Summary
PRRES20204479
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE = PARTIAL FINISHED BASEMENT - COVERED DECK
11/30/2020
12/03/2020
05/29/2021
08/19/2021
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
JIM@SABHOMES.COM  
C&S Electric, Address:2403 Willow st, Phone:(816) 565-3815  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/07/2020 12/03/2020
Kim Brennan
Deck location
Corrective Action Required
12/03/2020

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered deck
Residential Plan Review Approved 12/07/2020 12/03/2020
Kim Brennan
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
12/03/2020

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Misc
Corrective Action Required
12/03/2020

Plumbing contractor needs to renew his business license
Plot Plan Review Rejected 12/02/2020 11/30/2020
Kim Brennan
Deck location
Corrective Action Required
11/30/2020

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered deck
Residential Plan Review Rejected 12/02/2020 11/30/2020
Kim Brennan
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
11/30/2020

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Misc
Corrective Action Required
11/30/2020

Plumbing contractor needs to renew his business license
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $941.17 $941.17 Paid 12/03/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/03/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/03/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/03/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/03/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/03/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 1/8/2021 1/8/2021 01/08/2021
Erosion Control Inspection Residential Failed 01/08/2021
Misc
Corrective Action Required
01/08/2021
Erosion control requires continuous maintenance. Repair damage sections within two business days, immediate Street clean up required.
Miscellaneous Inspection Failed 01/08/2021
Misc
Corrective Action Required
01/08/2021
Provide site address
Footing Inspection - Residential Passed 01/08/2021
Sewer Service Inspection - R Passed 1/14/2021 (1:00) 1/14/2021 01/14/2021
Water Service Inspection - R Partial 1/15/2021 (11:00) 1/15/2021 01/14/2021
Misc
Informational
01/14/2021
Water service approved from structure to metallic connection customer side of meter
Water Service Inspection - R Passed 01/15/2021
Misc
Resolved
01/15/2021
Water service approved from structure to metallic connection customer side of meter
Piers/Caissons Inspection - Residential Passed 2/2/2021 (8:30) 2/2/2021 02/02/2021
Erosion Control Inspection Residential Failed 02/02/2021
Misc
Corrective Action Required
01/08/2021
Erosion control requires continuous maintenance. Repair damage sections within two business days -immediate Street clean up required. -No further inspections until issues are resolved
Miscellaneous Inspection Failed 02/02/2021
Misc
Corrective Action Required
01/08/2021
Post site address
Erosion Control Inspection Residential Passed 02/02/2021
Misc
Resolved
02/02/2021
Erosion control requires continuous maintenance. Repair damage sections within two business days -immediate Street clean up required. -No further inspections until issues are resolved
Miscellaneous Inspection Passed 02/02/2021
Misc
Resolved
02/02/2021
Post site address
All Rough Inspection - Residential Failed 3/10/2021 03/10/2021
Misc
Corrective Action Required
03/10/2021
portal opening not framed per detail, issues discussed onsite with framer
All Rough Inspection - Residential Partial 3/12/2021 3/12/2021 03/11/2021
Misc
Resolved
03/11/2021
portal opening not framed per detail, issues discussed onsite with framer
Gas Service Inspection - Residential Failed 4/30/2021 4/30/2021 04/30/2021
Misc
Corrective Action Required
04/30/2021
Bond gas piping due to the use of non-shielded CSST Pressure test approved
Electrical Service Inspection Passed 4/30/2021 4/30/2021 04/30/2021
All Rough Inspection - Residential Failed 4/29/2021 4/29/2021 04/30/2021
Misc
Corrective Action Required
04/30/2021
-Minimum 12” field 6” edge exterior sheathing fastening -Provide intersystem bonding termination -Deck beam/column connections per code -Anchor bolt required within 12 inches of plate splice or end, multiple throughout -Conductors are prohibited to run the long dimension in return air Plenums, mud room -Conductors parallel with framing required to be secured minimum 1.25” from the face of the framing member, throughout -Complete low-voltage installation, hanging Conductor in Garage -Provide proper nail plate protection at top plate Penetration, Radon piping -Top plate spices to offset minimum 24 inches, entry (2) -Ground all metallic outlet boxes -Nail plate protection at Conductor stud Penetrations Where the hole is less than 1.25” from the edge of the framing member, throughout -Hardwired and interconnected smoke/carbon monoxide alarms required in the immediate vicinity outside of bedrooms -Collar ties or straps at all ridges -Address cutouts in exterior sheathing at top plate, west side main level -Fireblock main bath ceiling level at supply duct -Fireblock top plate Penetration in main level bath -Nail plate protection at Conductor top and bottom plate Penetrations where the penetration is less than 1.25” from the edge of the plate, throughout -Fireblock top plate Penetration, master bedroom -Protect NM conductors from physical damage minimum 6” AFF at floor penetrations -Fireblock through floor Penetration, CSST at fireplace -Security blocking at exterior doors -Four loadbearing studs under 16” LVL at kitchen wall -Fireblock top plate Penetration, kitchen -Garage/dwelling separation wall bottom plate fastening per plan -Inadequate fireblock between top plates at furr out construction, East and west basement wall -Fireblock top plate Penetration east basement wall -Ensure exterior sheathing is fastened to studs properly, basement right of walkout door -Provide bearing support for stair landing, Also provide joist hangers -Bond concrete encased electrode to grounding system -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Properly secure SE cable at panel termination -Solid blocking over beams per plan -Solid blocking where Joist run parallel with foundation per plan -Provide outlet box in the basement bedroom -Properly fireblock vertical to horizontal at soffit/drop ceiling to wall connections -Fireblock top plate Penetrations, basement bathroom -Provide nail plate protection at DWV top plate Penetration, basement bathroom -Bond gas piping due to the use of non-shielded CSST -12” oc fastening, stud to stud and abutting studs at intersecting braced walls, Basement bedroom -Joist lap and fastening per code, basement bedroom -Fireblock top plate Penetration, basement bedroom -Fasten headers to King studs per code -Perlin Support per plan -End support of ridges, hips and valleys -Verify proper connection of B vent to flex B vent transition in attic space
Gas Service Inspection - Residential Passed 5/5/2021 5/5/2021 05/05/2021
Misc
Resolved
05/05/2021
Bond gas piping due to the use of non-shielded CSST Pressure test approved
All Rough Inspection - Residential Failed 5/5/2021 5/5/2021 05/05/2021
Misc
Corrective Action Required
04/30/2021
-Minimum 12” field 6” edge exterior sheathing fastening -Deck beam/column connections per code -Conductors parallel with framing required to be secured minimum 1.25” from the face of the framing member, throughout -Provide proper nail plate protection at top plate Penetration, Radon piping -Ground all metallic outlet boxes, floor box -Nail plate protection at Conductor stud Penetrations Where the hole is less than 1.25” from the edge of the framing member, throughout -Collar ties or straps at all ridges, garage -Nail plate protection at Conductor top and bottom plate Penetrations where the penetration is less than 1.25” from the edge of the plate, throughout -Solid blocking over beams per plan -Provide outlet box in the basement bedroom -Properly fireblock vertical to horizontal at soffit/drop ceiling to wall connections, Basement bedroom closet -Provide nail plate protection at DWV top plate Penetration, basement bathroom -Joist lap and fastening per code, basement bedroom
All Rough Inspection - Residential Passed 5/7/2021 5/7/2021 05/07/2021
Misc
Resolved
05/07/2021
-Minimum 12” field 6” edge exterior sheathing fastening -Deck beam/column connections per code -Conductors parallel with framing required to be secured minimum 1.25” from the face of the framing member, throughout -Provide proper nail plate protection at top plate Penetration, Radon piping -Nail plate protection at Conductor stud Penetrations Where the hole is less than 1.25” from the edge of the framing member, throughout -Collar ties or straps at all ridges, garage -Provide nail plate protection at DWV top plate Penetration, basement bathroom
Driveway Inspection Partial 7/13/2021 07/13/2021
Misc
Informational
07/13/2021
7/13/21 13:38- Rock is placed and has been tamped and the depth of drive is 6in. Good to pour, no contact to the contractor, so they need to make sure they are using the KCMMB 4K mix with the white cure.
Driveway Inspection Passed 7/15/2021 7/15/2021 07/15/2021
Misc
Informational
07/13/2021
7/13/21 13:38- Rock is placed and has been tamped and the depth of drive is 6in. Good to pour, no contact to the contractor, so they need to make sure they are using the KCMMB 4K mix with the white cure.
Misc
Informational
07/15/2021
7/15/21 8:10- Drive has expansion joints on the curb and easement and is cured.
Occupancy Inspection - Codes Residential Temporary C of O 8/10/2021 8/10/2021 08/10/2021
Miscellaneous Correction
Resolved
08/10/2021
Miscellaneous Correction
Corrective Action Required
08/10/2021
TCO until 9-7-21 -Maintain erosion control at perimeter until sod is in place -Final grade, sod, splash blocks, sump discharge -Obtain lawn sprinkler permit and backflow certification -Provide angle bracket and ledger locks at end joist at deck -Secure whip at AC -Provide tamper resistant schrader valve covers at AC -Seal top of AC disconnect, meter can, and all exterior penetrations
Plot Plan Inspection Passed 8/19/2021 8/19/2021 08/19/2021
Occupancy Inspection - Codes Residential Full C of O 8/19/2021 8/19/2021 08/19/2021
Miscellaneous Correction
Resolved
08/19/2021
Miscellaneous Correction
Resolved
08/19/2021
Documents & Images
Date Uploaded File Type Document Name
11/30/2020 Application Form Permit Application
11/30/2020 Application Form License Tax Form
11/30/2020 E746 - Air Combustion Calcs
11/30/2020 E746 - Final Plot Plan 11_24_2020
11/30/2020 Letter Codes Residential Plan Review
12/03/2020 Approved Plans Approved Drawings
12/03/2020 Plot Plan Approved Plot Plan
12/03/2020 Receipt Receipt for transaction:2020-007858
12/03/2020 Letter DS Building Permit
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 M L Crose 2357 SW Hickory Ln LSMO Eagle Creek Lot 746 SAB Homes P 2020-4479 3rd Party Footing Inspection Report 12-17-20
01/08/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/15/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/07/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter Codes Temporary Certificate of Occupancy
08/10/2021 Letter Codes Temporary Certificate of Occupancy
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter Field Certificate of Occupancy
08/19/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home