Summary
PRRES20202692
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
09/01/2020
09/23/2020
07/06/2021
Locations
Contacts
ASPEN HOME BUILDERS LLC, Address:6618 ROYAL ST #B, Phone:(816) 507-0123  
MCDANIEL FURNACE & SHEET METAL, Address:2905 S M 291 FRONTAGE RD, Phone:(816) 373-6370  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
STEVE@ASPENHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/18/2020 09/22/2020
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
09/16/2020

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide the square footage for the finished basement
Misc
Corrective Action Required
09/16/2020

All pages of the drawings must be stamped by the licensed engineer
Plot Plan Review Approved 09/18/2020 09/21/2020
Kim Brennan
Sidewalks
Corrective Action Required
09/17/2020

Sidewalks with dimensions must be provided on the plot plan.
As-graded plot plan
Corrective Action Required
09/17/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,188.91 $1,188.91 Paid 09/23/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/23/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/23/2020
8331507-Sewer Connection Fee $480.00 $480.00 Paid 09/23/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 09/23/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 09/23/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/13/2020 (3:30) 10/13/2020 10/13/2020
Erosion Control Inspection Residential Passed 10/21/2020
Misc
Resolved
10/21/2020
Please provide erosion control rear of lot
Underslab Plumbing Inspection - Residential Failed 11/10/2020 11/10/2020 11/10/2020
Misc
Corrective Action Required
11/10/2020
Unable to access, backfill foundation or provide safe means of access and reschedule inspection
Erosion Control Inspection Residential Passed 11/10/2020
Misc
Resolved
11/10/2020
Immediate street cleanup required
Underslab Plumbing Inspection - Residential Failed 11/16/2020 11/16/2020 11/16/2020
Misc
Resolved
11/16/2020
Unable to access, backfill foundation or provide safe means of access and reschedule inspection
Misc
Corrective Action Required
11/16/2020
-connect interior under slab draintile to sump pit -extend building drain from interior clean out under the footing, connection would not be accessible when concrete floor is poured
Underslab Plumbing Inspection - Residential Passed 11/18/2020 11/18/2020 11/17/2020
Misc
Resolved
11/17/2020
-connect interior under slab draintile to sump pit -extend building drain from interior clean out under the footing, connection would not be accessible when concrete floor is poured
Erosion Control Inspection Residential Failed 12/08/2020
Misc
Resolved
12/08/2020
Immediate street cleanup required
Misc
Corrective Action Required
12/08/2020
-provide erosion control methods at rear property line and remove debris from drainage swale within two business days
Erosion Control Inspection Residential Failed 01/20/2021
Misc
Corrective Action Required
12/08/2020
-Erosion control requires continuous maintenance. Repair damaged sections within two business days -immediate street cleanup required -no further inspections until issues are resolved
Sewer Service Inspection - R Passed 1/21/2021 (1:00) 1/21/2021 01/21/2021
Water Service Inspection - R Passed 1/22/2021 (1:00) 1/22/2021 01/22/2021
Erosion Control Inspection Residential Failed 02/01/2021
Misc
Partial Correction
02/01/2021
-immediate street cleanup required -no further inspections until issues are resolved
All Rough Inspection - Residential Failed 2/1/2021 2/1/2021 02/01/2021
Misc
Corrective Action Required
02/01/2021
-Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Double top plate spices to offset minimum 24 inches. garage, master bed -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Fireblock top plate penetrations. garage, master bath -Fireblock vertical to horizontal at soffit to wall connection, garage/dwelling separation wall -Furr out duct for insulation, garage/dwelling separation wall garage side -Unable to verify anchor bolt placement, garage west wall -Fireblock vertical to horizontal main level Chase, DWV Joist penetration -address cut double top plate, main level bath Garage/dwelling separation wall -Fireblock vertical to horizontal behind fridge with approved fireblocking materials -Nail plate protection at conductor stud penetrations. kitchen, bed 4 -Provide security blocking at exterior doors -Secure gas piping at fireplace -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Provide rafter ties per plan -Address damaged Ridge support bedroom four exterior wall -Header to King stud fastening per code -Provide adequate spliced Ridge support -Fireblock vertical to horizontal basement bath -Midpoint support for all vertical DWV 2 inch and smaller -Complete HVAC duct installation -Seal all joints in ductwork -Seal penetrations in return air pans -Properly support yellow CSST, basement mechanical room -Mechanically fastened all spliced equipment grounding conductors, smoke/CO alarms -Double all joists under kitchen island
Electrical Service Inspection Passed 2/1/2021 2/1/2021 02/01/2021
Gas Service Inspection - Residential Passed 2/1/2021 2/1/2021 02/01/2021
Gas Piping Inspection - Residential Failed 02/01/2021
Misc
Corrective Action Required
02/01/2021
Properly support CSST at fireplace and basement mechanical room
Erosion Control Inspection Residential Passed 02/04/2021
Misc
Resolved
02/04/2021
-immediate street cleanup required -no further inspections until issues are resolved
All Rough Inspection - Residential Passed 2/8/2021 2/8/2021 02/08/2021
Misc
Resolved
02/08/2021
-Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Double top plate spices to offset minimum 24 inches. garage, master bed -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Fireblock top plate penetrations. garage, master bath -Fireblock vertical to horizontal at soffit to wall connection, garage/dwelling separation wall -Furr out duct for insulation, garage/dwelling separation wall garage side -Unable to verify anchor bolt placement, garage west wall -Fireblock vertical to horizontal main level Chase, DWV Joist penetration -address cut double top plate, main level bath Garage/dwelling separation wall -Fireblock vertical to horizontal behind fridge with approved fireblocking materials -Nail plate protection at conductor stud penetrations. kitchen, bed 4 -Provide security blocking at exterior doors -Secure gas piping at fireplace -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Provide rafter ties per plan -Address damaged Ridge support bedroom four exterior wall -Header to King stud fastening per code -Provide adequate spliced Ridge support -Fireblock vertical to horizontal basement bath -Midpoint support for all vertical DWV 2 inch and smaller -Complete HVAC duct installation -Seal all joints in ductwork -Seal penetrations in return air pans -Properly support yellow CSST, basement mechanical room -Mechanically fastened all spliced equipment grounding conductors, smoke/CO alarms -Double all joists under kitchen island
Gas Piping Inspection - Residential Passed 2/8/2021 2/8/2021 02/08/2021
Misc
Resolved
02/08/2021
Properly support CSST at fireplace and basement mechanical room
Sidewalk Inspection Passed 4/22/2021 4/22/2021 04/26/2021
Plot Plan Inspection Passed 5/19/2021 05/19/2021
Piers/Caissons Inspection - Residential Passed 06/01/2021
Occupancy Inspection - Codes Residential Failed 6/1/2021 6/1/2021 06/01/2021
Misc
Corrective Action Required
06/01/2021
-Driveway inspection pending, contact Development Services to resolve this issue -Irrigation permit required -Final grading and sod -Return adjoining lot to original condition -Downspouts and sump piping to discharge minimum 36 inches from foundation -Seal all exterior penetrations -Address damaged conductor insulation, ungrounded Conductor in AC disconnect -Handrail required at stairs to rear patio -Guard rail required where grade below exceeds 30 inches, front stoop -Complete plumbing installation throughout -address faulty GFCI receptacles at kitchen counter top -Complete safety glass shower enclosure, master bath
Driveway Inspection Passed 4/22/2021 4/22/2021 06/02/2021
Misc
Informational
06/02/2021
On Wednesday, 6-03-2020. I performed a field inspection of the driveway at the location and passed the driveway installed.
Occupancy Inspection - Codes Residential Temporary C of O 6/3/2021 6/3/2021 06/03/2021
Misc
Corrective Action Required
06/01/2021
-Irrigation permit required -Final grading and sod -Return adjoining lot to original condition -Downspouts and sump piping to discharge minimum 36 inches from foundation TCO VALID THROUGH 7/3/21
Occupancy Inspection - Codes Residential Full C of O 7/6/2021 7/6/2021 07/06/2021
Misc
Resolved
07/06/2021
Documents & Images
Date Uploaded File Type Document Name
09/01/2020 Application Form Permit Application and license tax form
09/17/2020 Letter Codes Residential Plan Review
09/21/2020 Plot Plan Approved Plot Plan
09/22/2020 Approved Plans Approved Drawings
09/23/2020 Receipt Receipt for transaction:2020-006420
09/23/2020 Letter DS Building Permit
10/13/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/21/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/26/2021 Lot 741 EC pier inspection
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/04/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
04/26/2021 Letter INSPECTION SUMMARY
05/18/2021 Plot Plan Approved As Graded Plot Plan
05/19/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter Codes Temporary Certificate of Occupancy
07/06/2021 Letter Field Certificate of Occupancy
07/06/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home