Summary
PRRES20204249
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - ROOF TRUSS - COVERED DECK
11/10/2020
12/17/2020
08/31/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/12/2020 12/17/2020
Dylan Eppert
Planning Review (RES) Approved 11/18/2020 11/16/2020
Dylan Eppert
Residential Plan Review Approved 11/12/2020 11/16/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $990.38 $990.38 Paid 12/17/2020
8331507-Sewer Connection Fee $420.00 $420.00 Paid 12/17/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/17/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/17/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/17/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/17/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/23/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/23/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/23/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/23/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 1/7/2021 01/07/2021
Misc
Corrective Action Required
01/07/2021
- FOOTING & FOUNDATION POURED NO 3RD PARTY INSPECTION SUBMITTED IN 48 HOURS -
Footing Inspection - Residential Passed 12/28/2020 at 9:25 AM 01/20/2021
Misc
Resolved
01/20/2021
- FOOTING & FOUNDATION POURED NO 3RD PARTY INSPECTION SUBMITTED IN 48 HOURS -
Misc
Informational
01/20/2021
3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL
Underslab Plumbing Inspection - Residential Passed 1/21/2021 1/21/2021 01/21/2021
Piers/Caissons Inspection - Residential Passed 2/26/2021 (8:15) 2/26/2021 02/26/2021
Misc
Informational
02/26/2021
(2) 24 x 36 W/ (4) # 4 VERT BARS
Sewer Service Inspection - R Passed 3/9/2021 03/09/2021
Water Service Inspection - R Passed 3/11/2021 (8:00) 3/11/2021 03/11/2021
All Rough Inspection - Residential Not Ready 3/30/2021 3/30/2021 03/30/2021
Misc
Corrective Action Required
03/30/2021
- NO CITY APPROVED PLANS ON SITE - - NO INSPECTION -
Electrical Service Inspection Passed 4/1/2021 04/01/2021
Gas Service Inspection - Residential Passed 4/1/2021 04/01/2021
All Rough Inspection - Residential Failed 4/1/2021 4/1/2021 04/01/2021
Misc
Resolved
04/01/2021
- NO CITY APPROVED PLANS ON SITE - - NO INSPECTION -
Misc
Corrective Action Required
04/01/2021
Fire block B vent at ceiling garage Fire block soffits basement gym & bath Missing windows sales office Insulate cantilever as required prior to blocking ( 2.32 entry coat closet) Fire block top plate at single car garage & bed #2 front wall, SGD, & nail braced wall panels per code Provide LIB bath #2 / hall Vertical fire block every 10' bed #3 Tighten anchor bolt gym closet Seal all low volt upward penetrations Provide HUS26 truss B2 sales office Provide lateral bracing per truss specs C-7 Tighten anchor bolts garage Provide flashing above horizontal trim window under deck
All Rough Inspection - Residential Not Ready 4/7/2021 4/7/2021 04/07/2021
Misc
Corrective Action Required
04/01/2021
Fire block B vent at ceiling garage Fire block soffits basement gym & bath Missing windows sales office Insulate cantilever as required prior to blocking ( 2.32 entry coat closet) Fire block top plate at single car garage & bed #2 front wall, SGD, & nail braced wall panels per code
All Rough Inspection - Residential Failed 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/07/2021
-Provide full depth solid blocking, cantilever coat closet at entry -nail braced wall panels per code, garage & front bed room top of sheathing is below top plates.
All Rough Inspection - Residential Passed 4/13/2021 4/13/2021 04/13/2021
Misc
Resolved
04/13/2021
Driveway Inspection Partial 5/5/2021 5/5/2021 05/05/2021
Misc
Informational
05/05/2021
Forms were placed and aggregate was present and compacted. RP 5-5-21
Driveway Inspection Passed 5/14/2021 5/14/2021 05/14/2021
Misc
Informational
05/05/2021
Forms were placed and aggregate was present and compacted. RP 5-5-21
Misc
Informational
05/14/2021
Finished driveway meets LS specs. RP 5-14-21
Occupancy Inspection - Codes Residential Failed 6/23/2021 6/23/2021 06/23/2021
Misc
Corrective Action Required
06/23/2021
-Resolve outstanding inspection fees before final c of o -Final grade and sod -splash blocks at all sump pump and downspout discharge locations, min 36” discharge from foundation -Install light fixture at basement bath vanity, exposed NM at wall -Full height continuous 6x6 cedar posts at deck per plans -(2) 1/2" through bolts required at each post/beam connection at deck R507.5.1(2) -Inspection will be required of garage used as sales office after conversion back to garage for sale
Plot Plan Inspection Passed 7/15/2021 07/15/2021
Occupancy Inspection - Codes Residential Temporary C of O 7/15/2021 7/15/2021 07/15/2021
Misc
Corrective Action Required
06/23/2021
-Full height continuous 6x6 cedar posts at deck per plans -(2) 1/2" through bolts required at each post/beam connection at deck R507.5.1(2) -Inspection will be required of garage used as sales office after conversion back to garage for sale
Deck Final Inspection - Residential Passed 8/31/2022 08/31/2022
Occupancy Inspection - Codes Residential Full C of O 8/31/2022 8/31/2022 08/31/2022
Misc
Resolved
08/31/2022
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home