Summary
PRRES20201494
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
06/04/2020
06/10/2020
10/05/2020
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
CURTIS@SABHOMES.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/09/2020 06/09/2020
Dylan Eppert
Residential Plan Review Approved 06/09/2020 06/09/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $935.21 $935.21 Paid 06/10/2020
8331507-Sewer Connection Fee $420.00 $420.00 Paid 06/10/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 06/10/2020
Water Meter Fee $425.02 $425.02 Paid 06/10/2020
Right of Way Permit Fee $80.00 $80.00 Paid 06/10/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/10/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 6/22/2020 (10:30) 6/22/2020 at 10:50 AM 06/22/2020
Underslab Plumbing Inspection - Residential Passed 6/23/2020 6/23/2020 at 9:25 AM 06/23/2020
Water Service Inspection - R Passed 6/23/2020 (11:30) 6/23/2020 at 1:05 PM 06/23/2020
Piers/Caissons Inspection - Residential Passed 7/9/2020 (1:00) 7/9/2020 at 2:30 PM 07/09/2020
Electrical Service Inspection Passed 7/27/2020 7/27/2020 07/27/2020
Gas Service Inspection - Residential Failed 7/27/2020 7/27/2020 07/27/2020
Misc
Corrective Action Required
07/27/2020
-Provide min ten psi test pressure
All Rough Inspection - Residential Failed 7/27/2020 7/27/2020 at 7:50 AM 07/27/2020
Misc
Corrective Action Required
07/27/2020
FRAMING: -Brace ends of lvl beam above great room from rotation -Install ceiling joist hangers at lvl connections above stair -Move roof support struts above front bedroom closet door to bearing wall -Fb steel column space at basement stair -Toe nail all joists to basement top plates and sill plates per code -Install hangers for joist connections to beam in basement ELECTRICAL: -Over filled double gang box at kitchen garage wall (38.25 cu inches full) -Install a wall receptacle at foyer wall wider than 3 ft MECHANICAL: -Provide combustion air openings per code -Unblock return air path in wall outside basement bedroom PLUMBING: -Combination waste&vent is only allowed for floor drain, sinks, and drinking fountain. Not allowed for tub trap. Plus, the length exceeds to limit anyway **OK TO INSULATE
All Rough Inspection - Residential Failed 7/29/2020 7/29/2020 at 9:00 AM 07/29/2020
Misc
Corrective Action Required
07/27/2020
FRAMING: -Brace ends of lvl beam above great room from rotation **above oven MECHANICAL: -Provide combustion air openings per code **OK TO INSULATE
Gas Service Inspection - Residential Failed 7/29/2020 7/29/2020 07/29/2020
Misc
Corrective Action Required
07/27/2020
-Provide min ten psi test pressure **still at 2 psi
Gas Service Inspection - Residential Passed 7/30/2020 07/30/2020
Misc
Resolved
07/30/2020
-Provide min ten psi test pressure **still at 2 psi
All Rough Inspection - Residential Passed 7/30/2020 at 8:55 AM 07/30/2020
Misc
Resolved
07/30/2020
-Provide combustion air openings per code **OK TO ROCK
Driveway Inspection Partial 8/27/2020 8/27/2020 08/27/2020
Misc
Informational
08/27/2020
8/27/20 Thursday Driveway - forms and materials passed pre-inspection. Note: ADA ramp was moved from driveway to the South a panel away from the end of sidewalk. Engineering firm was made aware of changes need and will resubmit required changes. See document pictures.
Sidewalk Inspection Partial 9/29/2020 08/27/2020
Misc
Informational
08/27/2020
8/27/20 Thursday 1:51PM Sidewalk - forms and materials passed pre-inspection. Note: ADA ramp was add to sidewalk and removed from driveway due to the sidewalk ending at the beginning of drive. See document pictures.
Driveway Inspection Passed 8/31/2020 8/31/2020 09/01/2020
Misc
Informational
09/01/2020
Misc
Informational
09/01/2020
9/1/20 Tuesday Driveway - forms and materials was passed pre-inspection 8/27/20 Thursday. Final inspection of Driveway - final inspection was perform & passed 8/31/20 Monday.
Occupancy Inspection - Codes Residential Temporary C of O 9/29/2020 9/29/2020 09/29/2020
Misc
Corrective Action Required
09/29/2020
-Sidewalk not approved on record -Sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Install CO/smoke alarm outside bedroom in mud area -Install dedicated single plug receptacle for AV in mechanical space -Remove paper facing from insulation
Sidewalk Inspection Passed 8/28/2020 (11:00) 8/28/2020 09/29/2020
Misc
Informational
08/27/2020
8/27/20 Thursday 1:51PM Sidewalk - forms and materials passed pre-inspection. Note: ADA ramp was add to sidewalk and removed from driveway due to the sidewalk ending at the beginning of drive. See document pictures.
Misc
Informational
09/29/2020
9/28/20 Tuesday Sidewalk & ADA Ramp - Passed final inspection.
Occupancy Inspection - Codes Residential Full C of O 10/5/2020 10/5/2020 10/05/2020
Misc
Resolved
10/05/2020
-Sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Install CO/smoke alarm outside bedroom in mud area -Install dedicated single plug receptacle for AV in mechanical space -Remove paper facing from insulation
Documents & Images
Date Uploaded File Type Document Name
06/04/2020 MO104 - Excise Tax Application 6.4.2020
06/04/2020 MO104 - Permit Application 6.4.2020
06/05/2020 MO104 - Final Plot Plan 6_5_2020
06/05/2020 MO104 - Air Combustion Calculation
06/05/2020 MO104 - Engineered Plans 6_4_2020
06/09/2020 Plans APPROVED HOUSE PLAN
06/09/2020 APPROVED AIR CALCULATIONS
06/09/2020 Plot Plan APPROVED PLOT PLANS
06/10/2020 Receipt Receipt for transaction:2020-002823
06/10/2020 Letter DS Building Permit
06/16/2020 M L Crose 4720 NE Saratoga Ct LSMO Monticello Lot 104 SAB Permit 2020-1494 3rd Party Footing Inspection Report 6-15-20
06/23/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/29/2020 Letter INSPECTION SUMMARY
07/29/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
08/27/2020 image.jpg
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter Codes Temporary Certificate of Occupancy
09/29/2020 Letter DE-Daily Inspection Summary
10/05/2020 Letter Codes Final Certificate of Occupancy
10/05/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home