Permit Application Status

PRRES20201372


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201372
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED PATIO
05/28/2020
08/05/2020
07/08/2022
Locations
Contacts
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
YANCIK@SBCGLOBAL.NET  
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
PEC JOSEPH J & CATHY WILSON PEC, Address:4701 NE FREEHOLD DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/01/2020 06/01/2020
Kim Brennan
Easements
Corrective Action Required
05/29/2020

All easements with dimensions must be provided on the plot plan. Please show 20' U/E along NE Goshon Dr.
Residential Plan Review Approved 06/01/2020 05/29/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,005.34 $1,005.34 Paid 06/22/2020
8331507-Sewer Connection Fee $450.00 $450.00 Paid 06/22/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 06/22/2020
Water Meter Fee $425.02 $425.02 Paid 06/22/2020
Right of Way Permit Fee $80.00 $80.00 Paid 06/22/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 7/23/2020 7/23/2020 at 8:00 AM 07/23/2020
Sewer Service Inspection - R Passed 7/29/2020 (2:00) 7/29/2020 at 2:40 PM 07/29/2020
Water Service Inspection - R Passed 7/30/2020 (1:00) 7/30/2020 at 1:10 PM 07/30/2020
Erosion Control Inspection Residential Failed 7/30/2020 07/30/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/30/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Piers/Caissons Inspection - Residential Passed 8/5/2020 (10:15) 8/5/2020 08/05/2020
Erosion Control Inspection Residential Failed 09/08/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/30/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Misc
Corrective Action Required
09/08/2020
9/8/20 9:35AM Silt fencing down around property a small amount of brush and sediment on street due to erosion control failure.
Gas Service Inspection - Residential Passed 10/7/2020 10/7/2020 10/07/2020
Electrical Service Inspection Failed 10/7/2020 10/7/2020 10/07/2020
Misc
Corrective Action Required
10/07/2020
-Drive the grounding rod into ground -The grounding conductor must be wedged between the teeth grooves of the rebar clamp
All Rough Inspection - Residential Failed 10/7/2020 10/7/2020 10/07/2020
Misc
Corrective Action Required
10/07/2020
**REPAIR EROSION CONTROL ALONG THE STREET FRAMING: -Provide plan on site -Nail exterior wall siding to sill plate @6” oc -Provide flashing above window trim or extend trim to the upper trim -All anchor bolts on the garage shall occur within the middle 1/3 of sill plate; anchor sill plate within 12” of breaks -Nail corner studs per code (16d @12” or equivalent) -Support ridge above garage -Nail stud and strap top plate break at garage/entry wall intersection -Reinforce exterior wall studs not continuous from floor to ceiling at master closet -Rear patio CSPF wall -Install rafter ties near top ridge -Solid block cantilevered joists below fireplace and cantilevered joists at the other side of house -Provide solid support under 24” lvl point load; nail together support studs -Notched joist above front basement bedroom -Basement escape window wells must have proper clearance and not be obstructed by cantilevered floor PLUMBING: -Fix water leaking at clothes washer trap -Protect plumbing at wet bar and at basement bedroom -Support DWV plumbing at maximum 4 ft interval; water lines at max 48” interval ELECTRICAL: -Support the AC circuit cable at maximum 4.5 ft interval **OK TO INSULATE
All Rough Inspection - Residential Failed 10/13/2020 10/13/2020 10/13/2020
Misc
Corrective Action Required
10/07/2020
**REPAIR EROSION CONTROL ALONG THE STREET. NO FURTHER INSPECTION IF NOT IN COMPLIANCE FRAMING: -Provide solid support under 24” lvl point load; nail together support studs **The return air from the basement bedroom is now blocked off. The mechanical guy will have to re-route the return air PLUMBING: -Protect plumbing at basement bedroom **Protect 3" pvc at bottom wall plate -Support DWV plumbing at maximum 4 ft interval **above basement bathroom
Electrical Service Inspection Failed 10/13/2020 10/13/2020 10/13/2020
Misc
Corrective Action Required
10/07/2020
-Drive the grounding rod into ground
All Rough Inspection - Residential Passed 10/16/2020 10/16/2020 10/16/2020
Misc
Resolved
10/16/2020
FRAMING: -Provide solid support under 24” lvl point load; nail together support studs **The return air from the basement bedroom is now blocked off. The mechanical guy will have to re-route the return air PLUMBING: -Protect plumbing at basement bedroom **Protect 3" pvc at bottom wall plate -Support DWV plumbing at maximum 4 ft interval **above basement bathroom
Electrical Service Inspection Failed 10/16/2020 10/16/2020 10/16/2020
Misc
Corrective Action Required
10/13/2020
-Drive the grounding rod into ground **why the rod is still not driven into the ground? I would like to remind you that this is the 3RD failed inspection.
Electrical Service Inspection Passed 10/22/2020 10/22/2020 10/22/2020
Misc
Resolved
10/22/2020
-Drive the grounding rod into ground **why the rod is still not driven into the ground? I would like to remind you that this is the 3RD failed inspection.
Sidewalk Inspection Partial 11/4/2020 (P.M.) 11/4/2020 11/04/2020
Misc
Informational
11/04/2020
11-4-20 1:28pm The forms are set and are ADA at this time. The aggregate is compacted. The contractor knows to use white cure.
Driveway Inspection Partial 11/4/2020 11/04/2020
Misc
Informational
11/04/2020
11-4-20 1:39pm The forms are set and the aggregate is compacted. The contractor knows to stay ADA compliant.
Sidewalk Inspection Partial 11/5/2020 (P.M.) 11/5/2020 11/05/2020
Misc
Informational
11/04/2020
11-4-20 1:28pm The forms are set and are ADA at this time. The aggregate is compacted. The contractor knows to use white cure.
Sidewalk Inspection Partial 11/05/2020
Misc
Informational
11/05/2020
11-4-20 1:28pm The forms are set and are ADA at this time. The aggregate is compacted. The contractor knows to use white cure. 11-5-20 The sidewalk in front of the house has the forms set to ADA spec at this time and the aggregate is compacted.
Sidewalk Inspection Passed 11/9/2020 11/9/2020 11/11/2020
Misc
Informational
11/05/2020
11-4-20 1:28pm The forms are set and are ADA at this time. The aggregate is compacted. The contractor knows to use white cure. 11-5-20 The sidewalk in front of the house has the forms set to ADA spec at this time and the aggregate is compacted.
Misc
Informational
11/11/2020
Sidewalk - passed final inspection.
Driveway Inspection Passed 11/9/2020 11/9/2020 11/12/2020
Misc
Informational
11/04/2020
11-4-20 1:39pm The forms are set and the aggregate is compacted. The contractor knows to stay ADA compliant.
Misc
Informational
11/11/2020
Driveway - passed final inspection.
Erosion Control Inspection Residential Passed 06/30/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/30/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Misc
Resolved
06/30/2022
9/8/20 9:35AM Silt fencing down around property a small amount of brush and sediment on street due to erosion control failure.
Occupancy Inspection - Codes Residential Failed 6/30/2022 6/30/2022 06/30/2022
Misc
Corrective Action Required
06/30/2022
-Clean out dirt inside water meter to gravel bed -Provide sewer tracer wire port at grade -Pendant light in master bathroom cannot be within the bathtub zone -Install secondary lock for the slide door per security code -Install smoke alarm in rear basement bedroom
Occupancy Inspection - Codes Residential Full C of O 7/8/2022 07/08/2022
Misc
Resolved
07/08/2022
-Clean out dirt inside water meter to gravel bed -Provide sewer tracer wire port at grade
Documents & Images
Date Uploaded File Type Document Name
05/28/2020 Letter Permit Application and license tax
05/29/2020 Plans Approved Drawings
05/29/2020 Letter Codes Residential Plan Review
06/01/2020 Plot Plan Approved Plot Plan
06/22/2020 Receipt Receipt for transaction:2020-003353
07/06/2020 Letter 3rd Party Footing Inspection Report 7-2-20
07/23/2020 Letter INSPECTION SUMMARY
07/29/2020 Letter INSPECTION SUMMARY
07/30/2020 Letter INSPECTION SUMMARY
08/05/2020 Letter INSPECTION SUMMARY
08/05/2020 Letter INSPECTION SUMMARY
08/05/2020 Letter DS Building Permit
09/08/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/05/2020 Letter INSPECTION SUMMARY
11/05/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
01/13/2021 92 SPRINKLER
01/15/2021 92 monticello backflow
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/08/2022 Letter Field Certificate of Occupancy
07/08/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home