Permit Application Status

PRRES20201532


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201532
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS PACKAGE - FINISHED BASEMENT
06/09/2020
06/17/2020
12/21/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/11/2020 06/17/2020
Dylan Eppert
Basement elevation
Corrective Action Required
06/11/2020

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) MDP CALLS OUT DAYLIGHT AND THIS IS A PURPOSED WALKOUT.
Planning Review (RES) Approved 06/15/2020 06/12/2020
Dylan Eppert
Residential Plan Review Approved 06/11/2020 06/11/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,477.00 $3,477.00 Paid 06/17/2020
Water Meter Fee $425.02 $425.02 Paid 06/17/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/17/2020
Valuation Fee New Single Family $1,030.87 $1,030.87 Paid 06/17/2020
Right of Way Permit Fee $80.00 $80.00 Paid 06/17/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/17/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 07/07/2020
Underslab Plumbing Inspection - Residential Passed 7/21/2020 7/21/2020 07/21/2020
Electrical Service Inspection Passed 10/9/2020 10/9/2020 10/09/2020
Gas Piping Inspection - Residential Passed 10/9/2020 10/9/2020 10/09/2020
Gas Service Inspection - Residential Passed 10/9/2020 10/9/2020 10/09/2020
All Rough Inspection - Residential Failed 10/9/2020 10/9/2020 10/09/2020
Misc
Corrective Action Required
10/09/2020
-Tighten/install all anchor bolts in garage -structural straps at all interior load bearing walls and all exterior walls bored 50% or more -seal top plate penetrations bedroom #2 -truss hangers per plans - garage -H2.5 straps at all corner hip trusses -anchor all columns to floor in basement -Fireblock vertical to horizontal at furred down in basement -2x4 laid flat at furred down in basement 3’ and more must be attached to the floor joists to support the ceiling load -complete furred down bracing through rec room in basement -security blocking basement door
All Rough Inspection - Residential Failed 10/13/2020 10/13/2020 10/13/2020
Misc
Corrective Action Required
10/13/2020
-seal top plate penetrations bedroom #2 (unused bores) -Fireblock vertical to horizontal at furred down in basement - S wall
All Rough Inspection - Residential Passed 10/14/2020 10/14/2020 10/14/2020
Misc
Resolved
10/14/2020
Sewer Service Inspection - R Passed 11/12/2020 (11:00) 11/12/2020 11/12/2020
Water Service Inspection - R Partial 11/12/2020
Misc
Informational
11/12/2020
- PARTIAL INSPECTION ON PEX FROM YARD TO ENTRANCE AT HOME, OK TO COVER PORTION INSPECTED - TAP, COPPER, AND METER TO BE INSPECTED
Water Service Inspection - R Passed 11/13/2020 (9:30) 11/13/2020 11/13/2020
Misc
Resolved
11/13/2020
- PARTIAL INSPECTION ON PEX FROM YARD TO ENTRANCE AT HOME, OK TO COVER PORTION INSPECTED - TAP, COPPER, AND METER TO BE INSPECTED
Piers/Caissons Inspection - Residential Passed 12/11/2020
Miscellaneous Correction
Informational
12/11/2020
-Completed by third party 6/26/20
Occupancy Inspection - Codes Residential Failed 12/11/2020 12/11/2020 12/11/2020
Miscellaneous Correction
Corrective Action Required
12/11/2020
-Sidewalk and driveway final inspections still pending -Complete final grade and sod -Splash blocks and sump pump extension to 36” away from foundation -Provide dead bolt at front door -Provide lock and secondary lock at sliding door -Provide (2) 3” screws per hinge in basement door -Install fixture at open box under deck -Attic access in garage to be 30” height clearance for access, also provide non combustible cover for attic access -Provide egress ladder at window wells -Seal penetration at intersytem bonding bar and disconnect at back
Driveway Inspection Passed 12/14/2020
Misc
Informational
12/14/2020
On Monday, 12-14-2020. I preformed a visual inspection of a driveway in front of home and found drive acceptable and pass city standards.
Sidewalk Inspection Passed 12/14/2020
Misc
Informational
12/14/2020
On Monday 12-14-2020. I provided a sidewalk inspection that passed city standards.
Plot Plan Inspection Passed 12/21/2020 12/21/2020 12/21/2020
Occupancy Inspection - Codes Residential Full C of O 12/21/2020 12/21/2020 12/21/2020
Miscellaneous Correction
Resolved
12/21/2020
Documents & Images
Date Uploaded File Type Document Name
06/09/2020 Application Form HT #15 - PERMIT APPLICATION
06/09/2020 15 HAWTHORNE RIDGE ROOF LAYOUT- signed
06/09/2020 LOT 15 FINAL
06/09/2020 HT #15 - Newhaven - Mediterranean - Sheets- signed
06/09/2020 400302
06/11/2020 Plans APPROVED HOUSE PLANS
06/11/2020 Drawing APPROVED TRUSS LAYOUT
06/11/2020 Specifications APPROVED TRUSS PACKAGE
06/12/2020 Plans APPROVED Elevations
06/12/2020 Letter Codes Residential Plan Review
06/17/2020 Engineer Report/Study 20-02-24_MDP Memo_Lots 15-18
06/17/2020 Plot Plan APPROVED PLOT PLAN
06/17/2020 Receipt Receipt for transaction:2020-003125
06/17/2020 Letter DS Building Permit
06/23/2020 Letter Lot 15 Hawthorne Ridge Soil Inspection
06/30/2020 Lot 15 Hawthorne Ridge Subgrade ReInspection (002)
07/07/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter Lot 15 Hawthorne Ridge Footing Inspection
07/09/2020 Lot 15 Hawthorne Ridge Wall Inspection
07/21/2020 Letter INSPECTION SUMMARY
07/22/2020 Lot 51 Hawthorne Ridge Footing Inspection
10/09/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter Field Certificate of Occupancy
12/21/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home