/2021
Footing Inspection - Residential Passed 1/19/2021 02/26/2021
Misc
Resolved
02/26/2021
- NO FOOTING INSPECTION ON RCORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR -
Misc
Informational
02/26/2021
3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL - - UFER LOCATED IN CENTER OF SOUTH (REAR) GARAGE FOUNDATION WALL -
Electrical Service Inspection Passed 4/26/2021 4/26/2021 04/26/2021
Gas Service Inspection - Residential Failed 4/26/2021 4/26/2021 04/26/2021
All Rough Inspection - Residential Failed 4/26/2021 4/26/2021 04/26/2021
Misc
Corrective Action Required
04/26/2021
-Braced wall method PFH. Anchor bolts per code, continuous studs per code, continue fastening per detail, two rows of 16D sinker nails 3” oc at braced wall panel top plates per plan, see section view of detail -Install flashing were required, exterior openings -Repair damaged vapor barrier throughout -Deck ledger attachment to structure per code -Deck post/beam connections per code -Provide proper connection device at deck rim to ledger connection -Comply with required fire separation distance per Table R302.1(1) -Interior wall bracing per plan -Tighten anchor bolts throughout -Minimum 12” field 6” edge exterior sheathing fastening at braced wall panels, Ensure sheathing is properly fastened to framing -Anchor bolt within 12 inches of plate splice or end, multiple throughout -Fireblock top plate Penetrations at garage/dwelling separation wall -Secure receptacle outlet boxes, laundry -Complete framing furr outs with proper fire blocking -Return air is prohibited from closets and bathrooms, remove transom above door between walk-in closet and master bath -Nail plate protection at Conductor stud Penetration, master bed -Provide attic access -Exterior Braced wall Method CS-PF fastening per plan, living room exterior wall -Provide proper support of covered deck LVL beam -Complete electrical installation at fireplace, also provide protection from physical damage at NM Conductor entrance into metallic fireplace cabinet -Complete gas piping installation at fireplace, also secure shielded CSST at fireplace -Nail plate protection at Conductor stud Penetration, bed two -Pressure test gas piping minimum 10 psi for 15 minutes -Maintain minimum clearance to combustibles of single wall flex vent connector connector -Continue framing basement east and west corners, rear of structure -Fireblock all through floor Penetrations -Address floor joist notched in middle third at tub trap east side -Double joist under interior non-loadbearing walls per plan -Continue truss hold down installation -Properly fasten truss hangers throughout -Properly fasten box ceiling corners in master -Truss hangers per plan -Girder truss bearing per plan, see roof framing notes -Truss lateral bracing per plan
Erosion Control Inspection Residential Failed 04/26/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/25/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
All Rough Inspection - Residential Not Ready 5/5/2021 5/5/2021 05/05/2021
Misc
Corrective Action Required
04/26/2021
-Braced wall method PFH. Anchor bolts per code, continuous studs per code, continue fastening per detail, two rows of 16D sinker nails 3” oc at braced wall panel top plates per plan, see section view of detail -Install flashing were required, exterior openings -Repair damaged vapor barrier throughout -Deck ledger attachment to structure per code -Deck post/beam connections per code -Provide proper connection device at deck rim to ledger connection -Comply with required fire separation distance per Table R302.1(1) ( SOLID BLOCKING TOP PLATE TO ROOF DECK ) -Interior wall bracing per plan -Tighten anchor bolts throughout -Minimum 12” field 6” edge exterior sheathing fastening at braced wall panels, Ensure sheathing is properly fastened to framing -Anchor bolt within 12 inches of plate splice or end, multiple throughout (& TIGHTEN ANCHOR BOLTS) -Fireblock top plate Penetrations at garage/dwelling separation wall ( NEAR GARAGE TO DWELLING DOOR TOP PLATE ) -Secure receptacle outlet boxes, laundry !! -Complete framing furr outs with proper fire blocking -Return air is prohibited from closets and bathrooms, remove transom above door between walk-in closet and master bath -Nail plate protection at Conductor stud Penetration, master bed -Provide attic access -Exterior Braced wall Method CS-PF fastening per plan, living room exterior wall -Provide proper support of covered deck LVL beam -Complete electrical installation at fireplace, also provide protection from physical damage at NM Conductor entrance into metallic fireplace cabinet -Complete gas piping installation at fireplace, also secure shielded CSST at fireplace -Nail plate protection at Conductor stud Penetration, bed two -Pressure test gas piping minimum 10 psi for 15 minutes -Maintain minimum clearance to combustibles of single wall flex vent connector connector -Continue framing basement east and west corners, rear of structure -Fireblock all through floor Penetrations -Address floor joist notched in middle third at tub trap east side -Double joist under interior non-loadbearing walls per plan -Continue truss hold down installation -Properly fasten truss hangers throughout -Properly fasten box ceiling corners in master -Truss hangers per plan -Girder truss bearing per plan, see roof framing notes -Truss lateral bracing per plan
Gas Service Inspection - Residential Passed 5/13/2021 05/13/2021
All Rough Inspection - Residential Failed 5/13/2021 5/13/2021 05/13/2021
Misc
Corrective Action Required
05/05/2021
- TYVEK TAPE NAIL PENETRATIONS -Repair damaged vapor barrier throughout -Deck ledger attachment to structure per code -Deck post/beam connections per code -Provide proper connection device at deck rim to ledger connection -Comply with required fire separation distance per Table R302.1(1) ( SOLID BLOCKING TOP PLATE TO ROOF DECK ) : SEAL GAPS & PENETRATIONS : -Complete framing furr outs with proper fire blocking -Exterior Braced wall Method CS-PF fastening per plan, living room exterior wall -Provide proper support of covered deck LVL beam -Maintain minimum clearance to combustibles of single wall flex vent connector connector -Address floor joist notched in middle third at tub trap east side -Continue truss hold down installation -Properly fasten truss hangers ( FRONT BEDROOM )
Driveway Inspection Partial 5/21/2021 05/21/2021
Misc
Informational
05/21/2021
JJACKSON Driveway 5/21/21 Forms and materials passed pre-inspection.
Driveway Inspection Passed 5/28/2021 5/28/2021 05/28/2021
Misc
Informational
05/21/2021
JJACKSON Driveway 5/21/21 Forms and materials passed pre-inspection.
Misc
Informational
05/28/2021
Finished driveway meets LS and ADA specs. RP 5-28-21
All Rough Inspection - Residential Passed 6/9/2021 6/9/2021 06/09/2021
Misc
Resolved
06/09/2021
Sidewalk Inspection Partial 7/19/2021 7/19/2021 07/20/2021
Misc
Informational
07/20/2021
Sidewalk was formed and rock was compacted. Also made them clean up in front of the house before passing the pre-pour. The forms appear to meet ADA standards.
Deck Final Inspection - Residential Failed 8/23/2021 8/23/2021 08/23/2021
Miscellaneous Correction
Corrective Action Required
08/23/2021
**8-23-21 -Deck incomplete -Piers not poured, not inspected and full of water -This inspection will be performed at occupancy
Deck Final Inspection - Residential Failed 8/24/2021 8/24/2021 08/24/2021
Miscellaneous Correction
Corrective Action Required
08/23/2021
**8-23-21 -Deck incomplete -Piers not poured, not inspected and full of water -This inspection will be performed at occupancy : 8/24/21: NO DECK PIER INSPECTION ON RECORD CITY APPROVED PLANS SHOW COVERED DECK ONLY OPEN DECK WITH STAIRWAY HAS BEEN ADDED TO COVERED DECK THIS IS NOT ON PLANS COVERED DECK PIERS NOT PER PLAN DETAIL K (1) 24 X 36 WITH (4) # 4 VERTICAL BARS DETAIL H (2) 18 X 36 WITH (4) # 4 VERTICAL BARS PROVIDE DETAILS FOR UNCOVERED DECK & STAIRS
Erosion Control Inspection Residential Failed 8/31/2021 08/31/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/26/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/31/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE UNTIL SOD COMPLETE - - CLEAN STREET -
Occupancy Inspection - Codes Residential Failed 8/31/2021 8/31/2021 08/31/2021
Miscellaneous Correction
Corrective Action Required
08/31/2021
Submit back flow certification lawn irrigation Sidewalk inspection pending Provide final grade Remove Constructiion debris from lot Provide sod & splash blocks Sump shall discharges 36" from foundation Guards shall not have openings that allow passage of a sphere 4" in diameter No deck pier inspection on record for covered deck ( revised plan calls for pier L to be 28" diameter x 36" depth measured 18" diameter last week before patio slab poured )
Occupancy Inspection - Codes Residential Temporary C of O 9/3/2021 9/3/2021 09/03/2021
Miscellaneous Correction
Corrective Action Required
08/31/2021
Submit back flow certification lawn irrigation Sidewalk inspection pending Provide final grade Remove Constructiion debris from lot Provide sod & splash blocks Sump shall discharges 36" from foundation No deck pier inspection on record for covered deck ( revised plan calls for pier L to be 28" diameter x 36" depth measured 18" diameter last week before patio slab poured )
Erosion Control Inspection Residential Passed 09/15/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/15/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/15/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE UNTIL SOD COMPLETE - - CLEAN STREET -
Occupancy Inspection - Codes Residential Failed 9/15/2021 9/15/2021 09/15/2021
Miscellaneous Correction
Corrective Action Required
09/03/2021
-Sidewalk inspection pending -No deck pier inspection on record for covered deck ( revised plan calls for pier L to be 28" diameter x 36" depth measured 18" diameter last week before patio slab poured )
Occupancy Inspection - Codes Residential Full C of O 9/15/2021 09/15/2021
Miscellaneous Correction
Resolved
09/15/2021
-No deck pier inspection on record for covered deck ( revised plan calls for pier L to be 28" diameter x 36" depth measured 18" diameter last week before patio slab poured )
Deck Final Inspection - Residential Passed 09/15/2021
Miscellaneous Correction
Resolved
09/15/2021
**8-23-21 -Deck incomplete -Piers not poured, not inspected and full of water -This inspection will be performed at occupancy : 8/24/21: NO DECK PIER INSPECTION ON RECORD CITY APPROVED PLANS SHOW COVERED DECK ONLY OPEN DECK WITH STAIRWAY HAS BEEN ADDED TO COVERED DECK THIS IS NOT ON PLANS COVERED DECK PIERS NOT PER PLAN DETAIL K (1) 24 X 36 WITH (4) # 4 VERTICAL BARS DETAIL H (2) 18 X 36 WITH (4) # 4 VERTICAL BARS PROVIDE DETAILS FOR UNCOVERED DECK & STAIRS
Sidewalk Inspection Passed 9/15/2021 9/15/2021 09/15/2021
Misc
Informational
07/20/2021
Sidewalk was formed and rock was compacted. Also made them clean up in front of the house before passing the pre-pour. The forms appear to meet ADA standards.
Misc
Informational
09/15/2021
Finished sidewalk meets LS and ADA specs. RP 9-15-21
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home