Permit Application Status

PRRES20201997


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201997
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
07/20/2020
07/22/2020
06/04/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 07/22/2020 07/22/2020
Kim Brennan
City infrustructure
Corrective Action Required
07/20/2020

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. I do not show a fire hydrant on the south, west side of this lot
Residential Plan Review Approved 07/22/2020 07/20/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $971.99 $971.99 Paid 07/22/2020
8331504-EFHB Middle Big Creek, Full $435.24 $435.24 Paid 07/22/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 07/22/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 07/22/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 07/22/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/22/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/6/2020 (3:00) 8/6/2020 08/06/2020
Underslab Plumbing Inspection - Residential Failed 9/2/2020 9/2/2020 09/02/2020
Misc
Corrective Action Required
09/02/2020
Continue interior under slab drain from midpoint of east wall along north wall and tie into sump pit with positive or neutral slope
Underslab Plumbing Inspection - Residential Passed 9/15/2020 9/15/2020 09/15/2020
Misc
Resolved
09/15/2020
Sewer Service Inspection - R Passed 12/10/2020 (1:00) 12/10/2020 12/10/2020
Water Service Inspection - R Partial 12/10/2020 12/10/2020 12/10/2020
Misc
Informational
12/10/2020
- PARTIAL INSPECTION ON PEX MID POINT OF YARD TO HOUSE ENTRANCE
Water Service Inspection - R Passed 12/11/2020 (8:45) 12/11/2020 12/11/2020
Misc
Resolved
12/11/2020
Electrical Service Inspection Passed 12/21/2020 12/21/2020 12/21/2020
Gas Piping Inspection - Residential Passed 12/21/2020 12/21/2020 12/21/2020
Gas Service Inspection - Residential Passed 12/21/2020 12/21/2020 12/21/2020
All Rough Inspection - Residential Failed 12/21/2020 12/21/2020 12/21/2020
Misc
Corrective Action Required
12/21/2020
-BOCCA protection plates at top and bottom plate all DWV throughout -Master closet, H2.5 truss hold down missing E wall, (2) H2.5 clips at dbl truss girder -Nail stud shoes at master bath exterior wall -Hip truss master bed H2.5 required -Fireblock at top lid fireplace -Seal top plate penetrations above refrigerator in kitchen -Truss hangers per plans -H2.5 truss clips are covered deck trusses -Structural straps at top plates of all exterior walls and interior load bearing walls bored 50% or more -Tighten all anchor bolts at basement -Fireblock all tub and shower traps -Joist hangers at header above HVAC equipment in basement, over 4’ -Joist hangers at header for DWV S basement, over 4’ -No deck pier inspection performed, submit engineer report -Tighten all lag bolts at deck ledger -Joist hangers at all deck joists
Piers/Caissons Inspection - Residential Failed 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/28/2020
-DECK PIERS POURED WITHOUT INSPECTION - SUBMIT ENGINEER REPORT
Misc
Corrective Action Required
12/28/2020
-DECK PIERS POURED WITHOUT INSPECTION - SUBMIT ENGINEER REPORT
Misc
Resolved
12/28/2020
All Rough Inspection - Residential Failed 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/28/2020
-Master closet, H2.5 truss hold down missing E wall, (2) H2.5 clips at dbl truss girder -Hip truss master bed H2.5 required -Fireblock at top lid fireplace -Truss hangers per plans -H2.5 truss clips are covered deck trusses -EC#2 hold down per plan -Tighten all anchor bolts at basement -Fireblock all tub and shower traps -Joist hangers at header above HVAC equipment in basement, over 4’ -Joist hangers at header for DWV S basement, over 4’ -No deck pier inspection performed, submit engineer report -Tighten all lag bolts at deck ledger -Joist hangers at all deck joists
All Rough Inspection - Residential Failed 12/31/2020 12/31/2020 12/31/2020
Misc
Corrective Action Required
12/28/2020
-EC#2 hold down per plan -No deck pier inspection performed, submit engineer report
All Rough Inspection - Residential Passed 1/6/2021 1/6/2021 01/06/2021
Misc
Resolved
01/06/2021
Driveway Inspection Partial 3/1/2021 3/1/2021 03/02/2021
Misc
Informational
03/02/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 3/1/2021 3/1/2021 03/02/2021
Misc
Informational
03/02/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 3/5/2021 3/5/2021 03/05/2021
Misc
Corrective Action Required
01/06/2021
-Final driveway and sidewalk inspections required -No pier inspection performed at covered deck-Submit engineer letter -Remove all construction debris from lot -Complete final grade -Sod -Complete stone/siding at front of house/garage -Gutters and downspouts required -Splash blocks at all downspout and sump pump discharge locations, minimum 36" discharge from foundation -Seal all penetrations in siding, seal along top of AC disconnect and meter can -(2) bolts at each post/beam connection at deck per code
Driveway Inspection Passed 3/9/2021 3/9/2021 03/22/2021
Misc
Informational
03/02/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 3/9/2021 3/9/2021 03/22/2021
Misc
Informational
03/02/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 5/14/2021 5/17/2021 05/17/2021
Misc
Corrective Action Required
03/05/2021
-No pier inspection performed at covered deck- Submit engineer letter -Complete sidewalk at front of lot -Add splash block or extension to sump pump discharge, min 36" discharge from foundation (2) bolts at each post/beam connection at deck per code, see R507.5.1(2) , (2) 1/2" diameter through bolts required at each post/beam connection
Erosion Control Inspection Residential Passed 05/17/2021
Plot Plan Inspection Passed 05/17/2021
Piers/Caissons Inspection - Residential Passed 6/4/2021 6/4/2021 06/04/2021
Misc
Resolved
06/04/2021
Misc
Resolved
06/04/2021
Occupancy Inspection - Codes Residential Full C of O 6/4/2021 6/4/2021 06/04/2021
Misc
Resolved
06/04/2021
Documents & Images
Date Uploaded File Type Document Name
07/20/2020 Letter Permit Application and license tax form
07/20/2020 Drawing Approved Drawings
07/20/2020 Drawing Approved Truss Layout
07/20/2020 Drawing Approved Truss Package
07/20/2020 Letter Codes Residential Plan Review
07/22/2020 Plot Plan Approved Plot Plan
07/22/2020 Receipt Receipt for transaction:2020-004618
07/22/2020 Letter DS Building Permit
08/06/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/15/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/31/2020 Letter INSPECTION SUMMARY
01/06/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/24/2021 Lot 85 Manor at Stoney Creek Post pour pier inspection
06/04/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter Field Certificate of Occupancy
06/04/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home