Summary
PRRES20200317
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY PARTIALLY FINISHED BASEMENT COVERED DECK
02/11/2020
02/18/2020
08/10/2020
09/16/2021
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
PERMITTING@JFECONSTRUCTION.COM  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/18/2020 02/13/2020
Steve Conrick
Spot elevations
Corrective Action Required
02/13/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. Does the rear yard meet the 2 % minimum slope?
100-year floodplain
Corrective Action Required
02/13/2020

100-year floodplain, where applicable, must be shown on the plot plan. (Foundation elevation certificate required prior to occupancy)
As-graded plot plan
Corrective Action Required
02/13/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 02/18/2020 02/13/2020
Steve Conrick
Plot Plan Review Rejected 02/13/2020 02/12/2020
Steve Conrick
Spot elevations
Corrective Action Required
02/12/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. Does the rear yard meet the 2 % minimum slope?
100-year floodplain
Corrective Action Required
02/12/2020

100-year floodplain, where applicable, must be shown on the plot plan. (Foundation elevation certificate required prior to occupancy)
As-graded plot plan
Corrective Action Required
02/12/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 02/13/2020 02/12/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,142.72 $1,142.72 Paid 02/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/18/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/18/2020
8331507-Sewer Connection Fee $510.00 $510.00 Paid 02/18/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 02/18/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 02/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Partial 3/25/2020 3/25/2020 03/25/2020
Misc
Corrective Action Required
03/25/2020
- provide 3rd party inspection for drilled piers in 48 hours -
Sewer Service Inspection - R Passed 4/6/2020 (9:30) 4/6/2020 04/06/2020
Water Service Inspection - R Passed 4/6/2020 (9:30) 4/6/2020 04/06/2020
Underslab Plumbing Inspection - Residential Failed 4/9/2020 4/9/2020 04/09/2020
Misc
Corrective Action Required
04/09/2020
- work incomplete -
Underslab Plumbing Inspection - Residential Passed 4/16/2020 4/16/2020 at 7:14 AM 04/16/2020
Misc
Resolved
04/16/2020
Erosion Control Inspection Residential Failed 06/04/2020
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/04/2020
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 6/9/2020 6/9/2020 06/09/2020
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/04/2020
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/09/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Passed 09/29/2020
Misc
Resolved
09/29/2020
-Deficient erosion control installation, shall be in compliance within two days. No further inspections until complete -Street cleanup required immediately. No further inspections until complete -Remove overgrown weeds and vegetation -Maintain gravel filter at driveway
Erosion Control Inspection Residential Failed 01/07/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/09/2020
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/09/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Misc
Informational
01/07/2021
1-7-21 3:45pm There is no silt fence on back side of the lot and this needs addressed ASAP.
All Rough Inspection - Residential Failed 4/27/2021 4/27/2021 04/27/2021
Misc
Corrective Action Required
04/27/2021
-Install flashing above both garage doors -Install exterior doors -Minimum 12” field 6” edge exterior sheathing fastening. Also see sheathing below top plate in bedroom/office -solid block, Insulate and provide exterior bottoms at floor cantilevers -insulate exterior HVAC furr out -Braced wall method CS-PF framing and fastening per detail, Wall between dining and four seasons -Provide engineered solution for rafters bearing on blocks throughout -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Midpoint strap for all vertical 2 inch smaller DWV -Provide proper nail protection at top and bottom plate Penetrations, plumbing/Radon throughout -Repair damaged areas of vapor barrier -Fireblock top plate Penetration in dining room -Fireblock vertical to horizontal above four seasons fireplace -Security blocking exterior doors -Strap non-continuous studs at gable walls -All ridges, hips and valleys one nominal size larger than intercepting rafters per plan -Hardwired and interconnected smoke/carbon alarm Required outside of sleeping area, Front bedroom/office -Repair vertical to horizontal fireblock at entry -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. Required on both sides of top plate -Provide nail protection of water distribution piping in master shower at drop ceiling Penetrations -Fireblock vertical to horizontal with approved materials, wall between fireplace and master bed, where Fireplace concealed space opens into attic space above master bed ceiling level -Tighten anchor bolts throughout -Seal all joints in ductwork -Provide engineered solution four cut top plate at HVAC duct out the basement wood framed wall, also address minimum exterior sheathing fastening at this location -Maintain clearance to combustibles at water heater gas vent -Properly fireblock vertical to horizontal at all soffit/wall connections -Seal penetrations in floor joists intended to be used as Plenum -Electrical conductors may not run the long dimension in plenums -Roof framing support per plans -Collar ties or straps at ridges -rafters not to offset more than 1” at ridge connections
All Rough Inspection - Residential Passed 5/6/2021 5/6/2021 05/06/2021
Misc
Resolved
05/06/2021
-Install flashing above both garage doors -Install exterior doors -Minimum 12” field 6” edge exterior sheathing fastening. Also see sheathing below top plate in bedroom/office -solid block, Insulate and provide exterior bottoms at floor cantilevers -insulate exterior HVAC furr out -Braced wall method CS-PF framing and fastening per detail, Wall between dining and four seasons -Provide engineered solution for rafters bearing on blocks throughout -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Midpoint strap for all vertical 2 inch smaller DWV -Provide proper nail protection at top and bottom plate Penetrations, plumbing/Radon throughout -Repair damaged areas of vapor barrier -Fireblock top plate Penetration in dining room -Fireblock vertical to horizontal above four seasons fireplace -Security blocking exterior doors -Strap non-continuous studs at gable walls -All ridges, hips and valleys one nominal size larger than intercepting rafters per plan -Hardwired and interconnected smoke/carbon alarm Required outside of sleeping area, Front bedroom/office -Repair vertical to horizontal fireblock at entry -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. Required on both sides of top plate -Provide nail protection of water distribution piping in master shower at drop ceiling Penetrations -Fireblock vertical to horizontal with approved materials, wall between fireplace and master bed, where Fireplace concealed space opens into attic space above master bed ceiling level -Tighten anchor bolts throughout -Seal all joints in ductwork -Provide engineered solution four cut top plate at HVAC duct out the basement wood framed wall, also address minimum exterior sheathing fastening at this location -Maintain clearance to combustibles at water heater gas vent -Properly fireblock vertical to horizontal at all soffit/wall connections -Seal penetrations in floor joists intended to be used as Plenum -Electrical conductors may not run the long dimension in plenums -Roof framing support per plans -Collar ties or straps at ridges -rafters not to offset more than 1” at ridge connections
Electrical Service Inspection Passed 5/13/2021 5/13/2021 05/12/2021
Gas Piping Inspection - Residential Passed 5/13/2021 5/13/2021 05/12/2021
Gas Service Inspection - Residential Passed 5/13/2021 5/13/2021 05/12/2021
Driveway Inspection Passed 6/3/2021 6/3/2021 06/03/2021
Misc
Informational
06/03/2021
On Thursday, 6-03-2021. I performed and passed a driveway inspection at the aforementioned location.
Sidewalk Inspection Passed 6/3/2021 6/3/2021 06/03/2021
Misc
Informational
06/03/2021
On Thursday, 6-03-2021. I performed and passed sidewalk inspection for this location.
Footing Inspection - Residential Passed 8/25/2021 08/25/2021
Misc
Resolved
08/25/2021
- provide 3rd party inspection for drilled piers in 48 hours -
Occupancy Inspection - Codes Residential Failed 8/25/2021 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/25/2021
-Final grade and sod -Restore erosion control at front of lot until sod is in place -GFCI at master bathroom toilet room won't reset -GFCI at dishwasher won't trip -Install light fixtures above kitchen sink -Receptacle at sink in garage required to be GFCI -Receptacle at wet bar within 6' of sink required to be GFCI -Set attic access panel -Complete exterior drain tile -Water meter required to be at 14" to 18" to top of meter can
Occupancy Inspection - Codes Residential Temporary C of O 9/1/2021 9/1/2021 09/01/2021
Misc
Corrective Action Required
08/25/2021
TCO Until 9-29-21 -Final grade and sod -Maintain erosion control at front of lot until sod is in place -Water meter required to be at 14" to 18" to top of meter can -Obtain lawn irrigation permit and backflow certification
Erosion Control Inspection Residential Passed 09/14/2021
Plot Plan Inspection Passed 09/14/2021
Occupancy Inspection - Codes Residential Failed 9/14/2021 9/14/2021 09/14/2021
Misc
Corrective Action Required
09/01/2021
TCO Until 9-29-21 -Obtain lawn irrigation permit and backflow certification
Occupancy Inspection - Codes Residential Full C of O 9/16/2021 9/16/2021 09/16/2021
Misc
Resolved
09/16/2021
TCO Until 9-29-21 -Obtain lawn irrigation permit and backflow certification
Documents & Images
Date Uploaded File Type Document Name
02/12/2020 Letter Codes Residential Plan Review
02/18/2020 Receipt Receipt for transaction: 2020-000652
02/18/2020 Letter DS Building Permit
02/20/2020 Plot Plan DOC022020-02202020091552
03/25/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/24/2020 Engineer Report/Study Final_2020.04.16_BSlab_LSMO_Concrete Design
06/04/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
09/16/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
12/03/2020 Approved Plans APPROVED PLANS
01/07/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
05/05/2021 1904 SW River Run Drive_Framing Evaluation Report_5-5-21
05/06/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter INSPECTION SUMMARY
07/22/2021 1904 SW River Run Rd_PIER INSP_2020-03-20
08/19/2021 Plot Plan approved as graded plot plan
08/25/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
09/01/2021 Letter Codes Temporary Certificate of Occupancy
09/14/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/16/2021 Letter Codes Final Certificate of Occupancy
09/16/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home