Permit Application Status

PRRES20203775


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20203775
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - UNFINISHED BASEMENT
10/16/2020
11/02/2020
04/20/2021
09/12/2022
Locations
Contacts
IQ CONSTRUCTION, Address:P O BOX 6423, Phone:(816) 582-8100  
JENNIFER@IQHOMEBUILDERS.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SAFEHOUSE ELECTRIC COMPANY, Address:P O BOX 1833, Phone:(816) 935-8113  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/26/2020 10/22/2020
Dylan Eppert
Basement egress
Corrective Action Required
10/22/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan. THE TOP DRAWING SHOWS TWO EGRESS WELLS AND THE BOTTOM DRAWING SHOWS ONE PLEASE REVISE.
Miscellaneous Correction
Corrective Action Required
10/22/2020

TOP DRAWING SHOWS DECK AND BOTTOM DRAWING SHOWS COVERED PATIO PLEASE REVISE.
Sidewalks
Corrective Action Required
10/22/2020

Sidewalks with dimensions must be provided on the plot plan.
Residential Plan Review Approved 10/26/2020 10/22/2020
Dylan Eppert
Plot Plan Review Rejected 10/20/2020 10/21/2020
Dylan Eppert
Basement egress
Corrective Action Required
10/21/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan. THE TOP DRAWING SHOWS TWO EGRESS WELLS AND THE BOTTOM DRAWING SHOWS ONE PLEASE REVISE.
Miscellaneous Correction
Corrective Action Required
10/21/2020

TOP DRAWING SHOWS DECK AND BOTTOM DRAWING SHOWS COVERED PATIO PLEASE REVISE.
Sidewalks
Corrective Action Required
10/21/2020

Sidewalks with dimensions must be provided on the plot plan.
Residential Plan Review Approved 10/20/2020 10/21/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,017.55 $1,017.55 Paid 11/02/2020
8331507-Sewer Connection Fee $420.00 $420.00 Paid 11/02/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 11/02/2020
Water Meter Fee $455.54 $455.54 Paid 11/02/2020
Right of Way Permit Fee $80.00 $80.00 Paid 11/02/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/02/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/9/2020 (3:00) 12/9/2020 12/09/2020
Sewer Service Inspection - R Passed 1/19/2021 (1:00) 1/19/2021 01/19/2021
Water Service Inspection - R Passed 1/20/2021 (3:00) 1/20/2021 01/20/2021
Underslab Plumbing Inspection - Residential Passed 2/1/2021 2/1/2021 02/01/2021
All Rough Inspection - Residential Failed 3/10/2021 3/10/2021 03/10/2021
Misc
Corrective Action Required
03/10/2021
Portal frame -Two rows of 16D sinker nails 3” oc at braced wall panel top plates per plan, see section view of detail -Fasten exterior hold down devices -install interior tension straps
All Rough Inspection - Residential Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/19/2021
Disregard previous all rough ispection report with a passed status. This inspection was for portal framing only and should have been entered as a partial approval. Portal frame approved
Piers/Caissons Inspection - Residential Passed 3/29/2021 (9:00) 3/29/2021 03/29/2021
All Rough Inspection - Residential Failed 4/22/2021 4/22/2021 04/22/2021
Misc
Corrective Action Required
04/22/2021
-Install flashing at plumbing vent roof penetration -Tighten anchor bolts -Rafter bearing per plan -Provide joist hanger at headered Joist in garage -Provide engineered solution for vertically drilled LVL header at portal opening -Minimum 12” field 6” edge exterior sheathing fastening, Ensure sheathing is properly fastened to framing throughout -Fireblock through floor Penetrations -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Fireblock top plate Penetration in kitchen -Fasten ceiling Joist laps per code -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Nail plate protection at Conductor stud Penetration bedroom three -Strap noncontinuous studs at gable wall, Second-floor bathroom -Provide stud shoe at loadbearing over bored stud bedroom three -Fireblock top plate Penetrations bed 2 -Secure SE cable at panel termination -Bond gas piping due to the use of non-shielded CSST, Gas pressure test approved -Exterior walls and garage/dwelling separation wall bottom plate fastening per plan -Parallel/perpendicular beam to wall connection per plan
Electrical Service Inspection Passed 4/22/2021 4/22/2021 04/22/2021
Gas Service Inspection - Residential Failed 4/22/2021 4/22/2021 04/22/2021
Misc
Corrective Action Required
04/22/2021
Bond gas piping
All Rough Inspection - Residential Failed 4/28/2021 4/28/2021 04/28/2021
Misc
Corrective Action Required
04/22/2021
-Rafter bearing per plan or provide engineered solution for repair -Minimum 12” field 6” edge exterior sheathing fastening, Ensure sheathing is properly fastened to framing, bed 3 -Fireblock all through floor Penetrations -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Strap noncontinuous studs at gable wall, Second-floor bathroom -Parallel/perpendicular beam to wall connection per plan
Gas Service Inspection - Residential Passed 04/28/2021
Misc
Resolved
04/28/2021
Bond gas piping
Erosion Control Inspection Residential Failed 04/28/2021
Misc
Corrective Action Required
04/28/2021
Erosion control requires continuous maintenance, repair damage sections within 48 hours. Immediate Street clean up required. No further inspections until resolved
All Rough Inspection - Residential Failed 5/14/2021 5/14/2021 05/14/2021
Misc
Corrective Action Required
04/28/2021
-Rafter bearing per plan or provide engineered solution for repair Ok to insulate
All Rough Inspection - Residential Failed 05/17/2021
Misc
Corrective Action Required
05/14/2021
-Rafter bearing per plan throughout or provide engineered solution for repair Ok to insulate
All Rough Inspection - Residential Passed 05/18/2021
Misc
Resolved
05/18/2021
-Rafter bearing per plan throughout or provide engineered solution for repair Ok to insulate
Driveway Inspection Passed 7/13/2021 7/13/2021 07/13/2021
Sidewalk Inspection Passed 7/13/2021 7/13/2021 07/13/2021
Occupancy Inspection - Codes Residential Failed 8/18/2021 8/18/2021 08/18/2021
Misc
Corrective Action Required
08/18/2021
-Provide erosion control to protect sidewalk and clean mud from sidewalk and around community mailbox immediately. No further inspections will be performed until this is resolved -Final grade and sod -Downspouts, gutters, splash blocks, drainage extension -Install half bath fixture -Outlet at washer will not trip breaker-GFCI protection required -MIssing cover plates at basement -Missing handrail at basement -Adjust garage entry door to self close and latch -Complete electrical at hot water heater -Breaker labeled master bedroom needs afci protection if tied to master bed receptacles -Secure whip at ac disconnect -Seal all exterior penetrations
Erosion Control Inspection Residential Failed 08/18/2021
Misc
Corrective Action Required
04/28/2021
8-18-21 Erosion control requires continuous maintenance -Provide erosion control to protect sidewalk and clean mud from sidewalk and around community mailbox immediately. No further inspections will be performed until this is resolved
Occupancy Inspection - Codes Residential Failed 8/26/2021 8/26/2021 08/26/2021
Misc
Corrective Action Required
08/18/2021
-Provide erosion control to protect sidewalk and clean mud from sidewalk and around community mailbox immediately. No further inspections will be performed until this is resolved **8-26-21 -Erosion control needs to protect street as wel-don't just simply hose mud from the sidewalk to the street .Clean mud moved sidewalk to street, provide access or door box code, and reschedule -Final grade and sod -Downspouts, gutters, splash blocks, drainage extension -Install half bath fixture -Outlet at washer will not trip breaker-GFCI protection required -MIssing cover plates at basement -Missing handrail at basement -Adjust garage entry door to self close and latch -Complete electrical at hot water heater -Breaker labeled master bedroom needs afci protection if tied to master bed receptacles -Secure whip at ac disconnect -Seal all exterior penetrations
Occupancy Inspection - Codes Residential Temporary C of O 8/30/2021 8/30/2021 08/30/2021
Misc
Corrective Action Required
08/26/2021
-Final grade and sod -Downspouts, gutters, splash blocks, drainage extension OK FOR TCO - TCO EXPIRES 9/27/21
Erosion Control Inspection Residential Passed 9/12/2022 09/12/2022
Misc
Resolved
09/12/2022
8-18-21 Erosion control requires continuous maintenance -Provide erosion control to protect sidewalk and clean mud from sidewalk and around community mailbox immediately. No further inspections will be performed until this is resolved
Plot Plan Inspection Passed 9/12/2022 09/12/2022
Occupancy Inspection - Codes Residential Full C of O 9/12/2022 9/12/2022 09/12/2022
Misc
Resolved
09/12/2022
-Final grade and sod -Downspouts, gutters, splash blocks, drainage extension OK FOR TCO - TCO EXPIRES 9/27/21
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home